← Iron Gate

Spill evidence · River Hub

Iron Gate

Combined sewer overflow · TWL00241 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Wednesday, 7 January 2026
Started
7 Jan 2026, 01:20
Ended
7 Jan 2026, 01:54
Duration
34 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Holland Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
07/01/2026 (spill day)0.6 mmrain
06/01/20267 mmrain
05/01/20260 mmdry
04/01/20260 mmdry
03/01/20260 mmdry

River flow that day: 4.185 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 9.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00241). Rainfall: EA Hydrology gauge 72bf626d-8710-47ca-8a5c-464388561754. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.
Spill evidence — Iron Gate — River Thames Data