What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100134a · 2dbf1dda | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BONTDDU STW | Complete 2025-26 | Bontddu WwTW Storm Overflow |
| DCWW100069a · 29f568ab | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BRONABER STW | Complete 2025-26 | Bronaber WwTW Storm Overflow |
| DCWW100195a · 86fb88e6 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ DOLGELLAU STW | Complete 2025-26 | Dolgellau Main Storm Overflow |
| DCWW100205a · b3cbd98e | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ FAIRBOURNE WWTW | Complete 2025-26 | Alyn Road Fairbourne Storm Overflow |
| DCWW102217a · 95634da4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Barmouth WwTW Storm Discharge | Due 2026-27 | Barmouth Harbour Storm Overflow |
| DCWW102128a · 1e75aeb9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BONTDDU STW SCREENED STORM/CRUDE EOF | Due 2026-27 | Bontddu WwTW Storm Overflow |
| DCWW102654a · c7511947 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ St. Mary's Terrace SPS CSO | Due 2026-27 | St. Mary's Terrace Storm Overflow |
| DCWW101219a · 0ce8479d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ARTHOG TERRACE PUMPING STATION, ARTHOG, FAIRBOURNE | Due 2029-30 | Arthog Terrace Storm Overflow |
| DCWW102606a · ee55b79e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Arthog Terrace SPS EO | Due 2029-30 | Arthog Terrace Storm Overflow |
| DCWW101168a · 0127d0c5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BARMOUTH WASTEWATER TREATMENT WORKS (MLWS OUTFALL) | Due 2029-30 | Barmouth Harbour Storm Overflow |
| DCWW101347a · c6943f91 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BARMOUTH WASTEWATER TREATMENT WORKS (VIA THE HEOL IDRIS VALVE) | Due 2029-30 | Barmouth Harbour Storm Overflow |
| DCWW102613a · 9167f6b2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BARMOUTH WwTW O/F via Long Sea Outfall | Due 2029-30 | Barmouth Harbour Storm Overflow |
| DCWW101174a · f076772a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BONTDDU STW PUMPING STATION | Due 2029-30 | Bontddu WwTW Storm Overflow |
| DCWW101825b · bd9dfdb0 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ BRONABER STW | Due 2029-30 | BRONABER |
| DCWW101165a · 052e734f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRYNCOCH SPS, ARTHOG, FAIRBOURNE | Due 2029-30 | Bryncoch Storm Overflow |
| DCWW102800a · 8b580c4c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Castell SPS CSO, Arthog, Gwynedd | Due 2029-30 | Castell Arthog Storm Overflow |
| DCWW101218a · b500fc74 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CASTLE SPS, ARTHOG, FAIRBOURNE | Due 2029-30 | Castell Arthog Storm Overflow |
| DCWW101582a · 9d7b1df3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Dolgellau Main PS | Due 2029-30 | Dolgellau Main Storm Overflow |
| DCWW101233a · 33d02cd7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FAIRBOURNE PUMPING STATION, FAIRBOURNE | Due 2029-30 | Alyn Road Fairbourne Storm Overflow |
| DCWW102607a · 2f915036 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Fairbourne SPS CSO | Due 2029-30 | Alyn Road Fairbourne Storm Overflow |
| DCWW102611a · 31258d67 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Fairbourne WwTW Storm overflow | Due 2029-30 | Fairbourne WwTW Storm Overflow |
| DCWW101164a · 91324a67 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FRIOG SPS, FAIRBOURNE | Due 2029-30 | Friogg Storm Overflow |
| DCWW101217a · 03300ecb | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ GLASFRYN TERRACE SPS, ARTHOG, FAIRBOURNE | Due 2029-30 | Glasfryn Terrace Storm Overflow |
| DCWW101169a · c9e6b7a6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ HARBOUR PUMPING STATION, CHURCH STREET, BARMOUTH | Due 2029-30 | Barmouth Harbour Storm Overflow |
| DCWW101582a · 9e27c5d4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llanelltyd CSO | Due 2029-30 | East Llanelltyd Storm Overflow |
| DCWW102600a · 03829991 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANELLTYD PS | Due 2029-30 | Llanelltyd Storm Overflow |
| DCWW101826a · e899ee57 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANFACHRETH STW | Due 2029-30 | LLANFACHRETH |
| DCWW102493a · 065f6bd8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Marian Mawr Splitter CSO, Dolgellau | Due 2029-30 | Marian Mawr Dolgellau Storm Overflow |
| DCWW101166a · d7e245b4 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MAWDDACH CRESCENT SPS, ARTHOG, FAIRBOURNE | Due 2029-30 | Mawddach Crescent Storm Overflow |
| DCWW101287a · 644fcbf6 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENMAENPOOL SEWAGE PUMPING STATION | Due 2029-30 | Penmaenpool Bridge Storm Overflow |
| DCWW101204a · 45e07720 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ St MARY'S PUMPING STATION, ARTHOG, FAIRBOURNE | Due 2029-30 | St. Mary's Terrace Storm Overflow |
| DCWW101582a · 211d7978 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WESLEYAN TERRACE SEWAGE PUMPING ST | Due 2029-30 | Wesleyan Terrace Storm Overflow |
| DCWW101203a · 55310b57 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ WESLEYAN TERRACE SPS, ARTHOG, FAIRBOURNE | Due 2029-30 | Wesleyan Terrace Storm Overflow |
33 of 33 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.