← Yeovil Without Off Stone Lane Inlet

Spill evidence · River Hub

Yeovil Without Off Stone Lane Inlet

Storm overflow at the works · WXW01294 · feeds YEOVIL WITHOUT STW CATCHMENT
Wet weather

The discharge

Spill day
Sunday, 17 May 2026
Started
17 May 2026, 15:41
Ended
17 May 2026, 16:03
Duration
22 minutes
Receiving water
Bearley Brook
Parish
Mudford

Rainfall evidence

Daily rainfall at the matched gauge (Sutton Bingham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
17/05/2026 (spill day)8.108 mmrain
16/05/20263.713 mmrain
15/05/20260 mmdry
14/05/20264.121 mmrain
13/05/20260.376 mmrain

River flow that day: 1.223 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01294). Rainfall: EA Hydrology gauge d5b6b189-faf9-4f9e-8809-1c4936aeecda. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.
Spill evidence — Yeovil Without Off Stone Lane Inlet — River Parrett Data