← Yeovil Unit 4 Yeo Leisure Park
Spill evidence · River Hub
Yeovil Unit 4 Yeo Leisure Park
Combined sewer overflow · WXW01167 · feeds YEOVIL STW
Wet weather
The discharge
- Spill day
- Sunday, 29 September 2024
- Started
- 29 Sept 2024, 23:40
- Ended
- 30 Sept 2024, 00:54
- Duration
- 1 hour 14 minutes
- Receiving water
- Dodham Brook (Yeo (Somset))
- Parish
- Yeovil
Rainfall evidence
Daily rainfall at the matched gauge (Sutton Bingham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 29/09/2024 (spill day) | 42 mm | rain |
| 28/09/2024 | 0 mm | dry |
| 27/09/2024 | 0 mm | dry |
| 26/09/2024 | 17.2 mm | rain |
| 25/09/2024 | 25.8 mm | rain |
River flow that day: 13.977 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 4.4 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
- EA annual return (2024)
- 7 counted spills · 7 h total
- Monitor uptime (2024)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01167). Rainfall: EA Hydrology gauge d5b6b189-faf9-4f9e-8809-1c4936aeecda. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.