← Bedford Bridge, Horrabridge

Spill evidence · River Hub

Bedford Bridge, Horrabridge

Combined sewer overflow · SBB00093 · feeds HORRABRIDGE STW
No rain data

The discharge

Spill day
Friday, 17 April 2020
Started
17 Apr 2020, 20:01
Ended
17 Apr 2020, 20:20
Duration
18 minutes 40 seconds
Receiving water
Walkham
Parish
Horrabridge

Rainfall evidence

Daily rainfall at the matched gauge (Dousland) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
17/04/2020 (spill day)no data
16/04/2020no data
15/04/2020no data
14/04/2020no data
13/04/2020no data

River flow that day: 2.272 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00093). Rainfall: EA Hydrology gauge eb09e0d5-288f-438c-b817-d88461441f06. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Tavy Data.
Spill evidence — Bedford Bridge, Horrabridge — River Tavy Data