Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

11
Measures in this catchment
WINEP, current record
11
Still active
not yet past their date
0
Assumed complete
completion date has passed
1
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SW104945 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
BRIDESTOW STW
Due 2026-27Lew (Tamar)
08SW104946 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BRIDESTOW STW
Due 2026-27Lew (Tamar)
08SW104308 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
LEWDOWN STW
Due 2026-27Lew (Tamar)
08SW104316 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
LEWDOWN STW
Due 2026-27Lew (Tamar)
08SW104752 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
LIFTON STW
Due 2026-27Thrushel
08SW104751 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
LIFTON STW
Due 2026-27Thrushel
08SW104739 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
LYDFORD STW
Due 2026-27Upper River Lyd
08SW104740 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
LYDFORD STW
Due 2026-27Upper River Lyd
08SW100019 · gWFD_NDINV_WRHMWBInvestigation
Investigation into options to deliver flow naturalisation for the River Wolf waterbody downstream of Roadford. Consider implications for pump storage from the River Lyd and likely forthcoming source at Gatherley
Roadford and River Wolf HMWB ND Flow naturalisation
Due 2026-27Wolf
08SW104999 · cdEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
LYDFORD STW_SO_LYDFORD
Due 2027-28LYDFORD STW_SO_LYDFORD
08SW100102 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
LYDFORD STW_SO_LYDFORD
Due 2029-30LYDFORD STW_SO_LYDFORD

11 of 11 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.