A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

90
Measures in this catchment
WINEP, current record
80
Still active
not yet past their date
10
Assumed complete
completion date has passed
24
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08TW100495 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
ABBESS RODING SEWAGE TREATMENT WORKS
Complete 2025-26Upper Roding (to Cripsey Brook)
08TW100498 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BRENTWOOD SEWAGE TREATMENT WORKS
Complete 2025-26Ingrebourne
08TW100527 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BRICKENDEN STW
Complete 2025-26Ingrebourne
08TW100505 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
EPPING (FIDDLERS HAMLET) SEWAGE TREATMENT WORKS
Complete 2025-26Brookhouse Brook
08TW100511 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
LEADEN RODING SEWAGE TREATMENT WORKS
Complete 2025-26Upper Roding (to Cripsey Brook)
08TW100516 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
NORTH WEALD SEWAGE TREATMENT WORKS
Complete 2025-26Cripsey Brook
08TW100521 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
THEYDON BOIS SEWAGE TREATMENT WORKS
Complete 2025-26Brookhouse Brook
08TW100522 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
THORNWOOD COMMON SEWAGE TREATMENT WORKS
Complete 2025-26Cripsey Brook
08TW100523 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
WHITE RODING SEWAGE TREATMENT WORKS
Complete 2025-26Upper Roding (to Cripsey Brook)
08TW100526 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
WILLINGALE SEWAGE TREATMENT WORKS
Complete 2025-26Upper Roding (to Cripsey Brook)
08TW100412 · aU_MON4Monitoring
Install and run event-duration monitoring
ABBESS RODING SEWAGE TREATMENT WORKS
Due 2026-27Upper Roding (to Cripsey Brook)
08TW100297 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
BRENTWOOD SEWAGE TREATMENT WORKS
Due 2026-27Ingrebourne
08TW100298 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
BRICKENDEN STW
Due 2026-27Ingrebourne
08TW100431 · aU_MON4Monitoring
Install and run event-duration monitoring
EPPING (FIDDLERS HAMLET) SEWAGE TREATMENT WORKS
Due 2026-27Brookhouse Brook
08TW100355 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
LEADEN RODING SEWAGE TREATMENT WORKS
Due 2026-27Upper Roding (to Cripsey Brook)
08TW101558 · aU_MON4Monitoring
Install and run event-duration monitoring
NORTH WEALD SEWAGE TREATMENT WORKS
Due 2026-27Cripsey Brook
08TW100393 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
THEYDON BOIS SEWAGE TREATMENT WORKS
Due 2026-27Brookhouse Brook
08TW100394 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
THORNWOOD COMMON SEWAGE TREATMENT WORKS
Due 2026-27Cripsey Brook
08TW100402 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
WHITE RODING SEWAGE TREATMENT WORKS
Due 2026-27Upper Roding (to Cripsey Brook)
08TW100405 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
WILLINGALE SEWAGE TREATMENT WORKS
Due 2026-27Upper Roding (to Cripsey Brook)
08TW100143 · aWFD_NDLS_Chem2No deterioration
new PFOS limit
PFOS Epping STW
Due 2026-27Brookhouse Brook
08TW100114 · aWFD_NDLS_Chem2No deterioration
Brentwood STW, Nonylphenol, 0.45 ug
Reduce Nonylphenol loading
Due 2026-27Ingrebourne
08TW101545 · cWFD_INV_CHEMInvestigation
PFOS investigation - Fiddlers Hamlet (Epping) STW
4a Investigation to develop and trial a framework that meets statutory requirements
Due 2027-28Brookhouse Brook
08TW101108 · usEnvAct_INV4Investigation
Storm Overflows investigation
BANCROFT RUGBY GROUND- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · ufEnvAct_INV4Investigation
Storm Overflows investigation
BANCROFT RUGBY GROUND- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · uvEnvAct_INV4Investigation
Storm Overflows investigation
ELMCROFT AVENUE- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · uzEnvAct_INV4Investigation
Storm Overflows investigation
ELMCROFT AVENUE- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · uyEnvAct_INV4Investigation
Storm Overflows investigation
ELMCROFT AVENUE- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · uxEnvAct_INV4Investigation
Storm Overflows investigation
ELMCROFT AVENUE- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · uwEnvAct_INV4Investigation
Storm Overflows investigation
ELMCROFT AVENUE- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · uuEnvAct_INV4Investigation
Storm Overflows investigation
ELMCROFT AVENUE- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · utEnvAct_INV4Investigation
Storm Overflows investigation
ELMCROFT AVENUE- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · upEnvAct_INV4Investigation
Storm Overflows investigation
Empress Avenue - Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · vaEnvAct_INV4Investigation
Storm Overflows investigation
LONGBRIDGE ROAD- Storm Overflows investigation
Due 2027-28Mayes Brook
08TW101108 · ugEnvAct_INV4Investigation
Storm Overflows investigation
NEW STORM TANKS AT CASCADE ROAD- Storm Overflows investigation
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · ftEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at ABBESS RODING STW
Due 2027-28Upper Roding (to Cripsey Brook)
08TW101108 · dpEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at BROOK WAY, CHIGWELL CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · jkEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at CHIGWELL ROAD LANGSTON ROAD UNPERMITTED CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · dmEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at ELMCROFT AVENUE, WANSTEAD CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · ksEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at HIGH ROAD LOUGHTON UNPERMITTED CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · dnEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at HIGH ROAD, WOODFORD CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · dlEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at HILLSIDE AVENUE CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · hpEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at HULL GREEN (MATCHING) SPS
Due 2027-28Higher Laver Brook
08TW101108 · djEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at KINGS AVENUE CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · dhEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at LONGBRIDGE ROAD CSO
Due 2027-28Mayes Brook
08TW101108 · cbEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at Nags Head Lane (Brentwood) STW
Due 2027-28Ingrebourne
08TW101108 · cdEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at NORTH WEALD STW
Due 2027-28Cripsey Brook
08TW101108 · dcEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at NUTTER LANE PRESTON DRIVE, WANSTEAD CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · daEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at PRINCES AVENUE CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · czEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at Prospect road , woodford CSO (Monkhams Lane)
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · hxEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at Prospect road , woodford CSO (Oxford Road)
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · cyEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at RAY LODGE ROAD (RAY PARK) CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · dqEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at REDBRIDGE LANE WEST, WANSTEAD CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · fsEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at RIVERSIDE STW
Due 2027-28Ingrebourne
08TW101108 · iaEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at ROUS ROAD, BUCKHURST HILL CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · icEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at SNAKES LANE CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · cxEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at SOUTH PARK, ILFORD CSO
Due 2027-28Seven Kings Water
08TW101108 · cuEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at THE BROADWAY (RAY PARK 2) CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · cqEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at THEYDON BOIS STW
Due 2027-28Lower Roding (Cripsey Bk to Loughton)
08TW101108 · crEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at THORNWOOD STW
Due 2027-28Cripsey Brook
08TW101108 · gqEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at WEALDBRIDGE, NORTH WEALD SPS
Due 2027-28Cripsey Brook
08TW101108 · dbEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at WORCESTER CRESCENT CSO
Due 2027-28Lower Roding (Loughton to Thames)
08TW101108 · gtEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at WYNTERS BROOK, HASTINGWOOD SPS
Due 2027-28Cripsey Brook
08TW100188 · aWFD_INVInvestigation
Investigate the cause of the spills
WFD Investigation of in river Dissolved Oxygen to inform future action
Due 2027-28Ingrebourne
08TW101108 · tpEnvAct_INV4Investigation
Storm Overflows investigation
WILLINGALE WWTW- Storm Overflows investigation
Due 2027-28Upper Roding (to Cripsey Brook)
08TW100470 · aWFD_ND_CHEM3No deterioration
Brentwood STW nonylphenol no det permit limit
Reduce Nonylphenol loading
Due 2029-30Ingrebourne
08TW100967 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Abbess Roding STW
Reduce Phosphorus Loadings at Abbess Roding STW
Due 2029-30Upper Roding (to Cripsey Brook)
08TW101072 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: FFT Equivalent, 0.93Ha SUDS IA Removal, 20m3 screen
Storm Overflows action at ABBESS RODING STW
Due 2029-30Upper Roding (to Cripsey Brook)
08TW101060 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at BROOK WAY, CHIGWELL CSO
Due 2029-30Lower Roding (Loughton to Thames)
08TW101102 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at CHIGWELL ROAD, WOODFORD GREEN
Due 2029-30Lower Roding (Loughton to Thames)
08TW101100 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at CHIGWELL ROAD, WOODFORD GREEN
Due 2029-30Lower Roding (Loughton to Thames)
08TW101101 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at CHIGWELL ROAD, WOODFORD GREEN
Due 2029-30Lower Roding (Loughton to Thames)
08TW101103 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at CHIGWELL ROAD, WOODFORD GREEN
Due 2029-30Lower Roding (Loughton to Thames)
08TW101104 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at CHIGWELL ROAD, WOODFORD GREEN
Due 2029-30Lower Roding (Loughton to Thames)
08TW101107 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at CHIGWELL ROAD, WOODFORD GREEN
Due 2029-30Lower Roding (Loughton to Thames)
08TW101106 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at CHIGWELL ROAD, WOODFORD GREEN
Due 2029-30Lower Roding (Loughton to Thames)
08TW101105 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at CHIGWELL ROAD, WOODFORD GREEN
Due 2029-30Lower Roding (Loughton to Thames)
08TW101058 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at HIGH ROAD, WOODFORD CSO
Due 2029-30Lower Roding (Loughton to Thames)
08TW101057 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at LONGBRIDGE ROAD CSO
Due 2029-30Mayes Brook
11TW100190 · aEnvAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at NEW STORM TANKS AT CASCADE ROAD
Due 2029-30Lower Roding (Loughton to Thames)
10TW100031 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: 2,903m of sewer relining, 1.19Ha SUDS IA Removal, No screen required
Storm Overflows action at NORTH WEALD STW
Due 2029-30Cripsey Brook
08TW101053 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at Prospect road , woodford CSO (Monkhams Lane)
Due 2029-30Lower Roding (Loughton to Thames)
08TW101052 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at RAY LODGE ROAD (RAY PARK) CSO
Due 2029-30Lower Roding (Loughton to Thames)
08TW101061 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at REDBRIDGE LANE WEST, WANSTEAD CSO
Due 2029-30Lower Roding (Loughton to Thames)
09TW100081 · aEnvAct_IMP2Improvement
Storm Overflows improvements at SNAKES LANE CSO
Storm Overflows action at SNAKES LANE CSO
Due 2029-30Lower Roding (Loughton to Thames)
08TW101051 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at SOUTH PARK, ILFORD CSO
Due 2029-30Seven Kings Water
08TW101040 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: 1,011m of sewer relining, 103m3 storage, 0.41Ha SUDS IA Removal, No screen required
Storm Overflows action at THORNWOOD STW
Due 2029-30Cripsey Brook
08TW101086 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at WEALDBRIDGE, NORTH WEALD SPS
Due 2029-30Cripsey Brook
08TW101048 · aEnvAct_IMP2Improvement
Option C1: Solution in AMP 08: FFT Equivalent, 0.65Ha SUDS IA Removal, No screen required
Storm Overflows action at WILLINGALE STW
Due 2029-30Upper Roding (to Cripsey Brook)
08TW101054 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen
Storm Overflows action at WORCESTER CRESCENT CSO
Due 2029-30Lower Roding (Loughton to Thames)

90 of 90 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.