← Stoford Hillside Main

Spill evidence · River Hub

Stoford Hillside Main

Combined sewer overflow · WXW01064 · feeds YEOVIL STW
Wet weather

The discharge

Spill day
Friday, 29 March 2024
Started
29 Mar 2024, 06:07
Ended
29 Mar 2024, 06:28
Duration
21 minutes
Receiving water
Sutton Bingham Stream - conf Closworth Str to conf Yeo
Parish
Barwick and Stoford

Rainfall evidence

Daily rainfall at the matched gauge (Sutton Bingham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
29/03/2024 (spill day)2.4 mmrain
28/03/202423.2 mmrain
27/03/202425.4 mmrain
26/03/20244 mmrain
25/03/20240 mmdry

River flow that day: 20.691 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
27 counted spills · 197 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01064). Rainfall: EA Hydrology gauge d5b6b189-faf9-4f9e-8809-1c4936aeecda. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.
Spill evidence — Stoford Hillside Main — River Parrett Data