Molinnis, Bugle

Combined sewer overflow · SBB00794 · feeds ST AUSTELL NORTH STW
Wet weather

The discharge

Spill day
Friday, 15 March 2024
Started
15 Mar 2024, 02:59
Ended
15 Mar 2024, 03:44
Duration
45 minutes
Receiving water
Par River (Upper)
Parish
Treverbyn

Rainfall evidence

Daily rainfall at the matched gauge (Luxulyan) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
15/03/2024 (spill day)3.2 mmrain
14/03/202415.2 mmrain
13/03/20240.4 mmrain
12/03/20240.3 mmrain
11/03/20249.8 mmrain

River flow that day: 16.219 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
45 counted spills · 95 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00794). Rainfall: EA Hydrology gauge 14aadf3c-3d4d-44b3-b26b-cf705827d00e_377323. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Par & St Austell Data.