← The Willows, North Hinksey Lane

Spill evidence · River Hub

The Willows, North Hinksey Lane

Combined sewer overflow · TWL00411 · feeds OXFORD STW
Wet weather

The discharge

Spill day
Wednesday, 21 January 2026
Started
21 Jan 2026, 20:00
Ended
22 Jan 2026, 00:15
Duration
4 hours 15 minutes
Receiving water
Thames (Evenlode to Thame)
Parish
Botley and North Hinksey

Rainfall evidence

Daily rainfall at the matched gauge (Osney Lock) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
21/01/2026 (spill day)8.56 mmrain
20/01/20266.14 mmrain
19/01/20260.32 mmrain
18/01/20260.68 mmrain
17/01/20260.37 mmrain

River flow that day: 34.598 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00411). Rainfall: EA Hydrology gauge 5086b349-e04b-4f8e-b8f1-fa92b21078d0_256230TP. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Ock Data.