← South Moreton STW
Spill evidence · River Hub
South Moreton STW
Storm overflow at the works · TWL00378 · feeds SOUTH MORETON STW
Wet weather
The discharge
- Spill day
- Friday, 10 April 2026
- Started
- 10 Apr 2026, 16:45
- Ended
- 10 Apr 2026, 18:00
- Duration
- 1 hour 15 minutes
- Receiving water
- Mill Brook and Bradfords Brook system, Wallingford
- Parish
- South Moreton
Rainfall evidence
Daily rainfall at the matched gauge (Benson) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 10/04/2026 (spill day) | 0.45 mm | rain |
| 09/04/2026 | 0 mm | dry |
| 08/04/2026 | 0 mm | dry |
| 07/04/2026 | 0 mm | dry |
| 06/04/2026 | 0 mm | dry |
River flow that day: 2.137 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 5.6 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00378). Rainfall: EA Hydrology gauge 1ad8ff76-625d-4ff1-82bd-9efcc5d41b2f_264254TP. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.