← Othery Rye Lane/ Summerhedge Road
Spill evidence · River Hub
Othery Rye Lane/ Summerhedge Road
Pumping station overflow · WXW01086 · feeds BRIDGWATER STW
Wet weather
The discharge
- Spill day
- Thursday, 2 May 2024
- Started
- 2 May 2024, 05:10
- Ended
- 2 May 2024, 09:50
- Duration
- 4 hours 40 minutes
- Receiving water
- King's Sedgemoor Drain - Henley Sluice to mouth
- Parish
- Othery
Rainfall evidence
Daily rainfall at the matched gauge (West Sedgemoor) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 02/05/2024 (spill day) | 0.539 mm | rain |
| 01/05/2024 | 32.704 mm | rain |
| 30/04/2024 | 5.516 mm | rain |
| 29/04/2024 | 0.337 mm | rain |
| 28/04/2024 | 0 mm | dry |
River flow that day: 15.746 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 2.9 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
- EA annual return (2024)
- 16 counted spills · 118 h total
- Monitor uptime (2024)
- 99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01086). Rainfall: EA Hydrology gauge a92acb90-1626-40c3-865f-bd24386626e3. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.