← Ray Lodge Road Xx
Spill evidence · River Hub
Ray Lodge Road Xx
Combined sewer overflow · TWL00695 · feeds LONDON (Becton STW)
Dry spill
Evidence strength
Low confidence- ✓ Dry across a 3-day window
- ⚠ Short discharge (<1 h) — weaker signal
The discharge
- Spill day
- Sunday, 22 November 2026
- Started
- 22 Nov 2026, 21:00
- Ended
- 22 Nov 2026, 21:30
- Duration
- 30 minutes
- Receiving water
- Lower Roding (Loughton to Thames)
- Parish
- Chigwell
Rainfall evidence
Daily rainfall at the matched gauge (Chalk Bridge Sluice) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Dry spill3-day window: Dry spill4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 22/11/2026 (spill day) | 0 mm | dry |
| 21/11/2026 | 0.2 mm | dry |
| 20/11/2026 | 0 mm | dry |
| 19/11/2026 | 0 mm | dry |
| 18/11/2026 | 12.8 mm | rain |
River flow that day: 12.437 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 6.2 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00695). Rainfall: EA Hydrology gauge 65f89cf9-1a2a-47f4-ab0a-f183294a2b30. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Rivers Roding, Beam and Ingrebourne Data.