← Pitney

Spill evidence · River Hub

Pitney

Pumping station overflow · WXW00861 · feeds LANGPORT STW
Wet weather

The discharge

Spill day
Monday, 16 February 2026
Started
16 Feb 2026, 03:15
Ended
16 Feb 2026, 05:22
Duration
2 hours 7 minutes
Receiving water
King's Sedgemoor Drain - Henley Sluice to mouth
Parish
Pitney

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
16/02/2026 (spill day)0 mmdry
15/02/20268.174 mmrain
14/02/20263.988 mmrain
13/02/202612.959 mmrain
12/02/20260.214 mmdry

River flow that day: 15.836 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00861). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.