← South Moreton STW

Spill evidence · River Hub

South Moreton STW

Storm overflow at the works · TWL00378 · feeds SOUTH MORETON STW
Wet weather

The discharge

Spill day
Saturday, 11 April 2026
Started
11 Apr 2026, 15:00
Ended
11 Apr 2026, 15:45
Duration
45 minutes
Receiving water
Mill Brook and Bradfords Brook system, Wallingford
Parish
South Moreton

Rainfall evidence

Daily rainfall at the matched gauge (Benson) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
11/04/2026 (spill day)0 mmdry
10/04/20260.45 mmrain
09/04/20260 mmdry
08/04/20260 mmdry
07/04/20260 mmdry

River flow that day: 2.382 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00378). Rainfall: EA Hydrology gauge 1ad8ff76-625d-4ff1-82bd-9efcc5d41b2f_264254TP. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.