← Pauls Pier

Spill evidence · River Hub

Pauls Pier

Combined sewer overflow · TWL00327 · feeds LONDON (Becton STW)
Dry spill

Evidence strength

Medium confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Monitor 96% operational that year

The discharge

Spill day
Tuesday, 25 March 2025
Started
25 Mar 2025, 17:04
Ended
26 Mar 2025, 10:10
Duration
17 hours 6 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Holland Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/03/2025 (spill day)0 mmdry
24/03/20250 mmdry
23/03/20250 mmdry
22/03/20257.4 mmrain
21/03/20250 mmdry

River flow that day: 2.183 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
0 counted spills · 0 h total
Monitor uptime (2025)
96% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00327). Rainfall: EA Hydrology gauge 72bf626d-8710-47ca-8a5c-464388561754. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.