← Heathwall (nine Elms) pumping station & Storm pumping station

Spill evidence · River Hub

Heathwall (nine Elms) pumping station & Storm pumping station

Pumping station overflow · TWL00220 · feeds LONDON (Crossness STW)
Wet weather

The discharge

Spill day
Sunday, 25 February 2024
Started
25 Feb 2024, 22:00
Ended
26 Feb 2024, 00:00
Duration
2 hours
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Holland Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/02/2024 (spill day)4.8 mmrain
24/02/20240 mmdry
23/02/20242 mmrain
22/02/202414.8 mmrain
21/02/20244.2 mmrain

River flow that day: 34.941 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
39 counted spills · 137 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00220). Rainfall: EA Hydrology gauge 72bf626d-8710-47ca-8a5c-464388561754. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.