← Brockham Bridge Xx pumping station

Spill evidence · River Hub

Brockham Bridge Xx pumping station

Pumping station overflow · TWL00058 · feeds DORKING, PIXHAM LANE, DORKING, STW"
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window

The discharge

Spill day
Tuesday, 24 November 2026
Started
24 Nov 2026, 07:45
Ended
24 Nov 2026, 09:00
Duration
1 hour 15 minutes
Receiving water
Tanners Brook (Holmewood to River Mole confluence at Brockham)
Parish
Brockham

Rainfall evidence

Daily rainfall at the matched gauge (Leatherhead) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
24/11/2026 (spill day)0 mmdry
23/11/20260.11 mmdry
22/11/20260 mmdry
21/11/20260.01 mmdry
20/11/20260 mmdry

River flow that day: 8.534 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00058). Rainfall: EA Hydrology gauge 615a3b67-096b-47e1-b34d-a75dd217e9aa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Mole Data.