← Lingfield Hospital School Ceo - 108670

Spill evidence · River Hub

Lingfield Hospital School Ceo - 108670

Pumping station overflow · SWS00504 · feeds LINGFIELD STW
No rain data

The discharge

Spill day
Friday, 6 March 2026
Started
6 Mar 2026, 11:45
Ended
6 Mar 2026, 12:15
Duration
30 minutes
Receiving water
Eden Brook
Parish
Dormansland

Rainfall evidence

Daily rainfall at the matched gauge (Eden Vale) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
06/03/2026 (spill day)no data
05/03/2026no data
04/03/2026no data
03/03/2026no data
02/03/2026no data

River flow that day: 6.453 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00504). Rainfall: EA Hydrology gauge 05d55cc4-d0da-4293-bd9f-07025fdcd689. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.
Spill evidence — Lingfield Hospital School Ceo - 108670 — River Medway Data