← Wsx10148

Spill evidence · River Hub

Wsx10148

Storm overflow · WSX10148 · feeds BRIDGWATER STW
Wet weather

The discharge

Spill day
Monday, 22 June 2026
Started
22 Jun 2026, 16:26
Ended
22 Jun 2026, 18:30
Duration
2 hours 4 minutes
Receiving water
King's Sedgemoor Drain - Henley Sluice to mouth
Parish
Moorlinch

Rainfall evidence

Daily rainfall at the matched gauge (Gold Corner) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
22/06/2026 (spill day)21.43 mmrain
21/06/20260 mmdry
20/06/20260.26 mmrain
19/06/20260.85 mmrain
18/06/20260 mmdry

River flow that day: 0.855 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not a bathing-water overflow
Shellfish water
Not a shellfish-water overflow
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WSX10148). Rainfall: EA Hydrology gauge 40e8abd2-f395-42c8-95b1-b22c3348b0b5_405278. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.