What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW102714a · 25fad041 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ 136 TYNTYLA ROAD CSO, TONYPANDY | Due 2029-30 | Tyntyla Road Tonypandy Storm Overflow |
| DCWW101582a · 7a213478 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ 2 Clarence St CSO, Pentre | Due 2029-30 | Ynys Park Storm Overflow |
| DCWW101554a · 5704d6dd | W_FISH_IMP1 | Improvement | Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage. Fish 50086944 (Pont Rhondda Avenue Playing Fields) | Due 2029-30 | Water body only |
| DCWW101556a · b63dbad6 | W_FISH_IMP1 | Improvement | Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage. Fish 50160452 (Porth Bus Station) | Due 2029-30 | Water body only |
| DCWW101582a · baf10a32 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ A COMBINED SEWER OVERFLOW GYFEILLON | Due 2029-30 | Gyfeillon Gardens Storm Overflow |
| DCWW101582a · f60445ca | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ A CSO at Clydach Vale Davies Street | Due 2029-30 | Davies Street Tonypandy Storm Overflow |
| DCWW101582a · b3c6f0ca | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Aberrhondda Road CSO | Due 2029-30 | Aberrhondda Road Storm Overflow |
| DCWW102540a · 9a4af8a4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BLAEN-Y-CWM ROAD CSO BLAENCWM | Due 2029-30 | Blaen Y Cwm Road Blaencwm Overflow |
| DCWW101582a · 621c0395 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Blaen-y-Cwm Terrace CSO | Due 2029-30 | Blaen-Y-Cwm Terrace Storm Overflow |
| DCWW102303a · b38ad5f8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BLAENLLECHAU COMMERCIAL&GEORGE ST JNCT | Due 2029-30 | Commercial Street Blaenllechau Storm Overflow |
| DCWW101582a · 619c3595 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Blaenllechau Long Row CSO | Due 2029-30 | Long Row Blaenllechau Storm Overflow |
| DCWW101582a · 655389e6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Blaenllechau Taff St CSO | Due 2029-30 | Taff Street Rear Storm Overflow |
| DCWW101935a · 41bb60c9 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Blake Street (rear of) Maerdy | Due 2029-30 | Blake Street Storm Overflow |
| DCWW101442a · 32ba85a0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Colliery Street SPS, Trehafod, Pontypridd | Due 2029-30 | Water body only |
| DCWW101946a · a6506c89 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Crichton St CSO Treorchy | Due 2029-30 | Crichton Street Storm Overflow |
| DCWW101582a · 7f78cc61 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Crossbrook St CSO, Pontypridd | Due 2029-30 | Taff Street Pontypridd Storm Overflow |
| DCWW101582a · f67f404b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Blaenllechau School St | Due 2029-30 | Mountain Row Storm Overflow |
| DCWW101582a · 26955c68 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO AT CADWGAN TERRACE TREHAFOD | Due 2029-30 | Cadwgan Terrace Storm Overflow |
| DCWW101582a · 4acfdf2a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at CROSS STREET YNYSHIR R-C-T | Due 2029-30 | Cross Street Ynyshir Storm Overflow |
| DCWW101582a · e8ee6b50 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Ferndale btw Taff St & Station Rd | Due 2029-30 | Ferndale Banana Tip No. 1 Storm Overflow |
| DCWW101582a · 394b1d43 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at FURNACE ROAD PONTYGWAITH RCT | Due 2029-30 | Furnace Road Pontygwaith Storm Overflow |
| DCWW101582a · 59d4461f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Junct Ystrad/Church Road Ystrad | Due 2029-30 | Ystrad Road Church Road Junction Storm Overflow |
| DCWW101582a · aaba53e3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Rear of George Street, Treherbert | Due 2029-30 | Oak Street Treherbert Storm Overflow |
| DCWW101582a · 54e437a5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Tonypandy, Rear of De Winton St | Due 2029-30 | De Winton Street Rear Storm Overflow |
| DCWW101582a · d54431b7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Treherbert George Street | Due 2029-30 | George Street Treherbert Storm Overflow |
| DCWW101582a · 66d1140f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO O/S Welcome Inn, Tylacelyn Rd, Penygraig | Due 2029-30 | Tylacelyn Road Hughes Street Storm Overflow |
| DCWW101582a · 71e512ee | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO OPP 37 EDMONDES ST TYLORSTOWN | Due 2029-30 | Edmonedes Street Courts Storm Overflow |
| DCWW102525a · 9084a7c8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO to rear of 8 Griffin Park Pentre | Due 2029-30 | Water body only |
| DCWW102306a · 6563181a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CWMPARC RAILWAY TERRACE | Due 2029-30 | Railway Terrace Cwmparc Storm Overflow |
| DCWW101582a · 45a9df94 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cymmer Rd CSO, Porth | Due 2029-30 | Cymmer Road Porth Storm Overflow |
| DCWW102332a · 29b7ec5c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Dolgwilym River Bridge CSO | Due 2029-30 | Dolgwilym River Bridge Storm Overflow |
| DCWW101582a · a559e24b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ East Rd CSO Tylorstown | Due 2029-30 | East Road Tylorstown Storm Overflow |
| DCWW100839a · 8c273f2f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Eirw Rd SPS, Porth, Rhondda, CF39 9LT | Due 2029-30 | Water body only |
| DCWW101582a · abcb94cd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ELISABETH CLOSE CSO PENTRE RCT | Due 2029-30 | Lewis Street Pentre Storm Overflow |
| DCWW102277a · 56027d8d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ FERNDALE BANANA TIP ADDITIONAL TANK | Due 2029-30 | Station Road Ferndale Storm Overflow |
| DCWW101582a · b46d8cf8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ FERNDALE BANANA TIP CSO | Due 2029-30 | Ferndale Banana Tip No. 3 Storm Overflow |
| DCWW101582a · a7a0116b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ferndale Banana Tip CSO Additional | Due 2029-30 | Greenwood Park Storm Overflow |
| DCWW101582a · beb665d8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ferndale Banana Tip No.1 CSO | Due 2029-30 | Ferndale Banana Tip No. 1 Storm Overflow |
| DCWW101934a · 8f7fdccb | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Ferndale Highfield Industrial Estate | Due 2029-30 | Highfield Industrial Estate Storm Overflow |
| DCWW101582a · c288e284 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ferndale Road CSO Tylorstown RCT | Due 2029-30 | Ferndale Road Tylorstown Storm Overflow |
| DCWW100757a · d92fc672 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Gelli Crossing PS, Gelli, Pentre, RCT CF41 7UD | Due 2029-30 | Gelli Crossing Overflow |
| DCWW101928a · 5e1cc12b | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ GELLIGALED PARK TYNTYLA ROAD CSO YSTRAD | Due 2029-30 | Gelligaled Park Tyntyla Road Storm Overflow |
| DCWW101582a · 57e42ff9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ GLANNANT ST/DINAS ROAD CSO | Due 2029-30 | Vicarage Road Penycraig Storm Overflow |
| DCWW102705a · 116057b9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Herbert Street CSO, side of 24, Treorchy | Due 2029-30 | Herbert Street Storm Overflow |
| DCWW101582a · ee74b7a9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ James Terrace CSO | Due 2029-30 | James Terrace Storm Overflow |
| DCWW101582a · c8b9bbb3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Junction of Sunnyhill & Park Crescent CSO, Cwmparc | Due 2029-30 | Park Road Cwmparc Storm Overflow |
| DCWW101582a · fb8891d7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Lanelay Crescent CSO, Maesycoed | Due 2029-30 | Maesycoe Lanelay Crescent Storm Overflow |
| DCWW100843a · 1263552a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LEWIS ST HIGH LEVEL CSO & SPS, OFF ELISABETH CLOSE, PENTRE RHONDDA FAWR | Due 2029-30 | Lewis Street Pentre Storm Overflow |
| DCWW102700a · 0305c44b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LEWIS STREET CSO, PENTRE | Due 2029-30 | Lewis Street Pentre Storm Overflow |
| DCWW101582a · 9e0b1879 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llwynypia Rd CSO, Tonypandy | Due 2029-30 | Llwynypia Road Storm Overflow |
| DCWW100708a · 132b7db9 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLWYNYPIA SEWAGE PUMPING STATION | Due 2029-30 | Sherwood Street Llwynypia Storm Overflow |
| DCWW101582a · 227b3d70 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llwynypia SPS | Due 2029-30 | Sherwood Street Llwynypia Storm Overflow |
| DCWW102312a · 2ddc1a88 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MAERDY STATION ROAD | Due 2029-30 | Station Road Maerdy Storm Overflow |
| DCWW102364a · 94567786 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Old Brithweunydd Road CSO Tonypandy | Due 2029-30 | Old Brithweunydd Road Storm Overflow |
| DCWW101582a · 1e59d28e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pavia Courth CSO, Pontypridd | Due 2029-30 | Pavia Court Storm Overflow |
| DCWW101582a · a55a4b12 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pentre - Llewellyn Street CSO | Due 2029-30 | Llewellyn Street Pentre Storm Overflow |
| DCWW102302a · 77caf008 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PENYGRAIG TYLACELYN RD | Due 2029-30 | Tylacelyn Road Rugby Club Storm Overflow |
| DCWW102318a · d3f24e1b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPRIDD LOWER MILL STREET | Due 2029-30 | Mill Street Pontypridd Storm Overflow |
| DCWW102285a · ed1f85f7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPRIDD PWLLGWAUN SHEPPARD ST BOWNS G | Due 2029-30 | Sheppard Street Storm Overflow |
| DCWW102286a · 8d14aa41 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPRIDD WEST STREET | Due 2029-30 | Taff Street Pontypridd Storm Overflow |
| DCWW102672a · 3a36cbd8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPRIDD YNYSANGHARAD PARK | Due 2029-30 | Ynysangharad Park Bridge Storm Overflow |
| DCWW101582a · 39e2ee77 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pwllgwaun Rd CSO, pontypridd | Due 2029-30 | Pwllgwaun Road Storm Overflow |
| DCWW101582a · 0ae71584 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ R/O Tylorstown Primary School CSO, Tylorstown | Due 2029-30 | Park View Tylorstown Storm Overflow |
| DCWW101582a · 2f7fe787 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Railway Terrace CSO, Clydach Vale | Due 2029-30 | Railway Terrace Clydach Vale Storm Overflow |
| DCWW101582a · 7890ca2d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rear of Fir St CSO, Ferndale | Due 2029-30 | Fir Street Rear Ferndale Storm Overflow |
| DCWW100846a · f822d4bd | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ REAR OF RICHARDS TERRACE, FOUL SPS EO, OFF COLLIERS WAY, TONYPANDY, RHONDDA FAWR | Due 2029-30 | Ynyscrug Roundabout Storm Overflow |
| DCWW101914a · 437896ae | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Rear of William St CSO, Ystrad | Due 2029-30 | South of River Street Ystrad Rhondda Overflow |
| DCWW101582a · 59d87c05 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rees Street 71 CSO, Pentre | Due 2029-30 | Rees Street West Storm Overflow |
| DCWW100707a · 9f11b15b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ REES STREET PUMPING STATION, GELLI, RHONDDA FAWR | Due 2029-30 | Rees Street Gelli Storm Overflow |
| DCWW102271a · 4a24d608 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ REES STREET, GELLI | Due 2029-30 | Rees Street Gelli Storm Overflow |
| DCWW101582a · 7ae65df4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ REGENT ST CSO TREORCHY RHONDDA | Due 2029-30 | Hermon Street Treorchy Storm Overflow |
| DCWW100801a · 69f29d57 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SEWAGE PUMPING STATION AT THE REAR OF TAFF STREET, PONTYPRIDD | Due 2029-30 | Taff Street Pontypridd Storm Overflow |
| DCWW101582a · 6bd54d93 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Station Rd CSO, Dinas, Porth | Due 2029-30 | Pen Dinas Road Dinas Storm Overflow |
| DCWW101582a · 8479e377 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Station Rd CSO, Ferndale | Due 2029-30 | Ferndale Banana Tip Additional Tank Storm Overflow |
| DCWW101582a · bc27cf5d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Taff St CSO, Pontypridd | Due 2029-30 | Taff Street Pontypridd Storm Overflow |
| DCWW101582a · ec3f76e5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ton Pentre PS CSOTont Pentre RCT | Due 2029-30 | Ynys Park Storm Overflow |
| DCWW100841a · 41401d99 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TONPENTRE PUMPING STATION | Due 2029-30 | Ynys Park Storm Overflow |
| DCWW102305a · 9e6be951 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TREALAW YNYSCYNON ROAD | Due 2029-30 | Ynyscynon Road Storm Overflow |
| DCWW102704a · 64e4dbdd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TREHAFOD FC CSO | Due 2029-30 | Trehafod Storm Tank Storm Overflow |
| DCWW100847a · ec188aef | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TREHAFOD FOOTBALL GROUND SPS EO | Due 2029-30 | Trehafod Storm Tank Storm Overflow |
| DCWW102270a · 9197c697 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TREHERBERT BLAENCWM ROAD/TYDRAW TERRACE | Due 2029-30 | Treherbert Blaencwm Road Storm Overflow |
| DCWW101582a · f57219a2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Treherbert Bute/Corbett/David St Junction CSO | Due 2029-30 | Bute Street Treherbert Storm Overflow |
| DCWW102330a · 7663c1bc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TREHERBERT INDUSTRIAL ESTATE | Due 2029-30 | David Street Treherbert Storm Overflow |
| DCWW102688a · f37cfa15 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TREHERBERT OPP RAILWAY NR RHEIDOL CLOSE | Due 2029-30 | Rheidol Close Rail Bridge Storm Overflow |
| DCWW101582a · 1fc698f4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Treherbert Pumping Station, Park Close | Due 2029-30 | Treherbert Storm Overflow |
| DCWW100759a · 6e2987b8 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TREHERBERT PUMPING STATION, PARK CLOSE, TREHERBERT, RHONDDA | Due 2029-30 | Treherbert Storm Overflow |
| DCWW101582a · 285eb416 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TREORCHY CSO - M/H AT SIDE OF BOYS | Due 2029-30 | East of Dyfodwg Street Junction with Station Road Storm Overflow |
| DCWW100842a · 79df7af0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TREORCHY PUMPING STATION, RHONDDA FAWR | Due 2029-30 | Hermon Street Treorchy Storm Overflow |
| DCWW102687a · 09846911 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TYLORSTOWN PENRHYS ROAD/BRONDEG ST JNCT | Due 2029-30 | Ferndale Road Tylorstown Storm Overflow |
| DCWW101941a · 493adb61 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Tylorstown Pontygwaith Bridge | Due 2029-30 | Pontygwaith Bridge Storm Overflow |
| DCWW102272a · 1b99c9df | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WATTSTOWN BAILEY STREET LAND RECLAM SITE | Due 2029-30 | Wattstown Bailey Street Land reclam Site Storm Overflow |
| DCWW101582a · 249b6dc3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YNYSANGHARAD PARK CSO | Due 2029-30 | Ynysangharad Park Bridge Storm Overflow |
| DCWW102338a · d62b9a7d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YNYSCRUG RNDBT (TONYPANDY RICHARDS TERR) | Due 2029-30 | Ynyscrug Roundabout Storm Overflow |
| DCWW102304a · 340e72ae | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YSTRAD (RHONDDA) WILLIAM STREET REAR OF | Due 2029-30 | South of River Street Ystrad Rhondda Overflow |
94 of 94 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.