Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Gratton, YelvertonCSO SBB00514 | 2050 | 63 | 167 248 events | +165% | 16.7× | Rising | |
| Gratton STW, YelvertonSSO SBB00515 | 2050 | 33 | 143 718 events | +333% | 14.3× | Rising | |
| Plymouth Rd Opp Dingle Rd, PlymptonCSO SBB00946 | 2050 | 82 | 88 96 events | +7% | 8.8× | Rising | |
| Glenholt pumping station, PlymouthPS-CSO/EO SBB00493 | 2050 | 87 | 67 122 events | -23% | 6.7× | Falling — behind | |
| Lake Ln, DouslandCSO SBB00656 | 2050 | 28 ·24 | 46 77 events | +64% | 4.6× | Rising | |
| Market Road, PlymptonCSO SBB00747 | 2050 | 50 | 46 56 events | -8% | 4.6× | Falling — behind | |
| Meavy S T STW, DouslandSO SBB00757 | 2050 | 14 ·24 | 34 21 events | +143% | 3.4× | Rising | |
| Clearbrook STWSSO SBB00272 | 2050 | 2 ·24 | 26 23 events | +1200% | 2.6× | Rising | |
| Glenview, YelvertonCSO SBB00333 | 2050 | 30 ·24 | 26 26 events | -13% | 2.6× | Falling — behind | |
| Newnham Road, ColebrookCSO SBB00833 | 2050 | 64 | 22 16 events | -66% | 2.2× | Falling — behind | |
| Moorland Rd, PlymouthCSO SBB00801 | 2050 | 1 ·25 | 1 1 events | 0% | 0.1× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →