DonateLog in
River Hub
← Elmcroft Avenue (colvin Gardens) Tq40899103

Spill evidence · River Hub

Elmcroft Avenue (colvin Gardens) Tq40899103

Combined sewer overflow · TWL00793 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Sunday, 8 September 2024
Started
8 Sept 2024, 01:32
Ended
8 Sept 2024, 01:56
Duration
24 minutes
Receiving water
Lower Roding (Loughton to Thames)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Chalk Bridge Sluice) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/09/2024 (spill day)0 mmdry
07/09/20246.4 mmrain
06/09/20240 mmdry
05/09/20240 mmdry
04/09/20242 mmrain

River flow that day: 1.789 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
7 counted spills · 2 h total
Monitor uptime (2024)
95% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00793). Rainfall: EA Hydrology gauge 65f89cf9-1a2a-47f4-ab0a-f183294a2b30. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Rivers Roding, Beam and Ingrebourne Data.