← Oxted, - 115423

Spill evidence · River Hub

Oxted, - 115423

Storm overflow at the works · SWS00637 · feeds OXTED STW
No rain data

The discharge

Spill day
Saturday, 7 February 2026
Started
7 Feb 2026, 21:30
Ended
8 Feb 2026, 09:30
Duration
12 hours
Receiving water
Upper Eden
Parish
Oxted

Rainfall evidence

Daily rainfall at the matched gauge (Godstone) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
07/02/2026 (spill day)no data
06/02/2026no data
05/02/2026no data
04/02/2026no data
03/02/2026no data

River flow that day: 28.274 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00637). Rainfall: EA Hydrology gauge c4c921dd-85e0-4634-b0e6-5483f1642ff2. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.
Spill evidence — Oxted, - 115423 — River Medway Data