← South Moreton STW

Spill evidence · River Hub

South Moreton STW

Storm overflow at the works · TWL00378 · feeds SOUTH MORETON STW
Dry spill

Evidence strength

High confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Monitor 98% operational that year

The discharge

Spill day
Sunday, 10 November 2024
Started
10 Nov 2024, 15:15
Ended
10 Nov 2024, 22:45
Duration
7 hours 30 minutes
Receiving water
Mill Brook and Bradfords Brook system, Wallingford
Parish
South Moreton

Rainfall evidence

Daily rainfall at the matched gauge (Benson) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
10/11/2024 (spill day)0 mmdry
09/11/20240 mmdry
08/11/20240 mmdry
07/11/20240 mmdry
06/11/20240.09 mmdry

River flow that day: 2.27 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
261 counted spills · 5353 h total
Monitor uptime (2024)
98% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00378). Rainfall: EA Hydrology gauge 1ad8ff76-625d-4ff1-82bd-9efcc5d41b2f_264254TP. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.