DonateLog in
River Hub
Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

23
Measures in this catchment
NEP, current record
16
Still active
not yet past their date
7
Assumed complete
completion date has passed
1
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100136a · 667a6ad2W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
Bow Street SPS
Complete 2025-26Bow Street Storm Overflow
DCWW100264a · d416d8ecW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANFAIR STW
Complete 2025-26Llanfarian WwTW Inlet Storm Overflow
DCWW100265a · f8e85eeaW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANFARIAN WWTW LLANFARIAN CERED'N
Complete 2025-26Llanfarian WwTW Inlet Storm Overflow
DCWW100087a · c10dbf77W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANILAR SPS
Complete 2025-26Llanilar on Clos Henri Storm Overflow
DCWW100336a · cffe2ddaW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PENTRE-LLYN SPS
Complete 2025-26Pentrellyn Storm Overflow
DCWW100377a · ff851eabW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TALLEY WWTW LLANDEILO CARMS
Complete 2025-26Aberystwyth Tan-Y-Cae Storm Overflow
DCWW100380a · 692d44baW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
Tan-Y-Cae SPS
Complete 2025-26Aberystwyth Tan-Y-Cae Storm Overflow
DCWW102125a · 4429dad9W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CLARACH BAY HOLIDAY VILLAGE PS
Due 2026-27Clarach Bay Overflow
DCWW100634a · 486759a1W_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
LLANFARIAN (ABERYSTWYTH)
Due 2027-28Llanfarian WwTW Inlet Storm Overflow
DCWW102573a · e0039636W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Aberystwyth - Trefechan Bridge
Due 2029-30Trefechan Bridge Storm Overflow
DCWW101582a · 6cccad97W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BOW STREET SPS BOW STREET
Due 2029-30Bow Street Storm Overflow
DCWW101083a · fdeb3c58W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Cae Ceredic SPS, Parc Avenue, Aberystwyth, SY23 3GG
Due 2029-30Fifth Avenue Storm Overflow
DCWW101582a · 47486216W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Clarach STW CSO
Due 2029-30Clarach WwTW Storm Overflow
DCWW101582a · a0121baaW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Min-y-Ddol Southgate, Aberystwyth, Penparcau, Ceredigion
Due 2029-30Min-Y-Ddol Storm Overflow
DCWW100975a · 04510ee0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANBADARN SPS
Due 2029-30Llanbadarn Fawr Storm Overflow
DCWW102377a · b42d5c2fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANFARIAN (ABERYSTWYTH) STW
Due 2029-30Llanfarian WwTW Inlet Storm Overflow
DCWW100952a · 643c3c83W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANFARIAN WASTEWATER TREATMENT WORKS SPS
Due 2029-30Llanfarian WwTW Inlet Storm Overflow
DCWW101582a · eba3e5b6W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llanilar CSO at SPS
Due 2029-30Llanilar on Clos Henri Storm Overflow
DCWW100934a · 0fb3d609W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANILAR SPS NO 2
Due 2029-30Llanilar on Clos Henri Storm Overflow
DCWW101582a · 290e517bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PENTRELLYN PS
Due 2029-30Pentrellyn Storm Overflow
DCWW100933a · 6397e21bW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PENTRELLYN SPS NO 1
Due 2029-30Pentrellyn Storm Overflow
DCWW101046a · 0d4b867fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PUMPING STATION, CLARACH BAY HOLIDAY VILLAGE, CLARACH BAY, ABERYSTWYTH, DYFED
Due 2029-30Clarach Bay Overflow
DCWW100970a · ffb12d37W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
TAN Y CAE SPS ABERYSTWYTH
Due 2029-30Aberystwyth Tan-Y-Cae Storm Overflow

23 of 23 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.