← Drayton Ducks Lane

Spill evidence · River Hub

Drayton Ducks Lane

Pumping station overflow · WXW00383 · feeds LANGPORT STW
Wet weather

The discharge

Spill day
Sunday, 20 October 2024
Started
20 Oct 2024, 18:46
Ended
21 Oct 2024, 01:22
Duration
6 hours 36 minutes
Receiving water
Parrett - R Yeo to West Sedgemoor Drain
Parish
Drayton

Rainfall evidence

Daily rainfall at the matched gauge (West Sedgemoor) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
20/10/2024 (spill day)1.153 mmrain
19/10/20242.638 mmrain
18/10/202421.065 mmrain
17/10/20240.082 mmdry
16/10/202412.968 mmrain

River flow that day: 14.713 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
15 counted spills · 167 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00383). Rainfall: EA Hydrology gauge a92acb90-1626-40c3-865f-bd24386626e3. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.