← Yeovil Without Off Stone Lane Inlet

Spill evidence · River Hub

Yeovil Without Off Stone Lane Inlet

Storm overflow at the works · WXW01294 · feeds YEOVIL WITHOUT STW CATCHMENT
Wet weather

The discharge

Spill day
Saturday, 24 August 2024
Started
24 Aug 2024, 08:49
Ended
24 Aug 2024, 10:27
Duration
1 hour 38 minutes
Receiving water
Bearley Brook
Parish
Mudford

Rainfall evidence

Daily rainfall at the matched gauge (Sutton Bingham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/08/2024 (spill day)1.2 mmrain
23/08/202422.8 mmrain
22/08/20243.4 mmrain
21/08/20240.2 mmdry
20/08/20240.2 mmdry

River flow that day: 1.199 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
68 counted spills · 301 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01294). Rainfall: EA Hydrology gauge d5b6b189-faf9-4f9e-8809-1c4936aeecda. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.