← Long Reach STW

Spill evidence · River Hub

Long Reach STW

Storm overflow at the works · TWL00277 · feeds LONDON (Long Reach STW)
Wet weather

The discharge

Spill day
Tuesday, 3 February 2026
Started
3 Feb 2026, 21:22
Ended
4 Feb 2026, 01:32
Duration
4 hours 10 minutes
Receiving water
Thames (Egham to Teddington)
Parish
Stone

Rainfall evidence

Daily rainfall at the matched gauge (Crossness) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
03/02/2026 (spill day)5.6 mmrain
02/02/20260 mmdry
01/02/20265.2 mmrain
31/01/20260 mmdry
30/01/20263.6 mmrain

River flow that day: 30.693 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00277). Rainfall: EA Hydrology gauge f5fc1678-555b-4d8f-82fa-9a07a9da0987. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.