← Leigh Frampton Farm

Spill evidence · River Hub

Leigh Frampton Farm

Pumping station overflow · WXW00446 · feeds THORNFORD STW
Wet weather

The discharge

Spill day
Wednesday, 16 October 2024
Started
16 Oct 2024, 20:25
Ended
16 Oct 2024, 21:34
Duration
1 hour 9 minutes
Receiving water
Wriggle River
Parish
Leigh

Rainfall evidence

Daily rainfall at the matched gauge (Telegraph Hill Dorset) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
16/10/2024 (spill day)12.94 mmrain
15/10/202417.82 mmrain
14/10/20240.33 mmrain
13/10/202415.82 mmrain
12/10/20240.2 mmdry

River flow that day: 26.784 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
46 counted spills · 170 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00446). Rainfall: EA Hydrology gauge b9f17463-72e1-4161-82cf-a074657b374e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.