← Crawley STW

Spill evidence · River Hub

Crawley STW

Storm overflow at the works · TWL00118 · feeds LONDON (Crawley STW)
Dry spill

Evidence strength

High confidence
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 96% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Sunday, 22 September 2024
Started
22 Sept 2024, 23:15
Ended
22 Sept 2024, 23:45
Duration
30 minutes
Receiving water
Tilgate Brook and Gatwick Stream at Crawley
Parish
Horley

Rainfall evidence

Daily rainfall at the matched gauge (Burstow) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
22/09/2024 (spill day)0 mmdry
21/09/20240 mmdry
20/09/20240 mmdry
19/09/20240 mmdry
18/09/20240 mmdry

River flow that day: 2.315 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
46 counted spills · 533 h total
Monitor uptime (2024)
96% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00118). Rainfall: EA Hydrology gauge 8864da31-6c81-4cb1-bde9-d4ca73423222. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Mole Data.
Spill evidence — Crawley STW — River Mole Data