← Beckton STW

Spill evidence · River Hub

Beckton STW

Storm overflow at the works · TWL00029 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Tuesday, 2 June 2026
Started
2 Jun 2026, 09:10
Ended
2 Jun 2026, 09:42
Duration
32 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Gascoigne Road) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
02/06/2026 (spill day)6.8 mmrain
01/06/202619.13 mmrain
31/05/20260.01 mmdry
30/05/20260 mmdry
29/05/20260 mmdry

River flow that day: 1.471 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00029). Rainfall: EA Hydrology gauge fff07329-3df5-45bc-915a-6e7274ece1f8. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.
Spill evidence — Beckton STW — River Thames Data