Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

12
Above the 2050 cap
of 18 tracked
0
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
6
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Wick St Lawrence Storm Tank
WXW01252
2050100 ·24
61
22 events
-39%6.1×Falling — behind
Ubley Frog Lane Storm Tank
WXW01163
2050108 ·24
50
38 events
-54%5×Falling — behind
Butcombe Storm Tank
WXW00217
205062 ·24
44
14 events
-29%4.4×Falling — behind
Blagdon Storm Tank
WXW00145
205046 ·24
34
30 events
-26%3.4×Falling — behind
Langford Blackmoor Road
WXW00616
205046 ·24
33
12 events
-28%3.3×Falling — behind
Portishead Coombe/slade Road Junction
WXW00998
205034 ·24
26
22 events
-24%2.6×Falling — behind
Portishead High Street Nr Builders Yard
WXW00773
205027 ·24
24
16 events
-11%2.4×Falling — behind
Wrington Storm Tank
WXW01290
205057 ·24
24
25 events
-58%2.4×Falling — behind
Portishead Portbury Ditch Off Harbour Rd
WXW00501
205026 ·24
19
56 events
-27%1.9×Falling — behind
Portishead Town Harbour Road
WXW00876
205023 ·24
15
37 events
-35%1.5×Nearly there
Sandford Sandmead Lane
WXW00961
205027 ·24
14
6 events
-48%1.4×Nearly there
Portishead Slade Road O/s 47
WXW00999
205016 ·24
12
11 events
-25%1.2×Nearly there
Clevedon Main
WXW00299
205018 ·24
10
11 events
-44%1×Within the cap
Portishead Poacher Hotel (anchor Hotel)
WXW01304
20505 ·24
6
11 events
+20%0.6×Within the cap
Sandford Batch
WXW00956
20507 ·24
5
7 events
-29%0.5×Within the cap
Wrington Inlet
WXW01291
205010 ·24
5
6 events
-50%0.5×Within the cap
Clevedon Old Street O/s 46
WXW00825
20501 ·25
1
0 events
0%0.1×—Within the cap
Wsx10113
WSX10113
20501 ·25
1
1 events
0%0.1×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →