DonateLog in
River Hub
← Longbridge Road A

Spill evidence · River Hub

Longbridge Road A

Combined sewer overflow · TWL00278 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Monday, 14 October 2024
Started
14 Oct 2024, 08:00
Ended
14 Oct 2024, 09:00
Duration
1 hour
Receiving water
Mayes Brook
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Gascoigne Road) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
14/10/2024 (spill day)0.38 mmrain
13/10/202410.69 mmrain
12/10/20241.39 mmrain
11/10/20240 mmdry
10/10/20240.02 mmdry

River flow that day: 9.178 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
14 counted spills · 25 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00278). Rainfall: EA Hydrology gauge fff07329-3df5-45bc-915a-6e7274ece1f8. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Rivers Roding, Beam and Ingrebourne Data.