← Bedford Bridge, Horrabridge

Spill evidence · River Hub

Bedford Bridge, Horrabridge

Combined sewer overflow · SBB00093 · feeds HORRABRIDGE STW
Wet weather

The discharge

Spill day
Wednesday, 15 April 2026
Started
15 Apr 2026, 10:04
Ended
15 Apr 2026, 10:42
Duration
38 minutes
Receiving water
Walkham
Parish
Horrabridge

Rainfall evidence

Daily rainfall at the matched gauge (Dousland) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
15/04/2026 (spill day)9.6 mmrain
14/04/20266.4 mmrain
13/04/20267.8 mmrain
12/04/20260 mmdry
11/04/20262 mmrain

River flow that day: 2.719 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00093). Rainfall: EA Hydrology gauge eb09e0d5-288f-438c-b817-d88461441f06. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Tavy Data.