Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Stewkley STW TWL00391 | 2050 | 217 ·24 | 143 61 events | -34% | 14.3× | Falling — behind | |
| Wheatley STW TWL00446 | 2050 | 160 ·24 | 76 65 events | -53% | 7.6× | Falling — behind | |
| Little Milton STW TWL00271 | 2050 | 168 ·24 | 64 40 events | -62% | 6.4× | Falling — behind | |
| Stone STW TWL00392 | 2050 | 157 ·24 | 44 49 events | -72% | 4.4× | Falling — behind | |
| Horton-cum-studley STW TWL00238 | 2050 | 76 ·24 | 38 26 events | -50% | 3.8× | Falling — behind | |
| Haddenham STW TWL00207 | 2050 | 76 ·24 | 37 30 events | -51% | 3.7× | Falling — behind | |
| Princes Risborough STW TWL00333 | 2050 | 95 ·24 | 36 24 events | -62% | 3.6× | Falling — behind | |
| Thame STW TWL00409 | 2050 | 105 ·24 | 30 27 events | -71% | 3× | Falling — behind | |
| Watlington STW TWL00433 | 2050 | 90 ·24 | 30 43 events | -67% | 3× | Falling — behind | |
| Chinnor STW TWL00093 | 2050 | 105 ·24 | 29 116 events | -72% | 2.9× | Falling — behind | |
| Wingrave STW TWL00453 | 2050 | 88 ·24 | 29 32 events | -67% | 2.9× | Falling — behind | |
| Waddesdon STW TWL00420 | 2050 | 63 ·24 | 25 15 events | -60% | 2.5× | Falling — behind | |
| Worminghall STW TWL00464 | 2050 | 93 ·24 | 23 44 events | -75% | 2.3× | Falling — behind | |
| Shabbington STW TWL00363 | 2050 | 67 ·24 | 23 10 events | -66% | 2.3× | Falling — behind | |
| Dorchester STW TWL00157 | 2050 | 63 ·24 | 15 18 events | -76% | 1.5× | Nearly there | |
| Aylesbury STW TWL00478 | 2050 | 54 ·24 | 13 16 events | -76% | 1.3× | Nearly there | |
| Dorton STW TWL00160 | 2050 | 54 ·24 | 12 22 events | -78% | 1.2× | Nearly there | |
| Chalgrove STW TWL00080 | 2050 | 147 ·24 | 8 12 events | -95% | 0.8× | Within the cap | |
| Rowsham STW TWL00355 | 2050 | 25 ·24 | 8 8 events | -68% | 0.8× | Within the cap | |
| Tetsworth STW TWL00408 | 2050 | 30 ·24 | 6 7 events | -80% | 0.6× | Within the cap | |
| Cuddington STW TWL00146 | 2050 | 135 ·24 | 4 3 events | -97% | 0.4× | Within the cap | |
| Forest Hill STW TWL00188 | 2050 | 5 ·24 | 3 4 events | -40% | 0.3× | Within the cap | |
| Marsworth pumping station TWL00296 | 2050 | 19 ·24 | 3 4 events | -84% | 0.3× | Within the cap | |
| Tring STW TWL00416 | 2050 | 2 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Long Crendon STW TWL00276 | 2050 | 19 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
| Manor Farm Road (sydenham) pumping station TWL00289 | 2050 | 4 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →