← Low Level Xx, Grosvenor Ditch, Millb
Spill evidence · River Hub
Low Level Xx, Grosvenor Ditch, Millb
Combined sewer overflow · TWL00596 · feeds LONDON (Becton STW)
Wet weather
The discharge
- Spill day
- Thursday, 4 December 2025
- Started
- 4 Dec 2025, 13:14
- Ended
- 4 Dec 2025, 14:38
- Duration
- 1 hour 24 minutes
- Receiving water
- Thames (Egham to Teddington)
- Parish
- —
Rainfall evidence
Daily rainfall at the matched gauge (Holland Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 04/12/2025 (spill day) | 5.2 mm | rain |
| 03/12/2025 | 0.8 mm | rain |
| 02/12/2025 | 5.2 mm | rain |
| 01/12/2025 | 2.8 mm | rain |
| 30/11/2025 | 1.4 mm | rain |
River flow that day: 14.803 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 5.7 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
- EA annual return (2025)
- 22 counted spills · 37 h total
- Monitor uptime (2025)
- 94% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00596). Rainfall: EA Hydrology gauge 72bf626d-8710-47ca-8a5c-464388561754. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.