Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The Nevern and north Pembrokeshire coast is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

15
Above the 2050 cap
of 19 tracked
11
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
4
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Crymmych Wwtw Storm Overflow
DCWW628
2050134 ·22
131
0 events
-2%13.1×Falling — behind
Dinas Cross Fishguard Storm Overflow
DCWW617
205068 ·22
100
0 events
+47%10×Rising
Bridge Street Fishguard Storm Overflow
DCWW111
205076 ·22
84
0 events
+11%8.4×Rising
St Nicholas Wwtw Storm Overflow
DCWW161
205023 ·22
79
0 events
+243%7.9×Rising
Porthgain Wwtw Overflow
DCWW1851
205029 ·22
78
0 events
+169%7.8×Rising
Llanychaer Wwtw Storm Overflow
DCWW889
2050112 ·22
75
0 events
-33%7.5×Falling — behind
Croesgoch Wwtw Storm Overflow
DCWW1746
20500 ·22
67
0 events
—6.7×Rising
Solva Storm Overflow
DCWW343
20506 ·22
61
0 events
+917%6.1×Rising
Pit Street St David's Storm Overflow
DCWW180
205018 ·22
54
0 events
+200%5.4×Rising
Railway Terrace Storm Overflow
DCWW172
205025 ·22
49
0 events
+96%4.9×Rising
Nolton Haven Storm Overflow
DCWW207
205026 ·22
48
0 events
+85%4.8×Rising
Blaenffos Wwtw Storm Overflow
DCWW1840
205095 ·22
43
0 events
-55%4.3×Falling — behind
Newgale Wwtw Storm Overflow
DCWW319
205016 ·22
40
0 events
+150%4×Rising
Bishop's Palace St David's Storm Overflow
DCWW113
205015 ·22
34
0 events
+127%3.4×Rising
Eglwyswrw Wwtw Storm Overflow
DCWW969
205033 ·22
26
0 events
-21%2.6×Falling — behind
Parrog Road Storm Overflow
DCWW320
20500 ·22
5
0 events
—0.5×Within the cap
Fishguard Harbour Ps Overflow
DCWW1742
20500 ·22
2
0 events
—0.2×Within the cap
St David's Cathedral St David's Storm Overflow
DCWW162
20501 ·25
1
1 events
0%0.1×—Within the cap
Ceibwr Lane Moylegrove Storm Overflow
DCWW2322
20501 ·24
0
0 events
-100%0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →