What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08SO104713 · b | WFD_ND | No deterioration | Amend total P permit Speldhurst WTW | Complete 2025-26 | Barden Mill Stream |
| 08SO102442 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Bethersden WTW | Due 2026-27 | BETHERSDEN |
| 08SO102530 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Bidborough WTW | Due 2026-27 | Barden Mill Stream |
| 08SO102689 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor BIDBOROUGH WWTW | Due 2026-27 | Barden Mill Stream |
| 08SO102444 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Biddenden WTW | Due 2026-27 | Hammer Stream |
| 08SO102690 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor BIDDENDEN WWTW | Due 2026-27 | Hammer Stream |
| 08SO102699 · a | U_MON3 | Monitoring | U_MON3b: MCERTS certified overflow operation monitor Broadford Horsmonden WPS | Due 2026-27 | Teise and Lesser Teise |
| 08SO102714 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor CHEQUERS LAMBERHURST WPS | Due 2026-27 | Teise at Lamberhurst |
| 08SO102426 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Cowden WTW | Due 2026-27 | COWDEN |
| 08SO102722 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor COWDEN WWTW | Due 2026-27 | Kent Water |
| 08SO102447 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Cranbrook WTW | Due 2026-27 | Hammer Stream |
| 08SO102724 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor CRANBROOK WWTW | Due 2026-27 | Hammer Stream |
| 08SO102464 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Eden Vale East Grinstead WTW | Due 2026-27 | Eden Brook |
| 08SO102739 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor EDEN VALE EAST GRINSTEAD WWTW | Due 2026-27 | Eden Brook |
| 08SO102465 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Edenbridge WTW | Due 2026-27 | Lower Eden |
| 08SO102740 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor EDENBRIDGE WWTW | Due 2026-27 | Lower Eden |
| 08SO102466 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Felbridge WTW | Due 2026-27 | Eden Brook |
| 08SO102744 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor FELBRIDGE WWTW | Due 2026-27 | Eden Brook |
| 08SO102417 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Fordcombe WTW | Due 2026-27 | FORDCOMBE |
| 08SO102752 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor FORDCOMBE WWTW | Due 2026-27 | Mid Medway from Hartfield to Eden Confluence |
| 08SO102467 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Forest Row WTW | Due 2026-27 | Medway at Weir Wood |
| 08SO102753 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor FOREST ROW WWTW | Due 2026-27 | Medway at Weir Wood |
| 08SO102450 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Frant WTW | Due 2026-27 | FRANT |
| 08SO102754 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor FRANT WWTW | Due 2026-27 | Bartley Mill Stream |
| 08SO102451 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Frittenden WTW | Due 2026-27 | FRITTENDEN |
| 08SO102431 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Godstone WTW | Due 2026-27 | Gibbs Brook |
| 08SO102760 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor GODSTONE WWTW | Due 2026-27 | Gibbs Brook |
| 08SO102452 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Grain WTW | Due 2026-27 | GRAIN |
| 08SO102455 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Hamhill WTW | Due 2026-27 | Leybourne Stream |
| 08SO102457 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Harrietsham WTW | Due 2026-27 | HARRIETSHAM |
| 08SO102773 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor HARRIETSHAM WWTW | Due 2026-27 | Len |
| 08SO102432 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Hartfield WTW | Due 2026-27 | HARTFIELD |
| 08SO102774 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor HARTFIELD WWTW | Due 2026-27 | Mid Medway from Hartfield to Eden Confluence |
| 08SO102775 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor HARTLAKE ROAD HADLOW WPS | Due 2026-27 | Mid Medway from Eden Confluence to Yalding |
| 08SO102566 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring HIGH HALDEN WTW | Due 2026-27 | HIGH HALDEN |
| 08SO102782 · a | U_MON3 | Monitoring | U_MON3b: MCERTS certified overflow operation monitor HORSMONDEN WWTW | Due 2026-27 | Lower Teise |
| 08SO102570 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring KILNDOWN WTW | Due 2026-27 | KILNDOWN |
| 08SO102533 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Leeds WTW | Due 2026-27 | Barden Mill Stream |
| 08SO102792 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor LEEDS WWTW | Due 2026-27 | Barden Mill Stream |
| 08SO102472 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Lingfield WTW | Due 2026-27 | Ray Brook |
| 08SO102795 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor LINGFIELD WWTW | Due 2026-27 | Ray Brook |
| 08SO102572 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring LINTON WTW | Due 2026-27 | LINTON CSO - 115991 |
| 08SO102796 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor LINTON WWTW | Due 2026-27 | LINTON CSO - 115991 |
| 08SO102801 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor LUXFORDS LANE EAST GRINSTEAD WWTW | Due 2026-27 | Medway at Weir Wood |
| 08SO102565 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Moat Road Headcorn New WPS | Due 2026-27 | Beult |
| 08SO102818 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor MOAT ROAD HEADCORN NEW WPS | Due 2026-27 | Beult |
| 08SO102479 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Nutley WTW | Due 2026-27 | NUTLEY |
| 08SO102832 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor NUTLEY WWTW | Due 2026-27 | Pippingford Brook |
| 08SO102480 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Oxted WTW | Due 2026-27 | Upper Eden |
| 08SO102834 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor OXTED WWTW | Due 2026-27 | Upper Eden |
| 08SO102535 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Paddock Wood WTW | Due 2026-27 | Lower Teise |
| 08SO102835 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor PADDOCK WOOD WWTW | Due 2026-27 | Lower Teise |
| 08SO102574 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils PEMBURY WTW | Due 2026-27 | Tudeley Brook |
| 08SO102838 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor PEMBURY WWTW | Due 2026-27 | Tudeley Brook |
| 08SO102481 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Penshurst WTW | Due 2026-27 | PENSHURST |
| 08SO102839 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor PENSHURST WWTW | Due 2026-27 | Mid Medway from Eden Confluence to Yalding |
| 08SO102576 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring REDGATE MILL CROWBOROUGH WTW | Due 2026-27 | Eridge Stream |
| 08SO102854 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor REDGATE MILL CROWBOROUGH WWTW | Due 2026-27 | Eridge Stream |
| 08SO102500 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Sissinghurst WTW | Due 2026-27 | SISSINGHURST |
| 08SO102874 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SISSINGHURST WWTW | Due 2026-27 | Hammer Stream |
| 08SO104838 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring SITTINGBOURNE WTW | Due 2026-27 | CROWN QUAY LANE SITTINGBOURNE CSO - 108623 |
| 08SO102875 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SITTINGBOURNE WWTW | Due 2026-27 | CROWN QUAY LANE SITTINGBOURNE CSO - 108623 |
| 08SO102540 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Smarden WTW | Due 2026-27 | SMARDEN |
| 08SO102879 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SMARDEN WWTW | Due 2026-27 | Beult |
| 08SO102585 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring SMITHS LANE GOUDHURST WTW | Due 2026-27 | SMITHS LANE GOUDHURST |
| 08SO102880 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SMITHS LANE GOUDHURST WWTW | Due 2026-27 | Teise and Lesser Teise |
| 08SO102883 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SOUTH STREET EAST BARMING WPS | Due 2026-27 | Medway at Maidstone |
| 08SO102524 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring St John’s Crowborough WTW | Due 2026-27 | Friars Gate Stream |
| 08SO102886 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor ST JOHNS CROWBOROUGH WWTW | Due 2026-27 | Friars Gate Stream |
| 08SO102541 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Staplehurst WTW | Due 2026-27 | Beult |
| 08SO102889 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor STAPLEHURST WWTW | Due 2026-27 | Beult |
| 08SO104786 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring STONE HILL ROAD EGERTON WTW | Due 2026-27 | STONE HILL ROAD EGERTON |
| 08SO102893 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor STONE HILL ROAD EGERTON WWTW | Due 2026-27 | Sherway |
| 08SO102439 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Sutton Valence WTW | Due 2026-27 | SUTTON VALENCE |
| 08SO102907 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor TINKERS LANE TICEHURST WPS | Due 2026-27 | Bewl |
| 08SO102546 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Tonbridge WTW | Due 2026-27 | Mid Medway from Eden Confluence to Yalding |
| 08SO102908 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor TONBRIDGE WWTW | Due 2026-27 | Mid Medway from Eden Confluence to Yalding |
| 08SO102547 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Tunbridge Wells North WTW | Due 2026-27 | Somerhill Stream |
| 08SO102909 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor TUNBRIDGE WELLS NORTH WWTW | Due 2026-27 | Somerhill Stream |
| 08SO102548 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Tunbridge Wells South WTW | Due 2026-27 | Grom |
| 08SO102910 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor TUNBRIDGE WELLS SOUTH WWTW | Due 2026-27 | Grom |
| 08SO102590 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring ULCOMBE WTW | Due 2026-27 | ULCOMBE |
| 08SO102912 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor ULCOMBE WWTW | Due 2026-27 | Ulcombe Stream |
| 08SO102549 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Underhill Goudhurst WTW | Due 2026-27 | UNDERHILL GOUDHURST |
| 08SO104839 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring WEST HOATHLY WTW | Due 2026-27 | WEST HOATHLY |
| 08SO102919 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor WEST HOATHLY WWTW | Due 2026-27 | Medway at Weir Wood |
| 08SO102926 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor WHITEGATES LANE WADHURST WWTW | Due 2026-27 | Bartley Mill Stream |
| 08SO102552 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Whitewall Creek WTW | Due 2026-27 | WHITEWALL CREEK SSO - 115854 |
| 08SO102928 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor WHITEWALL CREEK WWTW | Due 2026-27 | WHITEWALL CREEK SSO - 115854 |
| 08SO102936 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor YALDING OLD WORKS WPS | Due 2026-27 | Medway at Maidstone |
| 08SO101080 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Bidborough WTW | Due 2026-27 | Bartley Mill Stream |
| 08SO101074 · a | WFD_NDLS_Chem1 | No deterioration | Prevent any deterioration Bidborough WTW | Due 2026-27 | Barden Mill Stream |
| 08SO101097 · b | WFD_NDLS_Chem1 | No deterioration | Prevent any deterioration Cranbrook WTW | Due 2026-27 | Hammer Stream |
| 08SO101081 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Cranbrook WTW | Due 2026-27 | Hammer Stream |
| 08SO101082 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Felbridge WTW | Due 2026-27 | Eden Brook |
| 08SO101070 · c | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Luxfords Lane (East Grinstead) | Due 2026-27 | Medway at Weir Wood |
| 08SO101084 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Luxfords Lane (East Grinstead) STW | Due 2026-27 | Medway at Weir Wood |
| 08SO101071 · c | WFD_NDLS_Chem1 | No deterioration | Prevent any deterioration Oxted STW | Due 2026-27 | Upper Eden |
| 08SO101085 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Paddock Wood WTW | Due 2026-27 | Lower Teise |
| 08SO101086 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Paddock Wood WTW | Due 2026-27 | Lower Teise |
| 08SO101072 · b | WFD_NDLS_Chem1 | No deterioration | Prevent any deterioration Pembury STW | Due 2026-27 | Tudeley Brook |
| 08SO101088 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Pembury WTW | Due 2026-27 | Tudeley Brook |
| 08SO101087 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Pembury WTW | Due 2026-27 | Tudeley Brook |
| 08SO101099 · b | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Redgate Mill WTW | Due 2026-27 | Jarvis Brook |
| 08SO101090 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Sutton Valence WTW | Due 2026-27 | SUTTON VALENCE |
| 08SO101073 · c | WFD_NDLS_Chem1 | No deterioration | Prevent any deterioration Tonbridge (Low Flows) | Due 2026-27 | Mid Medway from Eden Confluence to Yalding |
| 08SO101100 · b | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Tonbridge WTW (high flows) | Due 2026-27 | Mid Medway from Eden Confluence to Yalding |
| 08SO101075 · a | WFD_NDLS_Chem1 | No deterioration | Prevent any deterioration Tunbridge Wells North WTW | Due 2026-27 | Somerhill Stream |
| 08SO101092 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Tunbridge Wells South WTW | Due 2026-27 | Grom |
| 08SO101091 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Tunbridge Wells South WTW | Due 2026-27 | Grom |
| 08SO104950 · ra | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact APPLE TREE LANE TUNBRIDGE WELLS CSO | Due 2027-28 | Somerhill Stream |
| 08SO100043 · d | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact BIDBOROUGH SSO | Due 2027-28 | BARDEN MILL STREAM |
| 08SO104950 · rv | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact CANNON LANE TONBRIDGE CSO | Due 2027-28 | Mid Medway from Eden Confluence to Yalding |
| 08SO104950 · rw | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact COLDHARBOUR LANE HILDENBOROUGH CEO | Due 2027-28 | Hilden Brook |
| 08SO100043 · n | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact CRANBROOK CSO | Due 2027-28 | Hammer Stream |
| 08SO104950 · pi | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact CRANBROOK SSO | Due 2027-28 | Hammer Stream |
| 08SO100043 · s | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact EDEN VALE EAST GRINSTEAD SSO | Due 2027-28 | FURZEFIELD ROAD BALDWINS HILL CEO - 108578 |
| 08SO104950 · qk | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact FELBRIDGE CSO | Due 2027-28 | Eden Brook |
| 08SO104950 · qs | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact FORDCOMBE CSO | Due 2027-28 | Mid Medway from Hartfield to Eden Confluence |
| 08SO104950 · qn | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact FRANT SSO | Due 2027-28 | Bartley Mill Stream |
| 08SO104950 · ad | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact GODSTONE SSO | Due 2027-28 | GIBBS BROOK |
| 08SO104950 · rm | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact GROOMBRIDGE EMO | Due 2027-28 | Grom |
| 08SO100043 · ag | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact GROSVENOR REC GROUND TUNBRIDGE WELLS CSO | Due 2027-28 | SOMERHILL STREAM |
| 08SO103801 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. HARRIETSHAM WTW | Due 2027-28 | HARRIETSHAM |
| 08SO104950 · pd | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact HIGH HALDEN SSO | Due 2027-28 | Upper Beult - High Halden and Bethersden Streams |
| 08SO104950 · al | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact HIGH HALDEN WTW | Due 2027-28 | HIGH HALDEN |
| 08SO104950 · ru | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact HILDEN PARK ROAD HILDENBOROUGH CEO | Due 2027-28 | Mid Medway from Eden Confluence to Yalding |
| 08SO104950 · az | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact LEEDS SSO | Due 2027-28 | BARDEN MILL STREAM |
| 08SO103805 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. LEEDS WTW | Due 2027-28 | Len |
| 08SO104122 · a | WFD_INV | Investigation | Ammonia investigation LINGFIELD | Due 2027-28 | Ray Brook |
| 08SO104950 · rx | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact LINGFIELD SSO | Due 2027-28 | Ray Brook |
| 08SO104950 · rb | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact NEVILLE STREET TUNBRIDGE WELLS CSO | Due 2027-28 | Grom |
| 08SO100043 · bs | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact NUTLEY SSO | Due 2027-28 | PIPPINGFORD BROOK |
| 08SO104950 · pf | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact OXTED SSO | Due 2027-28 | Upper Eden |
| 08SO104950 · qc | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact PENSHURST CSO | Due 2027-28 | Mid Medway from Eden Confluence to Yalding |
| 08SO104950 · po | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact PRIORY MILL TONBRIDGE CEO | Due 2027-28 | Somerhill Stream |
| 08SO104950 · ch | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact REDGATE MILL CROWBOROUGH CSO | Due 2027-28 | ERIDGE STREAM |
| 08SO104950 · pg | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact REDGATE MILL CROWBOROUGH SSO | Due 2027-28 | Eridge Stream |
| 08SO104950 · qg | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact ST JOHNS CROWBOROUGH SSO | Due 2027-28 | Friars Gate Stream |
| 08SO104950 · pj | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact TUNBRIDGE WELLS SOUTH CSO | Due 2027-28 | Grom |
| 08SO104950 · oy | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact TUNBRIDGE WELLS SOUTH SSO | Due 2027-28 | Grom |
| 08SO104950 · dj | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact WATERFRETS LANGTON GREEN CSO | Due 2027-28 | WATERFRETS LANGTON GREEN CSO - 108753 |
| 08SO101109 · a | SW_ND | No deterioration | Prevent any deterioration Sittingbourne WTW | Due 2027-28 | CROWN QUAY LANE SITTINGBOURNE CSO - 108623 |
| 08SO101105 · a | SW_ND | No deterioration | SuDS + Storage (10 spills solution) Sittingbourne WwTW CSO STORM TANKS | Due 2027-28 | CROWN QUAY LANE SITTINGBOURNE CSO - 108623 |
| 08SO104984 · a | WFD_IMPg | Improvement | Aeration of FE: 5.6mg/l DO in Bethersden WwTW discharge. Bethersden | Due 2029-30 | BETHERSDEN |
| 08SO104038 · a | WFD_ND | No deterioration | Amend WFD ND BOD permit BIDBOROUGH | Due 2029-30 | Barden Mill Stream |
| 08SO104011 · a | WFD_IMPg | Improvement | Amend Total P permit BIDBOROUGH | Due 2029-30 | Barden Mill Stream |
| 08SO100084 · a | EnvAct_IMP2 | Improvement | Storage Only BIDBOROUGH SSO | Due 2029-30 | BARDEN MILL STREAM |
| 08SO104985 · a | WFD_IMPg | Improvement | Aeration of FE: 8.3mg/l DO in Biddenden WwTW discharge. Biddenden | Due 2029-30 | Hammer Stream |
| 08SO104075 · a | WFD_IMPm | Improvement | Amend Total P permit CHERRY GARDENS GOUDHURST | Due 2029-30 | Teise and Lesser Teise |
| 08SO104077 · a | WFD_IMPg | Improvement | Amend Total P permit COWDEN | Due 2029-30 | COWDEN |
| 08SO104079 · a | WFD_IMPm | Improvement | Amend Total P permit COXHEATH | Due 2029-30 | Loose Stream |
| 08SO103909 · a | EnvAct_IMP2 | Improvement | Wetland + Lining CRANBROOK SSO | Due 2029-30 | Hammer Stream |
| 08SO101097 · a | WFD_ND_CHEM3 | No deterioration | Prevent any deterioration Cranbrook WTW | Due 2029-30 | Hammer Stream |
| 08SO100108 · a | EnvAct_IMP2 | Improvement | SuDS + Storage EDEN VALE EAST GRINSTEAD SSO | Due 2029-30 | FURZEFIELD ROAD BALDWINS HILL CEO - 108578 |
| 08SO104033 · a | WFD_ND | No deterioration | Amend WFD ND BOD permit FELBRIDGE | Due 2029-30 | Eden Brook |
| 08SO104121 · a | WFD_IMPg | Improvement | Amend Ammonia permit FELBRIDGE | Due 2029-30 | Eden Brook |
| 08SO103940 · a | EnvAct_IMP2 | Improvement | SuDS + Storage FELBRIDGE CSO | Due 2029-30 | Eden Brook |
| 08SO104013 · a | EnvAct_IMP1 | Improvement | Amend Total P permit FORDCOMBE | Due 2029-30 | FORDCOMBE |
| 08SO103923 · a | EnvAct_IMP2 | Improvement | SuDS + Storage FORDCOMBE CSO | Due 2029-30 | Mid Medway from Hartfield to Eden Confluence |
| 08SO104014 · a | WFD_IMPm | Improvement | Amend Total P permit FOREST ROW | Due 2029-30 | Medway at Weir Wood |
| 08SO104084 · a | WFD_IMPg | Improvement | Amend Total P permit FRANT | Due 2029-30 | FRANT |
| 08SO104040 · a | WFD_ND | No deterioration | Amend WFD ND BOD permit GODSTONE | Due 2029-30 | Gibbs Brook |
| 08SO100120 · a | EnvAct_IMP2 | Improvement | SuDS + Storage GODSTONE SSO | Due 2029-30 | GIBBS BROOK |
| 08SO103930 · a | EnvAct_IMP2 | Improvement | Preferred option is SuDS and Storage, but costs based on storage only GROOMBRIDGE EMO | Due 2029-30 | Grom |
| 08SO100124 · a | EnvAct_IMP2 | Improvement | Screen Only (IMP5) GROSVENOR REC GROUND TUNBRIDGE WELLS CSO | Due 2029-30 | SOMERHILL STREAM |
| 08SO104015 · a | WFD_IMPg | Improvement | Amend Total P permit HADLOW | Due 2029-30 | Bourne (Medway) |
| 08SO104016 · a | WFD_IMPg | Improvement | Amend Total P permit HARTFIELD | Due 2029-30 | HARTFIELD |
| 08SO103905 · a | EnvAct_IMP2 | Improvement | SuDS + Storage HIGH HALDEN SSO | Due 2029-30 | Upper Beult - High Halden and Bethersden Streams |
| 08SO100128 · a | EnvAct_IMP5 | Improvement | SuDS + Storage HIGH HALDEN WTW | Due 2029-30 | HIGH HALDEN |
| 08SO104018 · a | WFD_IMPm | Improvement | Amend Total P permit LEEDS | Due 2029-30 | Len |
| 08SO100143 · a | EnvAct_IMP2 | Improvement | SuDS + Storage LEEDS SSO | Due 2029-30 | BARDEN MILL STREAM |
| 08SO104043 · a | WFD_ND | No deterioration | Amend WFD ND BOD permit LINGFIELD | Due 2029-30 | Ray Brook |
| 08SO102650 · a | SSSI_IMP | Improvement | P reduction Linton WwTW | Due 2029-30 | LINTON CSO - 115991 |
| 08SO101070 · a | WFD_IMP_CHEM | Improvement | Deliver a physical improvement Luxfords Lane (East Grinstead) | Due 2029-30 | Medway at Weir Wood |
| 08SO101070 · b | WFD_ND_CHEM4 | No deterioration | Prevent any deterioration Luxfords Lane (East Grinstead) | Due 2029-30 | Medway at Weir Wood |
| 09SO104005 · a | WFD_IMPp | Improvement | Amend Total P permit LUXFORDS LANE EAST GRINSTEAD | Due 2029-30 | Medway at Weir Wood |
| 08SO103927 · a | EnvAct_IMP2 | Improvement | Preferred option is SuDS and Storage, but costs based on storage only NEVILLE STREET TUNBRIDGE WELLS CSO | Due 2029-30 | Grom |
| 08SO104091 · a | WFD_IMPm | Improvement | Amend Total P permit NUTLEY | Due 2029-30 | NUTLEY |
| 08SO100164 · a | EnvAct_IMP2 | Improvement | SuDS + Storage NUTLEY SSO | Due 2029-30 | PIPPINGFORD BROOK |
| 08SO104046 · a | WFD_ND | No deterioration | Amend WFD ND BOD permit OXTED | Due 2029-30 | Upper Eden |
| 08SO104060 · a | WFD_IMP_MOD | Improvement | Amend P permit level - P removal OXTED | Due 2029-30 | Upper Eden |
| 08SO101071 · b | WFD_ND_CHEM4 | No deterioration | Prevent any deterioration Oxted STW | Due 2029-30 | Upper Eden |
| 08SO101071 · a | WFD_IMP_CHEM | Improvement | Deliver a physical improvement Oxted STW | Due 2029-30 | Upper Eden |
| 08SO104711 · a | WFD_IMPp | Improvement | Amend total P permit Paddock Wood | Due 2029-30 | Lower Teise |
| 08SO104036 · b | WFD_ND | No deterioration | Amend WFD ND BOD permit PADDOCK WOOD | Due 2029-30 | Lower Teise |
| 08SO104036 · a | WFD_ND | No deterioration | Amend WFD ND Ammonia permit PADDOCK WOOD | Due 2029-30 | Lower Teise |
| 08SO104715 · a | WFD_IMPp | Improvement | Amend total P permit Pembury | Due 2029-30 | Tudeley Brook |
| 08SO101072 · a | WFD_IMP_CHEM | Improvement | Deliver a physical improvement Pembury STW | Due 2029-30 | Tudeley Brook |
| 08SO104093 · a | WFD_IMPg | Improvement | Amend Total P permit PENSHURST | Due 2029-30 | PENSHURST |
| 08SO103913 · a | EnvAct_IMP2 | Improvement | SuDS + Storage PRIORY MILL TONBRIDGE CEO | Due 2029-30 | Somerhill Stream |
| 08SO101099 · a | WFD_ND_CHEM3 | No deterioration | Prevent any deterioration Redgate Mill WTW | Due 2029-30 | Jarvis Brook |
| 08SO104712 · a | EnvAct_IMP1 | Improvement | Amend total P permit Redgate Mill, Crowborough | Due 2029-30 | Eridge Stream |
| 08SO100001 · a | DrWPA_ND | No deterioration | Protecting raw water quality from deterioration from pesticides (with specific focus on blackgrass and oil seed rape herbicides, as well as resilience to pesticides and herbicides in the round) through working in partnership with others to deliver: sustainable pest management advice; trials for source control approaches; targeted pathway disruption pilots. River Beult catchment scheme: To protect Burham WSW from deterioration in raw water quality | Due 2029-30 | Beult |
| 08SO104713 · a | EnvAct_IMP1 | Improvement | Amend total P permit Speldhurst | Due 2029-30 | Barden Mill Stream |
| 08SO104020 · a | WFD_IMPm | Improvement | Amend Total P permit ST JOHNS CROWBOROUGH | Due 2029-30 | Friars Gate Stream |
| 08SO104021 · a | WFD_IMPm | Improvement | Amend Total P permit TONBRIDGE | Due 2029-30 | Mid Medway from Eden Confluence to Yalding |
| 08SO101073 · a | WFD_IMP_CHEM | Improvement | Deliver a physical improvement Tonbridge (Low Flows) | Due 2029-30 | Mid Medway from Eden Confluence to Yalding |
| 08SO101073 · b | WFD_ND_CHEM4 | No deterioration | Prevent any deterioration Tonbridge (Low Flows) | Due 2029-30 | Mid Medway from Eden Confluence to Yalding |
| 08SO101100 · a | WFD_ND_CHEM3 | No deterioration | Prevent any deterioration Tonbridge WTW (high flows) | Due 2029-30 | Mid Medway from Eden Confluence to Yalding |
| 08SO104761 · a | WFD_IMPp | Improvement | Amend total P permit Tunbridge Wells North | Due 2029-30 | Somerhill Stream |
| 08SO103910 · a | EnvAct_IMP2 | Improvement | Wetland + Lining TUNBRIDGE WELLS SOUTH CSO | Due 2029-30 | Grom |
| 08SO103904 · a | EnvAct_IMP2 | Improvement | Wetland + Lining TUNBRIDGE WELLS SOUTH SSO | Due 2029-30 | Grom |
| 08SO104054 · a | WFD_ND | No deterioration | Amend WFD ND Ammonia permit Ulcombe WwTW | Due 2029-30 | Ulcombe Stream |
| 08SO104054 · b | WFD_ND | No deterioration | Amend WFD ND BOD permit Ulcombe WwTW | Due 2029-30 | Ulcombe Stream |
| 08SO102657 · b | U_IMP1 | Improvement | Replace descriptive with numerical BOD and SS permits Wallcrouch WTW | Due 2029-30 | Bewl |
| 08SO102657 · a | WFD_IMPg | Improvement | P reduction Wallcrouch WwTW | Due 2029-30 | Bewl |
| 08SO100210 · a | EnvAct_IMP2 | Improvement | Currently meets Defra rainfall target but may need <0 spill solution to prevent ecological harm WATERFRETS LANGTON GREEN CSO | Due 2029-30 | WATERFRETS LANGTON GREEN CSO - 108753 |
| 08SO101001 · a | U_IMP1 | Improvement | Actions to improve discharges from agglomerations that, through population growth, have crossed the population thresholds in the UWWTR and therefore must achieve more stringent UWWTR requirements. This includes newly qualifying discharges (from agglomerations >10,000population equivalent (PE)) within existing Sensitive Areas. This includes discharges of >2,000 PE to fresh waters and estuaries and discharges >10,000 PE to coastal waters, as well as discharges >10,000 PE and 100,000 PE to Sensitive Areas. Wateringbury WWTW | Due 2029-30 | Medway at Maidstone |
| 08SO103926 · a | EnvAct_IMP2 | Improvement | SuDS + Storage APPLE TREE LANE TUNBRIDGE WELLS CSO | Due 2034-35 | Somerhill Stream |
| 08SO103934 · a | EnvAct_IMP2 | Improvement | SuDS + Storage CANNON LANE TONBRIDGE CSO | Due 2034-35 | Mid Medway from Eden Confluence to Yalding |
| 08SO103933 · a | EnvAct_IMP2 | Improvement | SuDS + Storage HILDEN PARK ROAD HILDENBOROUGH CEO | Due 2034-35 | Mid Medway from Eden Confluence to Yalding |
| 08SO103946 · a | EnvAct_IMP2 | Improvement | Wetland + Lining LINGFIELD SSO | Due 2034-35 | Ray Brook |
| 08SO103936 · a | EnvAct_IMP2 | Improvement | Wetland + Lining OXTED SSO | Due 2034-35 | Upper Eden |
| 08SO100178 · a | EnvAct_IMP4 | Improvement | SuDS + Storage REDGATE MILL CROWBOROUGH CSO | Due 2034-35 | ERIDGE STREAM |
| 08SO103907 · a | EnvAct_IMP2 | Improvement | Preferred option is SuDS and Storage, but costs based on storage only REDGATE MILL CROWBOROUGH SSO | Due 2034-35 | Eridge Stream |
216 of 216 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.