← Limington Main

Spill evidence · River Hub

Limington Main

Pumping station overflow · WXW00630 · feeds HORNSEY BRIDGE STW CATCHMENT
Wet weather

The discharge

Spill day
Thursday, 5 September 2024
Started
5 Sept 2024, 13:35
Ended
5 Sept 2024, 16:02
Duration
2 hours 27 minutes
Receiving water
Bearley Brook
Parish
Yeovilton and District

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
05/09/2024 (spill day)27.057 mmrain
04/09/20244.103 mmrain
03/09/20240 mmdry
02/09/20242.675 mmrain
01/09/20245.251 mmrain

River flow that day: 3.75 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 9.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
70 counted spills · 1012 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00630). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.