DonateLog in
River Hub
← Theydon Bois STW

Spill evidence · River Hub

Theydon Bois STW

Storm overflow at the works · TWL00413 · feeds THEYDON BOIS STW
Wet weather

The discharge

Spill day
Friday, 23 January 2026
Started
23 Jan 2026, 18:15
Ended
24 Jan 2026, 02:30
Duration
8 hours 15 minutes
Receiving water
Lower Roding (Cripsey Bk to Loughton)
Parish
Theydon Garnon

Rainfall evidence

Daily rainfall at the matched gauge (Epping Forest) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/01/2026 (spill day)0.6 mmrain
22/01/20261 mmrain
21/01/20267.8 mmrain
20/01/20265.4 mmrain
19/01/20260.2 mmdry

River flow that day: 39.015 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00413). Rainfall: EA Hydrology gauge a143fc2b-c1eb-4218-a8b1-f58342d58bdc. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Rivers Roding, Beam and Ingrebourne Data.
Spill evidence — Theydon Bois STW — Rivers Roding, Beam and Ingrebourne Data