← Tudeley Ceo - 116069

Spill evidence · River Hub

Tudeley Ceo - 116069

Pumping station overflow · SWS00317 · feeds TONBRIDGE STW
No rain data

The discharge

Spill day
Wednesday, 28 January 2026
Started
28 Jan 2026, 00:51
Ended
28 Jan 2026, 01:07
Duration
16 minutes 13 seconds
Receiving water
Alder Stream and Hammer Dyke
Parish
Capel

Rainfall evidence

Daily rainfall at the matched gauge (Pembury) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
28/01/2026 (spill day)no data
27/01/2026no data
26/01/2026no data
25/01/2026no data
24/01/2026no data

River flow that day: 29.046 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00317). Rainfall: EA Hydrology gauge 8d901b06-e5ca-469c-9c88-8d3de8ddda27. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.