DonateLog in
River Hub
← Longbridge Road A

Spill evidence · River Hub

Longbridge Road A

Combined sewer overflow · TWL00278 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Tuesday, 22 July 2025
Started
22 Jul 2025, 18:45
Ended
22 Jul 2025, 19:45
Duration
1 hour
Receiving water
Mayes Brook
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Gascoigne Road) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
22/07/2025 (spill day)3.66 mmrain
21/07/20252.07 mmrain
20/07/20251.28 mmrain
19/07/20255.75 mmrain
18/07/20256.23 mmrain

River flow that day: 0.945 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
4 counted spills · 5 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00278). Rainfall: EA Hydrology gauge fff07329-3df5-45bc-915a-6e7274ece1f8. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Rivers Roding, Beam and Ingrebourne Data.
Spill evidence — Longbridge Road A — Rivers Roding, Beam and Ingrebourne Data