← Long Reach STW

Spill evidence · River Hub

Long Reach STW

Storm overflow at the works · TWL00277 · feeds LONDON (Long Reach STW)
Wet weather

The discharge

Spill day
Monday, 26 February 2024
Started
26 Feb 2024, 10:26
Ended
26 Feb 2024, 15:56
Duration
5 hours 30 minutes
Receiving water
Thames (Egham to Teddington)
Parish
Stone

Rainfall evidence

Daily rainfall at the matched gauge (Crossness) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
26/02/2024 (spill day)0 mmdry
25/02/20244.4 mmrain
24/02/20240 mmdry
23/02/20241.6 mmrain
22/02/20249.8 mmrain

River flow that day: 19.959 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
38 counted spills · 332 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00277). Rainfall: EA Hydrology gauge f5fc1678-555b-4d8f-82fa-9a07a9da0987. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.
Spill evidence — Long Reach STW — River Thames Data