What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100114a · 832086a7 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ ADPAR WWTW ADPAR CEREDIGION | Complete 2025-26 | Adpar Storm Overflow |
| DCWW100127a · f57602bf | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BEULAH WWTW INLET SO BEULAH CERED'N | Complete 2025-26 | Beulah WwTW Storm Overflow |
| DCWW100133a · 9bf7f9bc | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BONCATH STW | Complete 2025-26 | Boncath WwTW Storm Overflow |
| DCWW100155a · cab2b16b | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CARDIGAN WWTW(STW) CARDIGAN | Complete 2025-26 | Cardigan WwTW Storm Overflow |
| DCWW100160a · d39cf3d9 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CENARTH (GLANYRAFON) | Complete 2025-26 | Cenarth WwTW Storm Overflow |
| DCWW100164a · 30ffe871 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CILGERRAN STW | Complete 2025-26 | Cilgerran WwTW Storm Overflow |
| DCWW100074a · a8248ded | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CWRTNEWYDD STW CWRTNEWTDD | Complete 2025-26 | Cwrtnewydd WwTW Storm Overflow |
| DCWW100076a · e0e664d8 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ DREFACH/VELINDRE WWTW | Complete 2025-26 | Llysnewydd Storm Overflow |
| DCWW100079a · 0dd665a3 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ HENLLAN STW | Complete 2025-26 | Henllan Storm Overflow |
| DCWW100235a · fadac404 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LAMPETER STW LAMPETER | Complete 2025-26 | Lampeter Storm Overflow |
| DCWW100248a · e7181ccc | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANDEWI BREFI WWTW LLANDEWI BREFI | Complete 2025-26 | Llanddewi Brefi WwTW Storm Overflow |
| DCWW100294a · 0c33ee8a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANYBYDDER WWTW CEREDIGION | Complete 2025-26 | Llanybydder Storm Overflow |
| DCWW100296a · 6651e5c2 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLECHRYD STW | Complete 2025-26 | Llechryd No 1 Storm Overflow |
| DCWW100328a · dbd89808 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PENCADER STW | Complete 2025-26 | Pencader WwTW Storm Overflow |
| DCWW100335a · aecb144f | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PENTRECWRT STW | Complete 2025-26 | Pentrecwrt WwTW Storm Overflow |
| DCWW100092a · 53da6f15 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PONTRHYDFENDIGAID STW | Complete 2025-26 | Pontrhydfendigaid Storm Overflow |
| DCWW100094a · c62bc27d | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ RHYDLEWIS | Complete 2025-26 | Rhydlewis South WwTW Storm Overflow |
| DCWW100393a · 1512e6ee | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ TREFRIW STW | Complete 2025-26 | Tregaron WwTw Storm Overflow |
| DCWW100109a · 3ed49f89 | W_U_MON4 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation at WwTW or last in line Sewage Pumping Station overflows WQ ABERCYCH STW | Due 2026-27 | Abercych Storm Overflow |
| DCWW100108a · c3c4cf66 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ ABERCYCH STW | Due 2026-27 | Abercych Storm Overflow |
| DCWW101594a · 27819417 | W_WFD_PG_IMP2 | Improvement | Implementation of actions to achieve Good status at a waterbody and / or site level due to Biological Oxygen Demand (BOD) in WaSC discharges relating to Dissolved Oxygen (DO) status of the waterbody WQ Beulah | Due 2026-27 | BEULAH (NR Aberporth) |
| DCWW101657a · f935f041 | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. WQ BONCATH | Due 2026-27 | BONCATH |
| DCWW102196a · a9572952 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARDIGAN NO 3 SPS STORM | Due 2026-27 | Cardigan Bridge Storm Overflow |
| DCWW102197a · 6db4d881 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARDIGAN NO 4 SPS EOF | Due 2026-27 | Quay Street Car Park Storm Overflow |
| DCWW102210a · 57f2b479 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARDIGAN WwTW STORM CSO | Due 2026-27 | Cardigan WwTW Storm Overflow |
| DCWW102123a · d439d4cc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CENARTH NO 1 SPS | Due 2026-27 | Cenarth South of Afon Storm Overflow |
| DCWW102143a · 901f019f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CILGERRAN&PENYBRYN PS NO 1 EOF | Due 2026-27 | Cilgerran No.1 Storm Overflow |
| DCWW100175a · b636adac | W_U_MON4 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation at WwTW or last in line Sewage Pumping Station overflows WQ CRIBYN STW | Due 2026-27 | Cribyn WwTW Storm Overflow |
| DCWW100176a · 14896ed6 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CRIBYN STW | Due 2026-27 | Cribyn WwTW Storm Overflow |
| DCWW101538a · e80f2ed2 | W_FISH_IMP1 | Improvement | Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage. Fish Fish Barrier Mitigation at asset 40414511 | Due 2026-27 | Water body only |
| DCWW101679a · 25d5c877 | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. WQ PONTRHYDYCEIRT | Due 2026-27 | PONTRHYDYCEIRT |
| DCWW102198a · 80ce3bb3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ST DOGMAELS MAIN PS | Due 2026-27 | St Dogmaels Main Storm Overflow |
| DCWW102199a · e6d2aaa8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ST DOGMAELS, REAR OF PH, MAESHYFRYD | Due 2026-27 | St. Dogmaels Maeshyfryd Street Storm Overflow |
| DCWW101649a · 035ad00d | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper WQ PENPRYS (7CDC1104) | Due 2027-28 | PONTRHYDYCEIRT |
| DCWW100700a · 89635c6d | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ TREGARON | Due 2027-28 | Tregaron WwTw Storm Overflow |
| DCWW100656a · 0e99d903 | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ TREGARON | Due 2027-28 | Tregaron WwTw Storm Overflow |
| DCWW101582a · 5d73b80b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ A Sewage Pumping Station at Llanwnen, Llanybydder | Due 2029-30 | Llanwnnen South Storm Overflow |
| DCWW101582a · 61facd07 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Aberbanc Sewage Pumping Station | Due 2029-30 | Aberbanc Storm Overflow |
| DCWW101085a · 0273ae24 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Aberbanc SPS, nr Newcastle Emlyn, SA44 5NP | Due 2029-30 | Aberbanc Storm Overflow |
| DCWW101781a · 6025ff17 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ ABERCYCH STW | Due 2029-30 | Water body only |
| DCWW101782a · 5c6bc431 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ ADPAR STW | Due 2029-30 | Water body only |
| DCWW101782b · 1b95a855 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ ADPAR WWTW ADPAR CEREDIGION | Due 2029-30 | Water body only |
| DCWW100889a · 67ddfbd6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ALLTYBLACCA, LLANYBYDDER, DYFED | Due 2029-30 | Alltyblaca Overflow |
| DCWW100695a · 7efe9f46 | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ BEULAH (NR ABERPORTH) | Due 2029-30 | Beulah WwTW Storm Overflow |
| DCWW101784a · 8962ff2f | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ BONCATH STW | Due 2029-30 | BONCATH |
| DCWW101582a · 14d0e472 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BRIDGE STREET CSO LAMPETER | Due 2029-30 | New Street Lampeter Storm Overflow |
| DCWW101114a · b33398b5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Bryn Steffan, Residential Development, Adj Aberaeron Road, Lampeter, SA48 8AW | Due 2029-30 | Water body only |
| DCWW101582a · f2c619ed | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cardigan - Penparc CSO | Due 2029-30 | Penparc Storm Overflow |
| DCWW102570a · 88653120 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cardigan - St.Mary Street | Due 2029-30 | St.Mary Street Storm Overflow |
| DCWW100904a · 8c8d4377 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CARDIGAN 1 | Due 2029-30 | Pont-Y-Cleifion Storm Overflow |
| DCWW100905a · bbb40673 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CARDIGAN 2 | Due 2029-30 | St.Mary Street Storm Overflow |
| DCWW100906a · f77a35b8 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Cardigan Bridge PS | Due 2029-30 | Cardigan Bridge Storm Overflow |
| DCWW101582a · 194b5ca3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cardigan Hospital CSO | Due 2029-30 | Pont-Y-Cleifion Storm Overflow |
| DCWW100907a · 5e20b946 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CARDIGAN PS NO.4 (CSO & EO) | Due 2029-30 | Quay Street Car Park Storm Overflow |
| DCWW100908a · 27c12671 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CARDIGAN SPS NO 5 (CSO & EO) | Due 2029-30 | Cardigan Cattle Market Storm Overflow |
| DCWW101786a · 6e157ac3 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CELLAN STW | Due 2029-30 | Water body only |
| DCWW101787a · b07007c2 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CENARTH 2 STW | Due 2029-30 | CENARTH NO 2 (GLANYRAFON) |
| DCWW101471a · 245dfedc | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CENARTH 2 STW (GLANYRAFON) | Due 2029-30 | Cenarth WwTW Storm Overflow |
| DCWW101010a · 9b2ed895 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CENARTH NO.1 SEWAGE PUMPING STATION | Due 2029-30 | Cenarth South of Afon Storm Overflow |
| DCWW100974a · 2a0e4a1a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CENARTH SEWAGE PUMPING STATION | Due 2029-30 | Cenarth South of Afon Storm Overflow |
| DCWW101582a · 05913d9f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cenarth Wastewater Treatment Works Inlet Storm Overflow | Due 2029-30 | Cenarth WwTW Storm Overflow |
| DCWW101787b · ba883dfd | W_HR_AMM_T_IMP1 | Improvement | Ammonia reduction to meet numeric permit limit
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ CENARTH WWTTW CENARTH CEREDIGION | Due 2029-30 | CENARTH NO 2 (GLANYRAFON) |
| DCWW100662a · ba4fa9b7 | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ CILGERRAN | Due 2029-30 | Cilgerran WwTW Storm Overflow |
| DCWW101582a · f6683b02 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cilgerran Flyght PS | Due 2029-30 | Cnwcau Storm Overflow |
| DCWW101455a · ba46f01a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Cilgerran Sewage Pumping Station | Due 2029-30 | Cilgerran No.1 Storm Overflow |
| DCWW101788a · 27ff6dbc | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CILGERRAN SEWAGE TREATMENT WORKS | Due 2029-30 | CILGERRAN |
| DCWW101788b · d57067b2 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ CILGERRAN STW | Due 2029-30 | CILGERRAN |
| DCWW102768a · 1568147d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CWM PLYSGOG CSO | Due 2029-30 | Off Church Street Cwm Plysgog Storm Overflow |
| DCWW101062a · 40d0855c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Cwmann SPS, Lampeter | Due 2029-30 | Cwmann Overflow |
| DCWW100923a · 3c5c0224 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CWRTNEWYDD SPS NO1 | Due 2029-30 | Cwrtnewydd WwTW Storm Overflow |
| DCWW101790a · fbf69c8d | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CWRTNEWYDD STW CWRTNEWTDD | Due 2029-30 | CWRTNEWYDD |
| DCWW100924a · b7a56de1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ DolwenSPS, Drefach, Llanybydder | Due 2029-30 | Dolwen Storm Overflow |
| DCWW101791a · 41190f60 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ Drefach/Velindre | Due 2029-30 | HENLLAN (NR Newcastle Emlyn) |
| DCWW101913a · 0b6ec3e6 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Ffostrasol WwTW | Due 2029-30 | Ffostrasol WwTW Overflow |
| DCWW101582a · ffc8d2f8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Gloster Row SPS | Due 2029-30 | Cardigan Cattle Market Storm Overflow |
| DCWW100595a · ab18e10e | W_U_IMP7(a-e) | Improvement | Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS Biological Oxygen Demand: Suspended Soilids WQ GREENFIELD TERRACE Septic Tank | Due 2029-30 | Water body only |
| DCWW100936a · 5a1c5c56 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Grove Park Estate, Cnwc-y-Dintir, Cardigan, SA43 1AX | Due 2029-30 | Water body only |
| DCWW101120a · 140ec900 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ GWBERT SEWAGE PUMPING STATION | Due 2029-30 | Gwbert Overflow |
| DCWW102521a · d8164f09 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HENLLAN (NR NEWCASTLE EMLYN) STW STORM | Due 2029-30 | Henllan Storm Overflow |
| DCWW101794a · 6b140e57 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ HENLLAN STW | Due 2029-30 | HENLLAN (NR Newcastle Emlyn) |
| DCWW101025a · f6f81a27 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ HOREB SEWAGE PUMPING STATION, LLANDYSUL, DYFED | Due 2029-30 | Water body only |
| DCWW101965a · a503a5c6 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Lampeter - No. 3, University | Due 2029-30 | Lampeter Campus Storm Overflow |
| DCWW102856b · 6e7c29a5 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ LAMPETER STW LAMPETER | Due 2029-30 | Water body only |
| DCWW101582a · 88e2e048 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llanddewi Brefi CSO | Due 2029-30 | Llanddewi Brefi Storm Overflow |
| DCWW101796a · 3ab59b4b | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANDYSSUL STW | Due 2029-30 | Water body only |
| DCWW101796b · fc7a8590 | W_HR_AMM_T_IMP1 | Improvement | Ammonia reduction to meet numeric permit limit
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ Llandysul Wastewater Treatment Works | Due 2029-30 | Water body only |
| DCWW101797a · 20c30ab6 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANFIHANGEL ARARTH STW | Due 2029-30 | LLANFIHANGEL-AR-ARTH |
| DCWW100927a · 06f35495 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANFIHANGEL-AR-ARTH STW | Due 2029-30 | Llanfihangel-ar-arth WwTW Overflow |
| DCWW101797b · 750f381f | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ LLANFIHANGEL-AR-ARTH STW | Due 2029-30 | LLANFIHANGEL-AR-ARTH |
| DCWW101798a · 36ca38c5 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANGYBI SEWAGE TREATMENT WORKS | Due 2029-30 | Water body only |
| DCWW101015a · 3c5e4dab | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Llanwnen SPS, Llanybydder | Due 2029-30 | Llanwnnen South Storm Overflow |
| DCWW100677a · 68d513b8 | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ LLANYBYDDER | Due 2029-30 | Llanybydder Storm Overflow |
| DCWW102248a · 8c819c7c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llanybydder - Oriel Jones | Due 2029-30 | Heol Llanbedr Llanybydder Storm Overflow |
| DCWW101036a · 3a36c36b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLECHRYD NO 1 SPS NEAR CARDIGAN DYFED | Due 2029-30 | Llechryd No 1 Storm Overflow |
| DCWW101582a · 1325a81f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llechryd SPS | Due 2029-30 | Llechryd No 1 Storm Overflow |
| DCWW101799b · 3630fe7a | W_HR_AMM_T_IMP1 | Improvement | Ammonia reduction to meet numeric permit limit
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ LLECHRYD STW | Due 2029-30 | Water body only |
| DCWW101799a · 76a762bc | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLECHRYD STW | Due 2029-30 | Water body only |
| DCWW101582a · c0b4a165 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llysnewydd SPS | Due 2029-30 | Llysnewydd Storm Overflow |
| DCWW100901a · 601d2ba6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Llysnewydd SPS, Velindre, Llandysul, Dyfed | Due 2029-30 | Llysnewydd Storm Overflow |
| DCWW100926a · 0019a203 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Manhole 7 CSO & EO from Llanybydder Terminal SPS, | Due 2029-30 | Llanybydder Cattle Market Storm Overflow |
| DCWW101582a · 9fd941e9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Newchapel STW CSO | Due 2029-30 | Newchapel WwTW Storm Overflow |
| DCWW100913a · 159e3f30 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Oriel Jones SPS, Llanybydder, Ceredigion | Due 2029-30 | Water body only |
| DCWW101582a · 9913f8cd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pencader Bridge CSO | Due 2029-30 | Pencader Bridge Storm Overflow |
| DCWW101582a · 1a8c278a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pencader SPS | Due 2029-30 | Pencader Storm Overflow |
| DCWW100882a · 5b08f47f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Pencader SPS, Pencader, Carms SA39 9ES | Due 2029-30 | Pencader Storm Overflow |
| DCWW101801b · efdf3dad | W_HR_AMM_T_IMP1 | Improvement | Ammonia reduction to meet numeric permit limit
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ PENCADER STW | Due 2029-30 | PENCADER |
| DCWW100883a · 123503fe | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENCADER STW PS | Due 2029-30 | Pencader WwTW Storm Overflow |
| DCWW101582a · 667cacfd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penrhiwllan SPS | Due 2029-30 | Penrhiwllan Storm Overflow |
| DCWW101109a · a145453d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Penrhiwllan SPS, Llandysul, Ceredigion SA44 5NG | Due 2029-30 | Penrhiwllan Storm Overflow |
| DCWW101802a · 0c760871 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ PENTRECWRT STW | Due 2029-30 | PENTRECWRT |
| DCWW101802b · 03f05c83 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ PENTRECWRT STW | Due 2029-30 | PENTRECWRT |
| DCWW101088a · cb26d231 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Pentrellwyn Pumping Station, Off Gorig Road, Pentrellwyn | Due 2029-30 | Water body only |
| DCWW101960a · 667fea3d | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Pontrhydfendgaid SPS | Due 2029-30 | Pontrhydfendigaid Storm Overflow |
| DCWW101883a · 1d52c691 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ Pontrhydyceirt STW Pontrhydyceirt | Due 2029-30 | PONTRHYDYCEIRT |
| DCWW101972a · 6aa4d148 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Rhos/Llangeler (Capel Seilo) SPS CSO | Due 2029-30 | Capel Silo Storm Overflow |
| DCWW100902a · aa3abf9b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ RHYDFACH PS | Due 2029-30 | Rhydfach Storm Overflow |
| DCWW101958a · ed2ff952 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Rhydlewis | Due 2029-30 | Rhydlewis South WwTW Storm Overflow |
| DCWW101582a · 7ca6e2c6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ RHYDLEWIS PS NO 1 | Due 2029-30 | Rhydlewis North PS Storm Overflow |
| DCWW100950a · f15956e7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ RHYDLEWIS PS NO 1 | Due 2029-30 | Rhydlewis North PS Storm Overflow |
| DCWW100951a · be7361fb | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ RHYDLEWIS PS NO 2 | Due 2029-30 | Rhydlewis South WwTW Storm Overflow |
| DCWW102707a · 37198d6d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Saron - A484 O.S.Maesgeler | Due 2029-30 | Saron Storm Overflow |
| DCWW101582a · 5308606f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Settled Storm Overflow at Ferwig Wastewater Treatment Works | Due 2029-30 | Verwig WwTW Storm Overflow |
| DCWW101582a · dbbfd2e6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Settled Storm Overflow at Llandewi Brefi Wastewater Treatment Works | Due 2029-30 | Llanddewi Brefi WwTW Storm Overflow |
| DCWW101582a · c0a4f587 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Silian PS Lampeter Ceredigion | Due 2029-30 | Silian Storm Overflow |
| DCWW101110a · c5ecd5d8 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Silian PS Lampeter, Ceredigion | Due 2029-30 | Silian Storm Overflow |
| DCWW101582a · e38cf18c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ St Dogmaels CSO | Due 2029-30 | Glanteifon Storm Overflow |
| DCWW101106a · e57e8ffb | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ST DOGMAELS NORTH END SPS (CSO & EO) | Due 2029-30 | St. Dogmaels No.2 Storm Overflow |
| DCWW100910a · d3059861 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ST DOGMAELS, JEWSONS CSO (ST DOGMAELS MAIN PS CSO & EO) | Due 2029-30 | St Dogmaels Main Storm Overflow |
| DCWW101582a · cef618fe | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Storm Overflow at Rhydlewis Wastewater Treatment Works | Due 2029-30 | Rhydlewis South WwTW Storm Overflow |
| DCWW101121a · aebe4d10 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TALGARREG WASTEWATER TREATMENT WORKS LIFT PUMPING STATION | Due 2029-30 | Talgarreg WwTW Storm Overflow |
| DCWW101582a · 6edc8b3b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Tregaron SPS (CSO and EO | Due 2029-30 | Tregaron Storm Overflow |
| DCWW100900a · 9201df4d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Tregaron SPS, High Street, Tregaron | Due 2029-30 | Tregaron Storm Overflow |
| DCWW101582a · f4da97f1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ty Hen Rhos PS | Due 2029-30 | Capel Silo Storm Overflow |
| DCWW101111a · 258f63a7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Ty Hen Rhos/Capel Silo SPS, Lon Helyg, Rhos, Llandysul, Dyfed SA44 5HD | Due 2029-30 | Capel Silo Storm Overflow |
| DCWW101956a · 185ccfe3 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Verwig WwTW | Due 2029-30 | Verwig WwTW Storm Overflow |
| DCWW101582a · 31b21973 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WILKES HEAD CSO LLANDYSUL CERED'N | Due 2029-30 | Northeast of Lewis Street Storm Overflow |
136 of 136 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.