What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08WW100876 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) ASHILL MAIN WRC flow monitoring | Due 2026-27 | Fivehead River |
| 08WW100855 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) ASHILL MAIN WRC overflow monitoring | Due 2026-27 | Fivehead River |
| 08WW100649 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Broadway WRC Flow Monitoring | Due 2026-27 | Ding |
| 08WW100422 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Broadway WRC Overflow Monitoring | Due 2026-27 | Ding |
| 08WW100656 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Cannington WRC Flow Monitoring | Due 2026-27 | Cannington Bk - Lower |
| 08WW100430 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Cannington WRC Overflow Monitoring | Due 2026-27 | Cannington Bk - Lower |
| 08WW100657 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Castle Cary WRC Flow Monitoring | Due 2026-27 | Cary - source to conf with KSD |
| 08WW100431 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Castle Cary WRC Overflow Monitoring | Due 2026-27 | Cary - source to conf with KSD |
| 08WW100878 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) CHAFFCOMBE WRC flow monitoring | Due 2026-27 | Isle - Upper |
| 08WW100856 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) CHAFFCOMBE WRC overflow monitoring | Due 2026-27 | Isle - Upper |
| 08WW100658 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Chard WRC Flow Monitoring | Due 2026-27 | Isle - Upper |
| 08WW100432 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Chard WRC Overflow Monitoring | Due 2026-27 | Isle - Upper |
| 08WW100660 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Charlton Horethorne WRC Flow Monitoring | Due 2026-27 | Yeo |
| 08WW100434 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Charlton Horethorne WRC Overflow Monitoring | Due 2026-27 | Yeo |
| 08WW100666 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Chilthorne Domer WRC Flow Monitoring | Due 2026-27 | Bearley Brook |
| 08WW100440 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Chilthorne Domer WRC Overflow Monitoring | Due 2026-27 | Bearley Brook |
| 08WW100672 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Combe St Nicholas WRC Flow Monitoring | Due 2026-27 | Isle - Upper |
| 08WW100446 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Combe St Nicholas WRC Overflow Monitoring | Due 2026-27 | Isle - Upper |
| 08WW100677 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Corscombe WRC Flow Monitoring | Due 2026-27 | Sutton Bingham Stream - East Arm |
| 08WW100451 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Corscombe WRC Overflow Monitoring | Due 2026-27 | Sutton Bingham Stream - East Arm |
| 08WW100680 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Crewkerne East WRC Flow Monitoring | Due 2026-27 | Parrett - headwaters to Broad River |
| 08WW100454 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Crewkerne East WRC Overflow Monitoring | Due 2026-27 | Parrett - headwaters to Broad River |
| 08WW100688 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Donyatt WRC Flow Monitoring | Due 2026-27 | Isle - Upper to conf Cad Bk |
| 08WW100462 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Donyatt WRC Overflow Monitoring | Due 2026-27 | Isle - Upper to conf Cad Bk |
| 08WW100690 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Dowlish Wake WRC Flow Monitoring | Due 2026-27 | Dowlish Brook |
| 08WW100464 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Dowlish Wake WRC Overflow Monitoring | Due 2026-27 | Dowlish Brook |
| 08WW100694 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) East Chinnock WRC Flow Monitoring | Due 2026-27 | Chinnock BK |
| 08WW100468 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) East Chinnock WRC Overflow Monitoring | Due 2026-27 | Chinnock BK |
| 08WW100695 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) East Coker WRC Flow Monitoring | Due 2026-27 | Sutton Bingham Stream - conf Closworth Str to conf Yeo |
| 08WW100469 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) East Coker WRC Overflow Monitoring | Due 2026-27 | Sutton Bingham Stream - conf Closworth Str to conf Yeo |
| 08WW100702 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Fivehead WRC Flow Monitoring | Due 2026-27 | Isle - Cad Bk to Fivehead River |
| 08WW100476 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Fivehead WRC Overflow Monitoring | Due 2026-27 | Isle - Cad Bk to Fivehead River |
| 08WW100713 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Halstock WRC Flow Monitoring | Due 2026-27 | Sutton Bingham Stream - East Arm |
| 08WW100487 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Halstock WRC Overflow Monitoring | Due 2026-27 | Sutton Bingham Stream - East Arm |
| 08WW100714 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Hardington Mandeville WRC Flow Monitoring | Due 2026-27 | Chinnock BK |
| 08WW100488 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Hardington Mandeville WRC Overflow Monitoring | Due 2026-27 | Chinnock BK |
| 08WW100715 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Haselbury Plucknett WRC Flow Monitoring | Due 2026-27 | Broad |
| 08WW100489 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Haselbury Plucknett WRC Overflow Monitoring | Due 2026-27 | Broad |
| 08WW100716 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Hatch Beauchamp WRC Flow Monitoring | Due 2026-27 | Fivehead River |
| 08WW100490 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Hatch Beauchamp WRC Overflow Monitoring | Due 2026-27 | Fivehead River |
| 08WW100495 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Hornsey Bridge WRC - Marston Magna Church Lane SPS Overflow Monitoring | Due 2026-27 | Hornsey Brook |
| 08WW100723 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Hornsey Bridge WRC - Marston Magna SPS Flow Monitoring | Due 2026-27 | Hornsey Brook |
| 08WW100724 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Hornsey Bridge WRC - West Camel SPS Flow Monitoring | Due 2026-27 | Hornsey Brook |
| 08WW100496 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Hornsey Bridge WRC - West Camel SPS Overflow Monitoring | Due 2026-27 | Hornsey Brook |
| 08WW100725 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Hornsey Bridge WRC - Yeovilton SPS Flow Monitoring | Due 2026-27 | Hornsey Brook |
| 08WW100497 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Hornsey Bridge WRC - Yeovilton SPS Overflow Monitoring | Due 2026-27 | Hornsey Brook |
| 08WW100728 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Ilchester WRC Flow Monitoring | Due 2026-27 | Yeo Ds Over Compton |
| 08WW100500 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Ilchester WRC Overflow Monitoring | Due 2026-27 | Yeo Ds Over Compton |
| 08WW100729 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Ilminster WRC Flow Monitoring | Due 2026-27 | Isle - Upper to conf Cad Bk |
| 08WW100501 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Ilminster WRC Overflow Monitoring | Due 2026-27 | Isle - Upper to conf Cad Bk |
| 08WW100730 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Ilton WRC Flow Monitoring | Due 2026-27 | Isle - Cad Bk to Fivehead River |
| 08WW100502 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Ilton WRC Overflow Monitoring | Due 2026-27 | Isle - Cad Bk to Fivehead River |
| 08WW100739 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Longbridge WRC Flow Monitoring | Due 2026-27 | Lopen Brook |
| 08WW100511 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Longbridge WRC Overflow Monitoring | Due 2026-27 | Lopen Brook |
| 08WW100749 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Martock New WRC Flow Monitoring | Due 2026-27 | Wellhams Brook |
| 08WW100521 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Martock New WRC Overflow Monitoring | Due 2026-27 | Wellhams Brook |
| 08WW100754 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Merriott WRC Flow Monitoring | Due 2026-27 | Merriot Stream |
| 08WW100526 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Merriott WRC Overflow Monitoring | Due 2026-27 | Merriot Stream |
| 08WW100755 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Milborne Port WRC Flow Monitoring | Due 2026-27 | Yeo |
| 08WW100527 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Milborne Port WRC Overflow Monitoring | Due 2026-27 | Yeo |
| 08WW100759 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Nether Stowey WRC Flow Monitoring | Due 2026-27 | Fiddington Brook |
| 08WW100531 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Nether Stowey WRC Overflow Monitoring | Due 2026-27 | Fiddington Brook |
| 08WW100760 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) North Cadbury WRC Flow Monitoring | Due 2026-27 | Cam - Upper |
| 08WW100532 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) North Cadbury WRC Overflow Monitoring | Due 2026-27 | Cam - Upper |
| 08WW100762 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) North Petherton WRC Flow Monitoring | Due 2026-27 | Petherton Stream |
| 08WW100534 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) North Petherton WRC Overflow Monitoring | Due 2026-27 | Petherton Stream |
| 08WW100897 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) OVER STRATTON WRC flow monitoring | Due 2026-27 | Lopen Brook |
| 08WW100896 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) OVER STRATTON WRC overflow monitoring | Due 2026-27 | Lopen Brook |
| 08WW100890 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) POYNTINGTON WRC flow monitoring | Due 2026-27 | Yeo |
| 08WW100868 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) POYNTINGTON WRC overflow monitoring | Due 2026-27 | Yeo |
| 08WW100010 · a | WFD_INV_WRHMWB | Investigation | Establish the effect of Reservoir on the transport of sediment downstream. Reservoir Sediment Investigation | Due 2026-27 | Cannington Bk - Upper |
| 08WW100892 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) SANDFORD ORCAS WRC flow monitoring | Due 2026-27 | Corton Denham Stream |
| 08WW100870 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) SANDFORD ORCAS WRC overflow monitoring | Due 2026-27 | Corton Denham Stream |
| 08WW100789 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Sherborne WRC Flow Monitoring | Due 2026-27 | Yeo |
| 08WW100562 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Sherborne WRC Overflow Monitoring | Due 2026-27 | Yeo |
| 08WW100795 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Somerton WRC Flow Monitoring | Due 2026-27 | Cary - source to conf with KSD |
| 08WW100568 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Somerton WRC Overflow Monitoring | Due 2026-27 | Cary - source to conf with KSD |
| 08WW100796 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) South Perrott WRC Flow Monitoring | Due 2026-27 | Parrett - headwaters to Broad River |
| 08WW100569 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) South Perrott WRC Overflow Monitoring | Due 2026-27 | Parrett - headwaters to Broad River |
| 08WW100797 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) South Petherton WRC Flow Monitoring | Due 2026-27 | Lam Brook |
| 08WW100570 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) South Petherton WRC Overflow Monitoring | Due 2026-27 | Lam Brook |
| 08WW100799 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Sparkford WRC Flow Monitoring | Due 2026-27 | Cam - Lower |
| 08WW100572 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Sparkford WRC Overflow Monitoring | Due 2026-27 | Cam - Lower |
| 08WW100801 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Stogursey WRC Flow Monitoring | Due 2026-27 | Stogursey BK |
| 08WW100574 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Stogursey WRC Overflow Monitoring | Due 2026-27 | Stogursey BK |
| 08WW100815 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Tintinhull Ash WRC Flow Monitoring | Due 2026-27 | Yeo Ds Over Compton |
| 08WW100589 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Tintinhull Ash WRC Overflow Monitoring | Due 2026-27 | Yeo Ds Over Compton |
| 08WW100850 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Yeovil Pen Mill WRC Flow Monitoring | Due 2026-27 | Yeo Us Over Compton |
| 08WW100625 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Yeovil Pen Mill WRC Overflow Monitoring | Due 2026-27 | Yeo Us Over Compton |
| 08WW100851 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Yeovil Without WRC Flow Monitoring | Due 2026-27 | Bearley Brook |
| 08WW100626 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Yeovil Without WRC Overflow Monitoring | Due 2026-27 | Bearley Brook |
| 08WW100220 · a | WFD_NDLS_Chem2 | No deterioration | Improvements to WRC to achieve new chemical permit. Castle Cary WRC - Chemical Improvements | Due 2026-27 | Cary - source to conf with KSD |
| 08WW100241 · a | WFD_NDLS_Chem1 | No deterioration | Improvements to WRC to achieve new chemical permit. Crewkerne East WRC - Chemical Improvements | Due 2026-27 | Parrett - headwaters to Broad River |
| 08WW100242 · a | WFD_NDLS_Chem1 | No deterioration | Improvements to WRC to achieve new chemical permit. Merriott WRC - Chemical Improvements | Due 2026-27 | Merriot Stream |
| 08WW100243 · a | WFD_NDLS_Chem1 | No deterioration | Improvements to WRC to achieve new chemical permit. Somerton WRC - Chemical Improvements | Due 2026-27 | Cary - source to conf with KSD |
| 08WW100227 · a | WFD_NDLS_Chem2 | No deterioration | Improvements to WRC to achieve new chemical permit. Sparkford WRC - Chemical Improvements | Due 2026-27 | Cam - Lower |
| 08WW101000 · ga | EnvAct_INV4 | Investigation | Storm overflows - Investigations ***A-WINEP*** BROADWAY WATSTEWATER TREATMENT WORK SO Investigation (13037S) | Due 2027-28 | Ding |
| 08WW101000 · gb | EnvAct_INV4 | Investigation | Storm overflows - Investigations ***A-WINEP*** HASELBURY PLUCKNETT WRC SO Investigation (13144S) | Due 2027-28 | Broad |
| 08WW101000 · mi | EnvAct_INV4 | Investigation | Storm overflows - Investigations BACK STREET CSO | Due 2027-28 | King's Sedgemoor Drain - Henley Sluice to mouth |
| 08WW101000 · ic | EnvAct_INV4 | Investigation | Storm overflows - Investigations BENNETTS ORCHARD PUMPING STATION SO Investigation (15278B) | Due 2027-28 | King's Sedgemoor Drain - Henley Sluice to mouth |
| 08WW101000 · dw | EnvAct_INV4 | Investigation | Storm overflows - Investigations BREWERY LANE CSO SO Investigation (16673C) | Due 2027-28 | Isle - Upper to conf Cad Bk |
| 08WW101000 · dt | EnvAct_INV4 | Investigation | Storm overflows - Investigations DONYATT WATER RECYCLING CENTRE SO Investigation (13095S) | Due 2027-28 | DONYATT |
| 08WW101000 · rk | EnvAct_INV4 | Investigation | Storm overflows - Investigations DONYATT, . (Site ID 14294B) | Due 2027-28 | Isle - Upper to conf Cad Bk |
| 08WW101000 · nq | EnvAct_INV4 | Investigation | Storm overflows - Investigations FARM PS | Due 2027-28 | Cary - source to conf with KSD |
| 08WW101000 · ms | EnvAct_INV4 | Investigation | Storm overflows - Investigations FIVEHEAD WASTEWATER TREATMENT WORKS | Due 2027-28 | Isle - Cad Bk to Fivehead River |
| 08WW101000 · mt | EnvAct_INV4 | Investigation | Storm overflows - Investigations FROG LANE PUMPING STATION | Due 2027-28 | Cam - Lower |
| 08WW101000 · by | EnvAct_INV4 | Investigation | Storm overflows - Investigations HALSTOCK WATER RECYCLING CENTRE SO Investigation (13140S) | Due 2027-28 | Sutton Bingham Stream - East Arm |
| 08WW101000 · mx | EnvAct_INV4 | Investigation | Storm overflows - Investigations HARDINGTON MANDEVILLE WRC | Due 2027-28 | Chinnock BK |
| 08WW101000 · bx | EnvAct_INV4 | Investigation | Storm overflows - Investigations HATCH BEAUCHAMP WRC SO Investigation (13145C) | Due 2027-28 | Fivehead River |
| 08WW101000 · kn | EnvAct_INV4 | Investigation | Storm overflows - Investigations ILCHESTER WATER RECYCLING CENTRE SO Investigation (13160S) | Due 2027-28 | Yeo Ds Over Compton |
| 08WW101000 · dy | EnvAct_INV4 | Investigation | Storm overflows - Investigations ILMINSTER WWTW SO Investigation (13161S) | Due 2027-28 | Isle - Upper to conf Cad Bk |
| 08WW101000 · rf | EnvAct_INV4 | Investigation | Storm overflows - Investigations ILMINSTER, LORD NELSON (Site ID 15327B) | Due 2027-28 | Isle - Upper to conf Cad Bk |
| 08WW101000 · na | EnvAct_INV4 | Investigation | Storm overflows - Investigations ILTON WATER RECYCLING CENTRE | Due 2027-28 | Isle - Cad Bk to Fivehead River |
| 08WW101000 · fl | EnvAct_INV4 | Investigation | Storm overflows - Investigations KINGSBURY EPISCOPI PUMPING STATION SO Investigation (19035B) | Due 2027-28 | Westmoor Main Drain |
| 08WW101000 · nc | EnvAct_INV4 | Investigation | Storm overflows - Investigations KINGSDON PUMPING STATION | Due 2027-28 | Cary - source to conf with KSD |
| 08WW101000 · bt | EnvAct_INV4 | Investigation | Storm overflows - Investigations MARTOCK WASTEWATER TREATMENT WORKS SO Investigation (13201S) | Due 2027-28 | Wellhams Brook |
| 08WW101000 · nj | EnvAct_INV4 | Investigation | Storm overflows - Investigations MERRIOTT WASTEWATER TREATMENT WORKS | Due 2027-28 | Merriot Stream |
| 08WW100216 · d | WFD_INV_N-Tal | Investigation | Investigations to assess treatment options for nitrogen - Milborne Port WRC Technology Trial (Microvi) Nitrogen TAL Investigations - Milborne Port WRC Technology Trial | Due 2027-28 | Yeo |
| 08WW101000 · bs | EnvAct_INV4 | Investigation | Storm overflows - Investigations NORTH CADBURY WATER RECYCLING CENTR SO Investigation (13221S) | Due 2027-28 | Cam - Upper |
| 08WW101000 · nn | EnvAct_INV4 | Investigation | Storm overflows - Investigations PIBSBURY PUMPING STATION | Due 2027-28 | King's Sedgemoor Drain - Henley Sluice to mouth |
| 08WW101000 · np | EnvAct_INV4 | Investigation | Storm overflows - Investigations POYNTINGTON WATER RECYLCING CENTRE | Due 2027-28 | Yeo |
| 08WW101000 · ka | EnvAct_INV4 | Investigation | Storm overflows - Investigations SHERBORNE WWTW SO Investigation (13268C) | Due 2027-28 | Yeo |
| 08WW101000 · ku | EnvAct_INV4 | Investigation | Storm overflows - Investigations SHERBORNE WWTW SO Investigation (13268S) | Due 2027-28 | Yeo |
| 08WW101000 · nt | EnvAct_INV4 | Investigation | Storm overflows - Investigations SOMERTON STW | Due 2027-28 | Cary - source to conf with KSD |
| 08WW100021 · a | WFD_INV | Investigation | Investigation to determine the causes on low dissolved oxygen downstream of Somerton WRC Somerton WRC dissolved oxygen investigation | Due 2027-28 | Cary - source to conf with KSD |
| 08WW101000 · bq | EnvAct_INV4 | Investigation | Storm overflows - Investigations SOUTH PERROTT WWTW SO Investigation (13280S) | Due 2027-28 | Parrett - headwaters to Broad River |
| 08WW101000 · br | EnvAct_INV4 | Investigation | Storm overflows - Investigations SPARKFORD WRC SO Investigation (13282B) | Due 2027-28 | Cam - Lower |
| 08WW101000 · of | EnvAct_INV4 | Investigation | Storm overflows - Investigations STATION ROAD CSO | Due 2027-28 | Isle - Upper to conf Cad Bk |
| 08WW101000 · kf | EnvAct_INV4 | Investigation | Storm overflows - Investigations YEOVIL (PEN MILL) WWTW SO Investigation (13366S) | Due 2027-28 | Yeo Us Over Compton |
| 08WW101002 · ci | EnvAct_IMP4 | Improvement | EnvAct_IMP4ci. Storm overflows - Frequency improvements BREWERY LANE CSO SO improvement (16673C) | Due 2029-30 | Isle - Upper to conf Cad Bk |
| 08WW100051 · a | WFD_IMP_WRFlow | Improvement | Implement outcome of previous investigation - site flow adaptations to improve hydrological connectivity. To be confirmed through AMP8 investigation but may include moving location of Reservoir compensation flow. Cannington Brook flow adaptations (site flow adaptations) | Due 2029-30 | Cannington Bk - Upper |
| 08WW103151 · a | WFD_IMPg | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Cannington WRC - Phosphorus removal | Due 2029-30 | Cannington Bk - Lower |
| 08WW102078 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Castle Cary WRC - Phosphorus Removal | Due 2029-30 | Cary - source to conf with KSD |
| 08WW102079 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Chard WRC - Phosphorus Removal | Due 2029-30 | Isle - Upper |
| 08WW103028 · a | WFD_IMPg | Improvement | Improvements to WRC to achieve new phosphorus permit. Combe St Nicholas WRC - Phosphorus Removal | Due 2029-30 | Isle - Upper |
| 08WW100240 · a | WFD_ND_CHEM3 | No deterioration | Improvements to WRC to achieve new chemical permit. Crewkerne East WRC - Chemical Improvements | Due 2029-30 | Parrett - headwaters to Broad River |
| 08WW100221 · a | WFD_IMP_CHEM | Improvement | Improvements to WRC to achieve new chemical permit. Crewkerne East WRC - Chemical Improvements | Due 2029-30 | Parrett - headwaters to Broad River |
| 08WW102080 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Crewkerne East WRC - Phosphorus Removal | Due 2029-30 | Parrett - headwaters to Broad River |
| 08WW100060 · a | EE_IMP | Improvement | Address barriers to the passage of eels (for example building and maintaining eel passes). Currypool Weir eel passage improvements | Due 2029-30 | Currypool Stream |
| 08WW101002 · cf | EnvAct_IMP4 | Improvement | EnvAct_IMP4cf. Storm overflows - Frequency improvements DONYATT WATER RECYCLING CENTRE SO improvement (13095S) | Due 2029-30 | DONYATT |
| 08WW102081 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve new phosphorus permit. East Coker WRC - Phosphorus Removal | Due 2029-30 | Sutton Bingham Stream - conf Closworth Str to conf Yeo |
| 08WW103030 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. Fivehead WRC - Phosphorus Removal | Due 2029-30 | Isle - Cad Bk to Fivehead River |
| 08WW100253 · a | WFD_ND | No deterioration | Improvements to WRC to achieve tightened sanitary permit. Haselbury Plucknett WRC - Permit Change | Due 2029-30 | Broad |
| 08WW103032 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. Haselbury Plucknett WRC - Phosphorus Removal | Due 2029-30 | Broad |
| 08WW102082 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. Hornsey Bridge WRC - Phosphorus Removal | Due 2029-30 | Hornsey Brook |
| 08WW102083 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Ilchester WRC - Phosphorus Removal | Due 2029-30 | Yeo Ds Over Compton |
| 08WW102084 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Ilminster WRC - Phosphorus Removal | Due 2029-30 | Isle - Upper to conf Cad Bk |
| 08WW101002 · ck | EnvAct_IMP4 | Improvement | EnvAct_IMP4ck. Storm overflows - Frequency improvements ILMINSTER WWTW SO improvement (13161S) | Due 2029-30 | Isle - Upper to conf Cad Bk |
| 08WW102086 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Langport WRC - Phosphorus Removal | Due 2029-30 | Parrett - R Yeo to West Sedgemoor Drain |
| 08WW101002 · wi | EnvAct_IMP4 | Improvement | Storm overflows - Wetland treatment solution. LONG SUTTON, BENNETTS ORCHARD (Site ID 15278B) | Due 2029-30 | King's Sedgemoor Drain - Henley Sluice to mouth |
| 08WW103033 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. Longbridge WRC - Phosphorus Removal | Due 2029-30 | Lopen Brook |
| 08WW102087 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Martock WRC - Phosphorus Removal | Due 2029-30 | Parrett - Lopen Bk to R Isle |
| 08WW100223 · a | WFD_IMP_CHEM | Improvement | Improvements to WRC to achieve new chemical permit. Merriott WRC - Chemical Improvements | Due 2029-30 | Merriot Stream |
| 08WW102088 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Merriott WRC - Phosphorus Removal | Due 2029-30 | Merriot Stream |
| 08WW102089 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Milborne Port WRC - Phosphorus Removal | Due 2029-30 | Yeo |
| 08WW100255 · a | WFD_ND | No deterioration | Improvements to WRC to achieve tightened sanitary permit. North Petherton WRC - Permit Change | Due 2029-30 | Petherton Stream |
| 08WW102091 · a | WFD_IMP_MOD | Improvement | Improvements to WRC to achieve new phosphorus permit. North Petherton WRC - Phosphorus Removal | Due 2029-30 | Petherton Stream |
| 08WW100011 · a | WFD_IMP_WRHMWB | Improvement | To maintain and extend the gravel introduction downstream of Reservoir. Reservoir Sediment introduction | Due 2029-30 | Sutton Bingham Stream - upstream conf Closworth Str |
| 08WW102092 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Sherborne WRC - Phosphorus Removal | Due 2029-30 | Yeo |
| 08WW100226 · a | WFD_IMP_CHEM | Improvement | Improvements to WRC to achieve new chemical permit. Somerton WRC - Chemical Improvements | Due 2029-30 | Cary - source to conf with KSD |
| 08WW102093 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Somerton WRC - Phosphorus Removal | Due 2029-30 | Cary - source to conf with KSD |
| 08WW100258 · a | WFD_ND | No deterioration | Improvements to WRC to achieve tightened sanitary permit. South Perrot WRC - Permit Change | Due 2029-30 | Parrett - headwaters to Broad River |
| 08WW103034 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. South Perrott WRC - Phosphorus Removal | Due 2029-30 | Parrett - headwaters to Broad River |
| 08WW100259 · a | WFD_ND | No deterioration | Improvements to WRC to achieve tightened sanitary permit. South Petherton WRC - Permit Change | Due 2029-30 | Lam Brook |
| 08WW102094 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. South Petherton WRC - Phosphorus Removal | Due 2029-30 | Lam Brook |
| 08WW100260 · a | WFD_ND | No deterioration | Improvements to WRC to achieve tightened sanitary permit. Sparkford WRC - Permit Change | Due 2029-30 | Cam - Lower |
| 08WW102097 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Thornford WRC - Phosphorus Removal | Due 2029-30 | Wriggle |
| 08WW103035 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. Tintinhull Ash WRC - Phosphorus Removal | Due 2029-30 | Yeo Ds Over Compton |
| 08WW103036 · a | HD_IMP | Improvement | Improvements to WRC (or alternative option) to achieve new phosphorus permit. Trent WRC - Phosphorus Removal | Due 2029-30 | Yeo Ds Over Compton |
| 08WW102101 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Yeovil WRC - Phosphorus Removal | Due 2029-30 | Yeo Us Over Compton |
| 08WW102225 · a | U_IMP1 | Improvement | Monitoring at Yeovil Without WRC - The site discharges to a non-sensitive area and is forecast to exceed 2,000pe by 2030, thus requiring monitoring under the UWWTR. Yeovil Without WRC - UWWTR Monitoring | Due 2030-31 | Bearley Brook |
171 of 171 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.