← Combwich Quay Road

Spill evidence · River Hub

Combwich Quay Road

Storm overflow · WXW00315 · feeds CANNINGTON STW
Wet weather

The discharge

Spill day
Monday, 25 November 2024
Started
25 Nov 2024, 14:51
Ended
25 Nov 2024, 15:44
Duration
53 minutes
Receiving water
Fiddington Brook
Parish
Otterhampton

Rainfall evidence

Daily rainfall at the matched gauge (Rivers House) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/11/2024 (spill day)0.114 mmdry
24/11/202417.515 mmrain
23/11/202428.897 mmrain
22/11/20244.27 mmrain
21/11/20240.059 mmdry

River flow that day: 25.224 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
56 counted spills · 505 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00315). Rainfall: EA Hydrology gauge ea1c4478-b21e-432b-b7e5-6d3122789732. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.
Spill evidence — Combwich Quay Road — River Parrett Data