River Hub
Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

33
Measures in this catchment
NEP, current record
29
Still active
not yet past their date
4
Assumed complete
completion date has passed
2
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100134a · 2dbf1ddaW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BONTDDU STW
Complete 2025-26Bontddu WwTW Storm Overflow
DCWW100069a · 29f568abW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BRONABER STW
Complete 2025-26Bronaber WwTW Storm Overflow
DCWW100195a · 86fb88e6W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
DOLGELLAU STW
Complete 2025-26Dolgellau Main Storm Overflow
DCWW100205a · b3cbd98eW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
FAIRBOURNE WWTW
Complete 2025-26Alyn Road Fairbourne Storm Overflow
DCWW102217a · 95634da4W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Barmouth WwTW Storm Discharge
Due 2026-27Barmouth Harbour Storm Overflow
DCWW102128a · 1e75aeb9W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BONTDDU STW SCREENED STORM/CRUDE EOF
Due 2026-27Bontddu WwTW Storm Overflow
DCWW102654a · c7511947W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
St. Mary's Terrace SPS CSO
Due 2026-27St. Mary's Terrace Storm Overflow
DCWW101219a · 0ce8479dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ARTHOG TERRACE PUMPING STATION, ARTHOG, FAIRBOURNE
Due 2029-30Arthog Terrace Storm Overflow
DCWW102606a · ee55b79eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Arthog Terrace SPS EO
Due 2029-30Arthog Terrace Storm Overflow
DCWW101168a · 0127d0c5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BARMOUTH WASTEWATER TREATMENT WORKS (MLWS OUTFALL)
Due 2029-30Barmouth Harbour Storm Overflow
DCWW101347a · c6943f91W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BARMOUTH WASTEWATER TREATMENT WORKS (VIA THE HEOL IDRIS VALVE)
Due 2029-30Barmouth Harbour Storm Overflow
DCWW102613a · 9167f6b2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BARMOUTH WwTW O/F via Long Sea Outfall
Due 2029-30Barmouth Harbour Storm Overflow
DCWW101174a · f076772aW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BONTDDU STW PUMPING STATION
Due 2029-30Bontddu WwTW Storm Overflow
DCWW101825b · bd9dfdb0W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
BRONABER STW
Due 2029-30BRONABER
DCWW101165a · 052e734fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BRYNCOCH SPS, ARTHOG, FAIRBOURNE
Due 2029-30Bryncoch Storm Overflow
DCWW102800a · 8b580c4cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Castell SPS CSO, Arthog, Gwynedd
Due 2029-30Castell Arthog Storm Overflow
DCWW101218a · b500fc74W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CASTLE SPS, ARTHOG, FAIRBOURNE
Due 2029-30Castell Arthog Storm Overflow
DCWW101582a · 9d7b1df3W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Dolgellau Main PS
Due 2029-30Dolgellau Main Storm Overflow
DCWW101233a · 33d02cd7W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FAIRBOURNE PUMPING STATION, FAIRBOURNE
Due 2029-30Alyn Road Fairbourne Storm Overflow
DCWW102607a · 2f915036W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Fairbourne SPS CSO
Due 2029-30Alyn Road Fairbourne Storm Overflow
DCWW102611a · 31258d67W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Fairbourne WwTW Storm overflow
Due 2029-30Fairbourne WwTW Storm Overflow
DCWW101164a · 91324a67W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FRIOG SPS, FAIRBOURNE
Due 2029-30Friogg Storm Overflow
DCWW101217a · 03300ecbW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
GLASFRYN TERRACE SPS, ARTHOG, FAIRBOURNE
Due 2029-30Glasfryn Terrace Storm Overflow
DCWW101169a · c9e6b7a6W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HARBOUR PUMPING STATION, CHURCH STREET, BARMOUTH
Due 2029-30Barmouth Harbour Storm Overflow
DCWW101582a · 9e27c5d4W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llanelltyd CSO
Due 2029-30East Llanelltyd Storm Overflow
DCWW102600a · 03829991W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANELLTYD PS
Due 2029-30Llanelltyd Storm Overflow
DCWW101826a · e899ee57W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANFACHRETH STW
Due 2029-30LLANFACHRETH
DCWW102493a · 065f6bd8W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Marian Mawr Splitter CSO, Dolgellau
Due 2029-30Marian Mawr Dolgellau Storm Overflow
DCWW101166a · d7e245b4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MAWDDACH CRESCENT SPS, ARTHOG, FAIRBOURNE
Due 2029-30Mawddach Crescent Storm Overflow
DCWW101287a · 644fcbf6W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PENMAENPOOL SEWAGE PUMPING STATION
Due 2029-30Penmaenpool Bridge Storm Overflow
DCWW101204a · 45e07720W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
St MARY'S PUMPING STATION, ARTHOG, FAIRBOURNE
Due 2029-30St. Mary's Terrace Storm Overflow
DCWW101582a · 211d7978W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
WESLEYAN TERRACE SEWAGE PUMPING ST
Due 2029-30Wesleyan Terrace Storm Overflow
DCWW101203a · 55310b57W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
WESLEYAN TERRACE SPS, ARTHOG, FAIRBOURNE
Due 2029-30Wesleyan Terrace Storm Overflow

33 of 33 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.