← Commonside (leatherhead) pumping station

Spill evidence · River Hub

Commonside (leatherhead) pumping station

Pumping station overflow · TWL00111 · feeds LEATHERHEAD STW
Wet weather

The discharge

Spill day
Friday, 26 January 2024
Started
26 Jan 2024, 13:15
Ended
26 Jan 2024, 14:45
Duration
1 hour 30 minutes
Receiving water
Downside Ditches and Bookham Brook
Parish
Effingham

Rainfall evidence

Daily rainfall at the matched gauge (Leatherhead) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
26/01/2024 (spill day)0 mmdry
25/01/20244.1 mmrain
24/01/20240.1 mmdry
23/01/20240.9 mmrain
22/01/20241.1 mmrain

River flow that day: 7.551 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
13 counted spills · 37 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00111). Rainfall: EA Hydrology gauge 615a3b67-096b-47e1-b34d-a75dd217e9aa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Mole Data.