What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme (England) and National Environment Programme (Wales) is how the Environment Agency and Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the EA and NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08DC100226 · l | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Aldford | Complete 2025-26 | ALDFORD |
| 08DC100227 · h | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Aldford | Complete 2025-26 | ALDFORD |
| 08DC100226 · d | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MALPAS | Complete 2025-26 | Bradley Brook |
| 08DC100227 · m | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) MALPAS | Complete 2025-26 | Bradley Brook |
| 08DC100226 · o | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Saighton WwTW | Complete 2025-26 | Henlake Brook |
| 08DC100227 · o | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Saighton WwTW | Complete 2025-26 | Henlake Brook |
| 08DC100227 · z | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) TATTENHALL | Complete 2025-26 | Aldford Brook |
| 08DC100226 · y | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) TATTENHALL | Complete 2025-26 | Aldford Brook |
| 08DC100227 · aa | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) TILSTON | Complete 2025-26 | TILSTON |
| 08DC100226 · z | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) TILSTON | Complete 2025-26 | TILSTON |
| DCWW100119a · 65e3d74f | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BANCYFELIN STW BANCYFELIN NEAR ST | Complete 2025-26 | Bangor on Dee WwTW Storm Overflow |
| DCWW100120a · 50be049a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BANGOR ON DEE STW | Complete 2025-26 | Bangor on Dee WwTW Storm Overflow |
| DCWW100168a · 49fef8ea | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CONNAHS QUAY STW | Complete 2025-26 | Connahs Quay WwTW Overflow |
| DCWW100223a · 002cef66 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ GREENFIELD WWTW (STW) GREENFIELD | Complete 2025-26 | Greenfield WwTW Storm Overflow |
| DCWW100231a · 0d961f3f | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ HOLT STW | Complete 2025-26 | Holt WwTW Storm Overflow |
| DCWW100239a · f0cebd55 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LAVISTER STW LAVISTER WREXHAM | Complete 2025-26 | Lavister Storm Overflow |
| DCWW100243a · 2e6793b2 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANASA WWTW COLLIERY ROAD TANLAN | Complete 2025-26 | Llanasa WwTW Storm Overflow |
| DCWW100321a · c719a082 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ NORTHOP WASTEWATER TREATMENT WORKS | Complete 2025-26 | Northop WwTW Settled Storm Overflow |
| DCWW100323a · 6dc440c8 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ OVERTON WWTW | Complete 2025-26 | Maelor Way Overton WwTW Storm Overflow |
| DCWW100331a · 868a405f | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PENLEY STW | Complete 2025-26 | Penley Hospital Storm Overflow |
| DCWW100354a · d057aa49 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ QUEENSFERRY WWTW | Complete 2025-26 | Queensferry WwTW Storm Overflow |
| 08DC100231 · a | WFD_NDINV_WRFlow | Investigation | Investigation into abstraction at Chester sewage works borehole CHESTER SEWAGE WORKS BOREHOLE invesitigation | Due 2026-27 | Finchetts Gutter |
| DCWW102225a · b73a781d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BAGILLT EAST SPS EOF | Due 2026-27 | Station Road Bagillt Storm Overflow |
| DCWW102655a · a92cf196 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BUCKLEY THE WILLOWS PS | Due 2026-27 | White Farm Road Buckley Overflow |
| DCWW102183a · 1e8821f6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAER ESTYN SPS | Due 2026-27 | Caer Estyn Storm Overflow |
| DCWW100221a · 2fd4ebc2 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ GREAT OAK (NR ABERGAVENNY) | Due 2026-27 | Greenfield WwTW Storm Overflow |
| DCWW102223a · 961e218a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Greenfield STW CSO | Due 2026-27 | Greenfield Terminal Overflow |
| DCWW102226a · 0a39c4f1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Greenfield Terminal CSO | Due 2026-27 | Greenfield Terminal Overflow |
| DCWW102180a · 5b31449a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HIGHER KINNERTON SPS CSO | Due 2026-27 | Higher Kinnerton Storm Overflow |
| DCWW102137a · 6792b596 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Liverpool Road Buckley | Due 2026-27 | Liverpool Road Buckley Storm Overflow |
| DCWW102656a · 9aa96e73 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Oakenholt Main SPS CSO | Due 2026-27 | Oakenholt Main Storm Overflow |
| DCWW101604a · 11036cbc | W_WFD_PG_IMP4 | Improvement | Implementation of actions to achieve good status at a waterbody and / or site level due to Phosphorus relating to Reasons for Not Achieving Good (RNAGs) identified against water company assets or activities and phosphorus status of the waterbody. WQ Penley | Due 2026-27 | Water body only |
| DCWW102184a · e454cee9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WREXHAM PULFORD - SSO | Due 2026-27 | Chester Road Pulford Storm Overflow |
| 08DC100239 · r | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at ALDFORD_SEWAGE_TREATMENT_WORKS to protect the environment so that they have no local adverse ecological impact. ALDFORD_SEWAGE_TREATMENT_WORKS | Due 2027-28 | ALDFORD |
| 08DC100239 · ai | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at BACHE_TANKS_CSO to protect the environment so that they have no local adverse ecological impact. BACHE_TANKS_CSO | Due 2027-28 | Finchetts Gutter |
| 08DC100239 · bw | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact. BARGATES_NO_2174_CSO | Due 2027-28 | Wych Upper (Worthenbury Upper) |
| 08DC100239 · s | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact. Bo_CSO | Due 2027-28 | The Groves Storm Overflow |
| 08DC100239 · aj | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at CHESTER_PARKGATE_COURT_SPS to protect the environment so that they have no local adverse ecological impact. CHESTER_PARKGATE_COURT_SPS | Due 2027-28 | Finchetts Gutter |
| 08DC100239 · v | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at CHRISTLETON_WHITCHURCH_ROAD_PS to protect the environment so that they have no local adverse ecological impact. CHRISTLETON_WHITCHURCH_ROAD_PS | Due 2027-28 | Whitchurch Road Storm Overflow |
| 08DC100239 · w | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at CSO_AT_TATTENHALL_STW to protect the environment so that they have no local adverse ecological impact. CSO_AT_TATTENHALL_STW | Due 2027-28 | Aldford Brook |
| 08DC100239 · x | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at CSO_TILSTON_SEWAGE_TREATMENT_WORKS to protect the environment so that they have no local adverse ecological impact. CSO_TILSTON_SEWAGE_TREATMENT_WORKS | Due 2027-28 | Aldford Brook |
| 08DC100239 · ar | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at DALESIDE_COMBINED_SEWER_OVERFLOW to protect the environment so that they have no local adverse ecological impact. DALESIDE_COMBINED_SEWER_OVERFLOW | Due 2027-28 | Finchetts Gutter |
| 08DC100239 · y | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at DEE_LANE_CSO to protect the environment so that they have no local adverse ecological impact. DEE_LANE_CSO | Due 2027-28 | The Groves Storm Overflow |
| 08DC100239 · z | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at DEVA_TERRACE_CSO to protect the environment so that they have no local adverse ecological impact. DEVA_TERRACE_CSO | Due 2027-28 | The Groves Storm Overflow |
| 08DC100239 · bx | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact. JUBILEE_PARK_NO_3175_CSO | Due 2027-28 | Wych Upper (Worthenbury Upper) |
| 08DC100239 · be | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at MARLSTON_CUM_LACHE_PS_SSO to protect the environment so that they have no local adverse ecological impact. MARLSTON_CUM_LACHE_PS_SSO | Due 2027-28 | Balderton drain |
| 08DC100239 · bf | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at MARLSTON-CUM-LACHE_PUMPING_STATION to protect the environment so that they have no local adverse ecological impact. MARLSTON-CUM-LACHE_PUMPING_STATION | Due 2027-28 | Balderton drain |
| 08DC100239 · ac | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at MILLBROOK_PARK_PUMPING_STATION to protect the environment so that they have no local adverse ecological impact. MILLBROOK_PARK_PUMPING_STATION | Due 2027-28 | Aldford Brook |
| 08DC100239 · bh | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at MOSTON_ROAD_CSO to protect the environment so that they have no local adverse ecological impact. MOSTON_ROAD_CSO | Due 2027-28 | Finchetts Gutter |
| 08DC100239 · ad | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at SAIGHTON_SEWAGE_TREATMENT_WORKS to protect the environment so that they have no local adverse ecological impact. SAIGHTON_SEWAGE_TREATMENT_WORKS | Due 2027-28 | SAIGHTON |
| 08DC100239 · bn | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at SAUGHALL_SEAHILL_ROAD_PS_CSO to protect the environment so that they have no local adverse ecological impact. SAUGHALL_SEAHILL_ROAD_PS_CSO | Due 2027-28 | Garden City Drain |
| 08DC100239 · bo | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at SAUGHALL_VILLAGE_CSO to protect the environment so that they have no local adverse ecological impact. SAUGHALL_VILLAGE_CSO | Due 2027-28 | Garden City Drain |
| 08DC100239 · bz | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact. SMALLBROOK_NO_2177_CSO | Due 2027-28 | Wych Upper (Worthenbury Upper) |
| 08DC100239 · bs | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at WEST_OF_WEALSTONE_LANE_CSO to protect the environment so that they have no local adverse ecological impact. WEST_OF_WEALSTONE_LANE_CSO | Due 2027-28 | Finchetts Gutter |
| 08DC100239 · cb | 25YEP_INV | Investigation | Investigations to reduce storm overflow spills at WHITCHURCH_(RISING_SUN)_WWTW to protect the environment so that they have no local adverse ecological impact. WHITCHURCH_(RISING_SUN)_WWTW | Due 2027-28 | Wych Upper (Worthenbury Upper) |
| DCWW102865a · 1b1718da | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper WQ LAVISTER WORKS (7CDC1098) | Due 2027-28 | LAVISTER STW STW |
| 08DC100238 · a | U_IMP4 | Improvement | improvements to reduce spill overflow frequency ALDFORD CSO | Due 2027-28 | Aldford Brook |
| 08DC100159 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Tattenhall | Due 2029-30 | Aldford Brook |
| DCWW101358a · 819dd034 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ARGOED PUMPING STATION | Due 2029-30 | Talacre Argoed Station Road Overflow |
| 08DC100155 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Backford STW | Due 2029-30 | Finchetts Gutter |
| DCWW101374a · 882b6763 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BAGILLT EAST SEWAGE PUMPING STATION, BAGILLT | Due 2029-30 | Station Road Bagillt Storm Overflow |
| DCWW101582a · 8ce8c0dd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BAGILLT GREENACRE DRIVE - SSO | Due 2029-30 | Greenacre Drive Bagillt Storm Overflow |
| DCWW102786a · 06edf777 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BAGILLT MANOR DRIVE VERGE OFF | Due 2029-30 | Manor Drive Storm Overflow |
| DCWW102836a · e3a9043e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BAGILLT STATION ROAD | Due 2029-30 | Station Road Bagillt Storm Overflow |
| DCWW102835a · cf71afce | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BAGILLT TYDDYN MESHAM LANE | Due 2029-30 | Old London Road Bagillt Storm Overflow |
| DCWW101375a · cd3709b1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BAGILLT WEST SEWAGE PUMPING STATION, BAGILLT | Due 2029-30 | Bagillt West Storm Overflow |
| DCWW102618a · 0a06fca6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BAGILLT WEST SPS EOF | Due 2029-30 | New Brighton Road Bagillt Overflow |
| DCWW101278a · 3a1084b7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BAGILLT, EIRANFA SEWAGE PUMPING STATION | Due 2029-30 | Station Road Bagillt Storm Overflow |
| DCWW101693a · 46b5d4d2 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ BANGOR ON DEE STW | Due 2029-30 | BANGOR ISYCOED |
| DCWW101693b · fb2b5773 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ BANGOR ON DEE STW | Due 2029-30 | BANGOR ISYCOED |
| DCWW101261a · 1d57b94e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BOOT AND SHIP PUMPING STATION | Due 2029-30 | New Brighton Road Bagillt Overflow |
| DCWW101582a · 1f98ece4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BRETTON PS | Due 2029-30 | Broughton Mills Road and Chester Road Bretton Storm Overflow |
| DCWW101397a · 06e21bad | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRETTON PUMPING STN, | Due 2029-30 | Broughton Mills Road and Chester Road Bretton Storm Overflow |
| DCWW101398a · 35aa0c63 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRETTON PUMPING STN, | Due 2029-30 | Broughton Mills Road Bretton Storm Overflow |
| DCWW101699a · 349f2ba8 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ BRONINGTON STW | Due 2029-30 | Water body only |
| DCWW101699b · 09272292 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ BRONNINGTON STW | Due 2029-30 | Water body only |
| DCWW101389a · cf004d1b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRYNFORD MAIN SEWAGE PUMPING STATION NO. 1, BRYNFORD, CLWYD | Due 2029-30 | Brynford Crooked Horn Overflow |
| DCWW101268a · 65bdc330 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BUCKLEY (THE WILLOWS) PUMPING STATION | Due 2029-30 | White Farm Road Buckley Overflow |
| DCWW101400a · 252648fb | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Buckley Southdown Park PS | Due 2029-30 | Aberllanerch Drive Storm Overflow |
| DCWW102830a · 7592a32e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BUCKLEY SOUTHDOWN PARK PS | Due 2029-30 | Aberllanerch Drive Storm Overflow |
| DCWW101414a · 46b354c3 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CAER ESTYN SEWAGE PUMPING STATION | Due 2029-30 | Caer Estyn Storm Overflow |
| DCWW101582a · 290073b8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cestrian St CSO | Due 2029-30 | Cestrian Street Connah's Quay Storm Overflow |
| 08DC100156 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Churton STW | Due 2029-30 | Aldford Brook |
| DCWW100663a · 36a33a7b | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ CONNAHS QUAY | Due 2029-30 | Connahs Quay WwTW Overflow |
| DCWW102831a · f021f979 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CONNAHS QUAY DEVA AVENUE | Due 2029-30 | Upper Bryn Road Connahs Quay Storm Overflow |
| DCWW101582a · cd4b53cb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Connahs Quay Dock Road PS | Due 2029-30 | Dock Road Connahs Quay Storm Overflow |
| DCWW101402a · a975fecc | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CONNAHS QUAY DOCK ROAD PS | Due 2029-30 | Dock Road Connahs Quay Storm Overflow |
| DCWW101582a · 2ecde01a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Connahs Quay Linden Avenue - CSO | Due 2029-30 | Linden Avenue Storm Overflow |
| DCWW102832a · 1397d8dd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CONNAHS QUAY LOW LEVEL PS | Due 2029-30 | Spring Street Connahs Quay Overflow |
| DCWW101401a · 002e1785 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Connahs Quay Low Level SPS, Spring Street, Connahs Quay, Flintshire | Due 2029-30 | Spring Street Connahs Quay Overflow |
| DCWW102506a · 267a684b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CONNAHS QUAY WEPRE PS | Due 2029-30 | Bridge Street Connahs Quay Storm Overflow |
| DCWW101391a · e99c27df | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CROOKED HORN SEWAGE PUMPING STATION NO. 3, BRYNFORD, CLWYD | Due 2029-30 | Brynford Crooked Horn Overflow |
| DCWW101582a · 3ec2bf2b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO Adjacent A548 Road Bridge | Due 2029-30 | A548 Road Bridge Storm Overflow |
| DCWW101582a · 047f2d74 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Pen-Y-Maes Road | Due 2029-30 | Nant Y Coed Pen Y Maes Overflow |
| DCWW101582a · 158cafd4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DISCHARGE A 14 FFORDD DDYFRDWY | Due 2029-30 | Fford Ddyfrdwy Maes Pennant A Storm Overflow |
| DCWW101582a · 4f10bed2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DISCHARGE B 14 FFORDD DDYFRDWY Mostyn, Flintshire | Due 2029-30 | Fford Ddyfrdwy Maes Pennant B Storm Overflow |
| DCWW101439a · 3e3991b8 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ DOBSHILL PUMPING STATION | Due 2029-30 | Dobshill Storm Overflow |
| DCWW102520a · d14d86bf | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DOBSHILL SPS | Due 2029-30 | Dobshill Storm Overflow |
| DCWW101582a · 64ad54f7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Eyton Grove SPS Erbistock, Eyton, Wrexham | Due 2029-30 | Eyton Grove Storm Overflow |
| DCWW101413a · ee05715a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ EYTON SEWAGE PUMPING STATION | Due 2029-30 | Eyton Grove Storm Overflow |
| DCWW101582a · 20223714 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Factory Road CSO, Sandycroft | Due 2029-30 | Factory Road Sandycroft Storm Overflow |
| DCWW101359a · 2ed8dade | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FFYNNON WEST PUMPING STATION | Due 2029-30 | Fairfield Avenue Ffynnongroew Overflow |
| DCWW102620a · b0e0086e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ FFYNNONGROEW TAN LAN BACH PS | Due 2029-30 | Ffynnongroew Tan Lan Bach Storm Overflow |
| DCWW102615a · db1affb7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ FFYNNONGROEW WEST PS | Due 2029-30 | Fairfield Avenue Ffynnongroew Overflow |
| DCWW101419a · 35c3c936 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FFYNNONGROYW TAN LAN BACH PS | Due 2029-30 | Ffynnongroew Tan Lan Bach Storm Overflow |
| DCWW101279a · 3099dee1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FLINT BARDYN PUMPING STATION | Due 2029-30 | Castle Road Flint Overflow |
| DCWW101436a · 1923cf97 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FLINT DEE COTTAGES PS | Due 2029-30 | Dee Cottages Storm Overflow |
| DCWW102846a · 797d1ce9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ FLINT DEE COTTAGES PS | Due 2029-30 | Dee Cottages Storm Overflow |
| DCWW101355a · 66233b1a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Flint Mountain Sewage Pumping Station | Due 2029-30 | Flint Mountain Storm Overflow |
| DCWW101269a · 63199212 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FLINT, THE MEADOWS PUMPING STATION | Due 2029-30 | The Meadows Flint Overflow |
| DCWW102519a · ce1f851f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Fun Ship , Llanerchymor CSO | Due 2029-30 | Llanerch-Y-Mor A548 Storm Overflow |
| DCWW102507a · 87fb1962 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Garden City Queensferry | Due 2029-30 | Welsh Road Roundabout Storm Overflow |
| DCWW102837a · 6b938378 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ GREENFIELD B5121/A548 JNCT NRA NR ABBEY | Due 2029-30 | A548 Road Bridge Storm Overflow |
| DCWW101582a · 65d2f4c5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ GREENFIELD IND EST NO 1 HOLYWELL | Due 2029-30 | Near Bagillt Road Greenfield Storm Overflow |
| DCWW101582a · 9ab6f3b3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ GWESPYR OLD STW - SSO | Due 2029-30 | Gwespyr Storm Overflow |
| DCWW101582a · 66b60b2b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HAWARDEN CROSS TREE LANE - SSO | Due 2029-30 | Cross Tree Lane Hawarden Storm Overflow |
| DCWW101396a · e218140f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ HIGHER KINNERTON PUMPING STATION/CSO | Due 2029-30 | Higher Kinnerton Storm Overflow |
| DCWW102516a · 71571f7e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HOLT NORTH OF NEAR RIVER DEE | Due 2029-30 | Holt Storm Overflow |
| DCWW101433a · 2bd5e76d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ HOLT PS | Due 2029-30 | Holt Storm Overflow |
| DCWW101733b · 8602fbc8 | W_HR_AMM_T_IMP1 | Improvement | Ammonia reduction to meet numeric permit limit
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ HOLT STW | Due 2029-30 | HOLT |
| DCWW101582a · 93d58b9f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HOLT STW | Due 2029-30 | Holt WwTW Storm Overflow |
| DCWW102829a · 0424a741 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HOLT STW | Due 2029-30 | Holt WwTW Storm Overflow |
| DCWW101733a · b1b31f10 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ HOLT STW | Due 2029-30 | HOLT |
| DCWW101385a · 880f07a5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ HOLT STW | Due 2029-30 | Holt WwTW Overflow |
| DCWW101582a · 7b6463cb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HOLYWELL CAR PARK STRAND WALK/RING RD | Due 2029-30 | Pen Y Maes Road Holywell Storm Overflow |
| DCWW101582a · 5abbe4a3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HOLYWELL STRAND WALK NR STRAND | Due 2029-30 | Greenfield Road Holywell Storm Overflow |
| DCWW101319a · 97b864ab | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Llanasa WwTW, | Due 2029-30 | Llanasa WwTW Storm Overflow |
| DCWW101488a · 338a2032 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LOWER DYSERTH PUMPING STATION | Due 2029-30 | Village Road Northop Hall Storm Overflow |
| 08DC100157 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Malpas STW | Due 2029-30 | Bradley Brook |
| DCWW101582a · ab765384 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MANCOT LANE CSO | Due 2029-30 | Mancot Lane Mancot Storm Overflow |
| DCWW101437a · cc9be14a | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MARSH FARM PUMPING STATION, COAST RD, MOSTYN, FLINTSHIRE | Due 2029-30 | Mostyn Coastal Road Storm Overflow |
| DCWW101582a · f997db03 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MERLLYN LANE BAGILLT | Due 2029-30 | Merllyn Lane Bagillt Storm Overflow |
| DCWW101378a · e736d305 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MOSTYN ARMS SEWAGE PUMPING STATION, MOSTYN | Due 2029-30 | Mostyn Coast Road Overflow |
| DCWW101379a · 9ba1024e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MOSTYN DOCKS CAR PARK SEWAGE PUMPING STATION | Due 2029-30 | Mostyn Docks Overflow |
| DCWW101582a · 7adb2697 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Northop Hall CSO | Due 2029-30 | Wared Drive Northhop Hall Storm Overflow |
| DCWW102518a · 725e964e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NORTHOP HALL OFF ST MARYS DRIVE | Due 2029-30 | Village Road Northop Hall Storm Overflow |
| DCWW101362a · 072d7e91 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NORTHOP HALL PUMPING STATION | Due 2029-30 | Village Road Northop Hall Storm Overflow |
| DCWW101489a · cb472ad4 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Northop Hall SPS | Due 2029-30 | Village Road Northop Hall Storm Overflow |
| DCWW101366a · 1424c01c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NORTHOP SEWAGE PUMPING STATION | Due 2029-30 | Northop WwTW Settled Storm Overflow |
| DCWW101363a · 7ec1b7b8 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Oakenholt SPS, Flint, CH6 5SE | Due 2029-30 | Oakenholt Main Storm Overflow |
| DCWW100678a · 103cae2c | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ OVERTON (NR WREXHAM) | Due 2029-30 | Maelor Way Overton WwTW Storm Overflow |
| DCWW102512a · 0506f7f1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ OVERTON (NR WREXHAM) STW | Due 2029-30 | Maelor Way Overton WwTW Storm Overflow |
| DCWW101740b · c12352c5 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ OVERTON WWTW | Due 2029-30 | OVERTON (Nr Wrexham) |
| DCWW101740a · 04052bd3 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ OVERTON WWTW | Due 2029-30 | OVERTON (Nr Wrexham) |
| DCWW101337a · 8aaa0122 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ OVERTON WwTW PUMPING STATION | Due 2029-30 | Maelor Way Overton WwTW Storm Overflow |
| DCWW102834a · 436e85ac | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PEN Y FFORDD ADJ PEN Y FFORDD DAIRYFARM | Due 2029-30 | Picton Road Pen Y Ffordd Storm Overflow |
| DCWW101582a · 46e4a3e7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PEN Y MAES PUMPING STATION | Due 2029-30 | Nant Y Coed Pen Y Maes Overflow |
| DCWW101458a · a4dccfe0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Pen y Maes Pumping station CSO & EO | Due 2029-30 | Nant Y Coed Pen Y Maes Overflow |
| DCWW102511a · f9074d32 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PENLEY (E OF CHIRK) PS | Due 2029-30 | Penley Hospital Storm Overflow |
| DCWW101411a · cb20d425 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Penley Pumping Station CSO, Penley Hospital, Penley LL13 0LH | Due 2029-30 | Penley Hospital Storm Overflow |
| DCWW101856b · dc6f77a9 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ PENLEY STW | Due 2029-30 | Water body only |
| DCWW102501a · a75bacf4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PENTRE HALKYN LLYGAIN-Y-WERN SPS CSO | Due 2029-30 | Pentre Halkyn Overflow |
| DCWW102497a · e2c9e557 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pentre Halkyn No.1 SPS CSO | Due 2029-30 | Pentre Halkyn Overflow |
| DCWW101356a · c73648c1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENTRE HALKYN PUMPING STATION | Due 2029-30 | Pentre Halkyn Overflow |
| DCWW101368a · 87e91df4 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENTRE HALKYN PUMPING STATION NEAR LYGAN-Y-WERN | Due 2029-30 | Llygain-Y-Wern Pentre Halkyn Storm Overflow |
| DCWW101457a · 38a1619b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Penyfford Terminal Pumping Station | Due 2029-30 | Penyffordd WwTW Storm Overflow |
| DCWW102550a · e2db3564 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penyffordd Transfer CSO | Due 2029-30 | Penyffordd WwTW Storm Overflow |
| DCWW102833a · ff88d311 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Phoenix Street Sandycroft | Due 2029-30 | Phoenix Street Sandycroft Storm Overflow |
| DCWW101364a · 32d06daf | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PUMPING STATION AT TAI-TREVOR, LLANNERCHYMOR | Due 2029-30 | Greenfield Knitmesh Overflow |
| DCWW101326a · 45015a39 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ QUEENSFERRY PENTRE SPS | Due 2029-30 | Queensferry WwTW Storm Overflow |
| DCWW101301a · 50b55326 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ QUEENSFERRY SEWAGE TREATMENT WORKS | Due 2029-30 | Queensferry WwTW Storm Overflow |
| DCWW102619a · bb261b2e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ QUEENSFERRY STW | Due 2029-30 | Queensferry WwTW Storm Overflow |
| DCWW101399a · 4958ef34 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ RECTORY COURT SPS, CHURCH ST, HOLT | Due 2029-30 | Water body only |
| DCWW102482a · e13550f9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ROSSETT LEVEL CROSSING | Due 2029-30 | Rossett Level Crossing Storm Overflow |
| DCWW101582a · dbc25ddf | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Saltney Bridge Street CSO | Due 2029-30 | Bridge Street Saltney Storm Overflow |
| DCWW101582a · 751f782c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Sandy Lane SPS Storm Overflow | Due 2029-30 | Saltney Sandy Lane Storm Overflow |
| DCWW101329a · 51b9ac8c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Sandy Lane SPS Storm Overflow, Celyn Crescent, Saltney, Chester, CH4 8UL | Due 2029-30 | Saltney Sandy Lane Storm Overflow |
| DCWW101388a · 94d2a9d4 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SEALAND PUMPING STATION IN SANDY LANE | Due 2029-30 | Welsh Road Roundabout Storm Overflow |
| DCWW101386a · 48387974 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SHOTTON - PUMPING STN. CHESTER ROAD WEST. | Due 2029-30 | Spring Street Connahs Quay Overflow |
| DCWW101387a · 76028fbd | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SHOTTON PUMPING STATION IN JUBILEE STREET | Due 2029-30 | Shotton Ash Grove Storm Overflow |
| DCWW101361a · fc2d298d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ STATION ROAD TALACRE PUMPING STATION | Due 2029-30 | Morfa Camp Overflow |
| DCWW101582a · c5b47811 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ SWN Y DWR CSO Coed Mor, Llanasa, Glan-yr-afon, | Due 2029-30 | Glanyrafon Terrace Storm Overflow |
| DCWW102616a · dac56345 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TALACRE (NR PRESTATYN) MORFA CAMP PS | Due 2029-30 | Morfa Camp Overflow |
| DCWW102843a · 3991a84e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TALACRE (NR PRESTATYN) STATION ROAD | Due 2029-30 | Talacre Road Storm Overflow |
| DCWW101420a · 43e0d040 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ TALACRE STATION ROAD PS | Due 2029-30 | Talacre Road Storm Overflow |
| 08DC100158 · a | WFD_IMPg | Improvement | WWTW improvement under WFD - Permit values Tilston STW | Due 2029-30 | TILSTON |
176 of 176 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.