DonateLog in
Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme (England) and National Environment Programme (Wales) is how the Environment Agency and Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the EA and NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

176
Measures in this catchment
WINEP and NEP, current record
155
Still active
not yet past their date
21
Assumed complete
completion date has passed
19
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08DC100226 · lU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Aldford
Complete 2025-26ALDFORD
08DC100227 · hU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Aldford
Complete 2025-26ALDFORD
08DC100226 · dU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
MALPAS
Complete 2025-26Bradley Brook
08DC100227 · mU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
MALPAS
Complete 2025-26Bradley Brook
08DC100226 · oU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Saighton WwTW
Complete 2025-26Henlake Brook
08DC100227 · oU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Saighton WwTW
Complete 2025-26Henlake Brook
08DC100227 · zU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
TATTENHALL
Complete 2025-26Aldford Brook
08DC100226 · yU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
TATTENHALL
Complete 2025-26Aldford Brook
08DC100227 · aaU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
TILSTON
Complete 2025-26TILSTON
08DC100226 · zU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
TILSTON
Complete 2025-26TILSTON
DCWW100119a · 65e3d74fW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BANCYFELIN STW BANCYFELIN NEAR ST
Complete 2025-26Bangor on Dee WwTW Storm Overflow
DCWW100120a · 50be049aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BANGOR ON DEE STW
Complete 2025-26Bangor on Dee WwTW Storm Overflow
DCWW100168a · 49fef8eaW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CONNAHS QUAY STW
Complete 2025-26Connahs Quay WwTW Overflow
DCWW100223a · 002cef66W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
GREENFIELD WWTW (STW) GREENFIELD
Complete 2025-26Greenfield WwTW Storm Overflow
DCWW100231a · 0d961f3fW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
HOLT STW
Complete 2025-26Holt WwTW Storm Overflow
DCWW100239a · f0cebd55W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LAVISTER STW LAVISTER WREXHAM
Complete 2025-26Lavister Storm Overflow
DCWW100243a · 2e6793b2W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANASA WWTW COLLIERY ROAD TANLAN
Complete 2025-26Llanasa WwTW Storm Overflow
DCWW100321a · c719a082W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
NORTHOP WASTEWATER TREATMENT WORKS
Complete 2025-26Northop WwTW Settled Storm Overflow
DCWW100323a · 6dc440c8W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
OVERTON WWTW
Complete 2025-26Maelor Way Overton WwTW Storm Overflow
DCWW100331a · 868a405fW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PENLEY STW
Complete 2025-26Penley Hospital Storm Overflow
DCWW100354a · d057aa49W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
QUEENSFERRY WWTW
Complete 2025-26Queensferry WwTW Storm Overflow
08DC100231 · aWFD_NDINV_WRFlowInvestigation
Investigation into abstraction at Chester sewage works borehole
CHESTER SEWAGE WORKS BOREHOLE invesitigation
Due 2026-27Finchetts Gutter
DCWW102225a · b73a781dW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BAGILLT EAST SPS EOF
Due 2026-27Station Road Bagillt Storm Overflow
DCWW102655a · a92cf196W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BUCKLEY THE WILLOWS PS
Due 2026-27White Farm Road Buckley Overflow
DCWW102183a · 1e8821f6W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CAER ESTYN SPS
Due 2026-27Caer Estyn Storm Overflow
DCWW100221a · 2fd4ebc2W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
GREAT OAK (NR ABERGAVENNY)
Due 2026-27Greenfield WwTW Storm Overflow
DCWW102223a · 961e218aW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Greenfield STW CSO
Due 2026-27Greenfield Terminal Overflow
DCWW102226a · 0a39c4f1W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Greenfield Terminal CSO
Due 2026-27Greenfield Terminal Overflow
DCWW102180a · 5b31449aW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HIGHER KINNERTON SPS CSO
Due 2026-27Higher Kinnerton Storm Overflow
DCWW102137a · 6792b596W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Liverpool Road Buckley
Due 2026-27Liverpool Road Buckley Storm Overflow
DCWW102656a · 9aa96e73W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Oakenholt Main SPS CSO
Due 2026-27Oakenholt Main Storm Overflow
DCWW101604a · 11036cbcW_WFD_PG_IMP4Improvement
Implementation of actions to achieve good status at a waterbody and / or site level due to Phosphorus relating to Reasons for Not Achieving Good (RNAGs) identified against water company assets or activities and phosphorus status of the waterbody.
WQ
Penley
Due 2026-27Water body only
DCWW102184a · e454cee9W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
WREXHAM PULFORD - SSO
Due 2026-27Chester Road Pulford Storm Overflow
08DC100239 · r25YEP_INVInvestigation
Investigations to reduce storm overflow spills at ALDFORD_SEWAGE_TREATMENT_WORKS to protect the environment so that they have no local adverse ecological impact.
ALDFORD_SEWAGE_TREATMENT_WORKS
Due 2027-28ALDFORD
08DC100239 · ai25YEP_INVInvestigation
Investigations to reduce storm overflow spills at BACHE_TANKS_CSO to protect the environment so that they have no local adverse ecological impact.
BACHE_TANKS_CSO
Due 2027-28Finchetts Gutter
08DC100239 · bw25YEP_INVInvestigation
Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact.
BARGATES_NO_2174_CSO
Due 2027-28Wych Upper (Worthenbury Upper)
08DC100239 · s25YEP_INVInvestigation
Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact.
Bo_CSO
Due 2027-28The Groves Storm Overflow
08DC100239 · aj25YEP_INVInvestigation
Investigations to reduce storm overflow spills at CHESTER_PARKGATE_COURT_SPS to protect the environment so that they have no local adverse ecological impact.
CHESTER_PARKGATE_COURT_SPS
Due 2027-28Finchetts Gutter
08DC100239 · v25YEP_INVInvestigation
Investigations to reduce storm overflow spills at CHRISTLETON_WHITCHURCH_ROAD_PS to protect the environment so that they have no local adverse ecological impact.
CHRISTLETON_WHITCHURCH_ROAD_PS
Due 2027-28Whitchurch Road Storm Overflow
08DC100239 · w25YEP_INVInvestigation
Investigations to reduce storm overflow spills at CSO_AT_TATTENHALL_STW to protect the environment so that they have no local adverse ecological impact.
CSO_AT_TATTENHALL_STW
Due 2027-28Aldford Brook
08DC100239 · x25YEP_INVInvestigation
Investigations to reduce storm overflow spills at CSO_TILSTON_SEWAGE_TREATMENT_WORKS to protect the environment so that they have no local adverse ecological impact.
CSO_TILSTON_SEWAGE_TREATMENT_WORKS
Due 2027-28Aldford Brook
08DC100239 · ar25YEP_INVInvestigation
Investigations to reduce storm overflow spills at DALESIDE_COMBINED_SEWER_OVERFLOW to protect the environment so that they have no local adverse ecological impact.
DALESIDE_COMBINED_SEWER_OVERFLOW
Due 2027-28Finchetts Gutter
08DC100239 · y25YEP_INVInvestigation
Investigations to reduce storm overflow spills at DEE_LANE_CSO to protect the environment so that they have no local adverse ecological impact.
DEE_LANE_CSO
Due 2027-28The Groves Storm Overflow
08DC100239 · z25YEP_INVInvestigation
Investigations to reduce storm overflow spills at DEVA_TERRACE_CSO to protect the environment so that they have no local adverse ecological impact.
DEVA_TERRACE_CSO
Due 2027-28The Groves Storm Overflow
08DC100239 · bx25YEP_INVInvestigation
Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact.
JUBILEE_PARK_NO_3175_CSO
Due 2027-28Wych Upper (Worthenbury Upper)
08DC100239 · be25YEP_INVInvestigation
Investigations to reduce storm overflow spills at MARLSTON_CUM_LACHE_PS_SSO to protect the environment so that they have no local adverse ecological impact.
MARLSTON_CUM_LACHE_PS_SSO
Due 2027-28Balderton drain
08DC100239 · bf25YEP_INVInvestigation
Investigations to reduce storm overflow spills at MARLSTON-CUM-LACHE_PUMPING_STATION to protect the environment so that they have no local adverse ecological impact.
MARLSTON-CUM-LACHE_PUMPING_STATION
Due 2027-28Balderton drain
08DC100239 · ac25YEP_INVInvestigation
Investigations to reduce storm overflow spills at MILLBROOK_PARK_PUMPING_STATION to protect the environment so that they have no local adverse ecological impact.
MILLBROOK_PARK_PUMPING_STATION
Due 2027-28Aldford Brook
08DC100239 · bh25YEP_INVInvestigation
Investigations to reduce storm overflow spills at MOSTON_ROAD_CSO to protect the environment so that they have no local adverse ecological impact.
MOSTON_ROAD_CSO
Due 2027-28Finchetts Gutter
08DC100239 · ad25YEP_INVInvestigation
Investigations to reduce storm overflow spills at SAIGHTON_SEWAGE_TREATMENT_WORKS to protect the environment so that they have no local adverse ecological impact.
SAIGHTON_SEWAGE_TREATMENT_WORKS
Due 2027-28SAIGHTON
08DC100239 · bn25YEP_INVInvestigation
Investigations to reduce storm overflow spills at SAUGHALL_SEAHILL_ROAD_PS_CSO to protect the environment so that they have no local adverse ecological impact.
SAUGHALL_SEAHILL_ROAD_PS_CSO
Due 2027-28Garden City Drain
08DC100239 · bo25YEP_INVInvestigation
Investigations to reduce storm overflow spills at SAUGHALL_VILLAGE_CSO to protect the environment so that they have no local adverse ecological impact.
SAUGHALL_VILLAGE_CSO
Due 2027-28Garden City Drain
08DC100239 · bz25YEP_INVInvestigation
Investigations to reduce storm overflow spills to protect the environment so that they have no local adverse ecological impact.
SMALLBROOK_NO_2177_CSO
Due 2027-28Wych Upper (Worthenbury Upper)
08DC100239 · bs25YEP_INVInvestigation
Investigations to reduce storm overflow spills at WEST_OF_WEALSTONE_LANE_CSO to protect the environment so that they have no local adverse ecological impact.
WEST_OF_WEALSTONE_LANE_CSO
Due 2027-28Finchetts Gutter
08DC100239 · cb25YEP_INVInvestigation
Investigations to reduce storm overflow spills at WHITCHURCH_(RISING_SUN)_WWTW to protect the environment so that they have no local adverse ecological impact.
WHITCHURCH_(RISING_SUN)_WWTW
Due 2027-28Wych Upper (Worthenbury Upper)
DCWW102865a · 1b1718daW_WFD_PD_IMPImprovement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper
WQ
LAVISTER WORKS (7CDC1098)
Due 2027-28LAVISTER STW STW
08DC100238 · aU_IMP4Improvement
improvements to reduce spill overflow frequency
ALDFORD CSO
Due 2027-28Aldford Brook
08DC100159 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Tattenhall
Due 2029-30Aldford Brook
DCWW101358a · 819dd034W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ARGOED PUMPING STATION
Due 2029-30Talacre Argoed Station Road Overflow
08DC100155 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Backford STW
Due 2029-30Finchetts Gutter
DCWW101374a · 882b6763W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BAGILLT EAST SEWAGE PUMPING STATION, BAGILLT
Due 2029-30Station Road Bagillt Storm Overflow
DCWW101582a · 8ce8c0ddW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BAGILLT GREENACRE DRIVE - SSO
Due 2029-30Greenacre Drive Bagillt Storm Overflow
DCWW102786a · 06edf777W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BAGILLT MANOR DRIVE VERGE OFF
Due 2029-30Manor Drive Storm Overflow
DCWW102836a · e3a9043eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BAGILLT STATION ROAD
Due 2029-30Station Road Bagillt Storm Overflow
DCWW102835a · cf71afceW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BAGILLT TYDDYN MESHAM LANE
Due 2029-30Old London Road Bagillt Storm Overflow
DCWW101375a · cd3709b1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BAGILLT WEST SEWAGE PUMPING STATION, BAGILLT
Due 2029-30Bagillt West Storm Overflow
DCWW102618a · 0a06fca6W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BAGILLT WEST SPS EOF
Due 2029-30New Brighton Road Bagillt Overflow
DCWW101278a · 3a1084b7W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BAGILLT, EIRANFA SEWAGE PUMPING STATION
Due 2029-30Station Road Bagillt Storm Overflow
DCWW101693a · 46b5d4d2W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
BANGOR ON DEE STW
Due 2029-30BANGOR ISYCOED
DCWW101693b · fb2b5773W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
BANGOR ON DEE STW
Due 2029-30BANGOR ISYCOED
DCWW101261a · 1d57b94eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BOOT AND SHIP PUMPING STATION
Due 2029-30New Brighton Road Bagillt Overflow
DCWW101582a · 1f98ece4W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BRETTON PS
Due 2029-30Broughton Mills Road and Chester Road Bretton Storm Overflow
DCWW101397a · 06e21badW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BRETTON PUMPING STN,
Due 2029-30Broughton Mills Road and Chester Road Bretton Storm Overflow
DCWW101398a · 35aa0c63W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BRETTON PUMPING STN,
Due 2029-30Broughton Mills Road Bretton Storm Overflow
DCWW101699a · 349f2ba8W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
BRONINGTON STW
Due 2029-30Water body only
DCWW101699b · 09272292W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
BRONNINGTON STW
Due 2029-30Water body only
DCWW101389a · cf004d1bW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BRYNFORD MAIN SEWAGE PUMPING STATION NO. 1, BRYNFORD, CLWYD
Due 2029-30Brynford Crooked Horn Overflow
DCWW101268a · 65bdc330W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BUCKLEY (THE WILLOWS) PUMPING STATION
Due 2029-30White Farm Road Buckley Overflow
DCWW101400a · 252648fbW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Buckley Southdown Park PS
Due 2029-30Aberllanerch Drive Storm Overflow
DCWW102830a · 7592a32eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BUCKLEY SOUTHDOWN PARK PS
Due 2029-30Aberllanerch Drive Storm Overflow
DCWW101414a · 46b354c3W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CAER ESTYN SEWAGE PUMPING STATION
Due 2029-30Caer Estyn Storm Overflow
DCWW101582a · 290073b8W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Cestrian St CSO
Due 2029-30Cestrian Street Connah's Quay Storm Overflow
08DC100156 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Churton STW
Due 2029-30Aldford Brook
DCWW100663a · 36a33a7bW_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
CONNAHS QUAY
Due 2029-30Connahs Quay WwTW Overflow
DCWW102831a · f021f979W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CONNAHS QUAY DEVA AVENUE
Due 2029-30Upper Bryn Road Connahs Quay Storm Overflow
DCWW101582a · cd4b53cbW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Connahs Quay Dock Road PS
Due 2029-30Dock Road Connahs Quay Storm Overflow
DCWW101402a · a975feccW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CONNAHS QUAY DOCK ROAD PS
Due 2029-30Dock Road Connahs Quay Storm Overflow
DCWW101582a · 2ecde01aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Connahs Quay Linden Avenue - CSO
Due 2029-30Linden Avenue Storm Overflow
DCWW102832a · 1397d8ddW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CONNAHS QUAY LOW LEVEL PS
Due 2029-30Spring Street Connahs Quay Overflow
DCWW101401a · 002e1785W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Connahs Quay Low Level SPS, Spring Street, Connahs Quay, Flintshire
Due 2029-30Spring Street Connahs Quay Overflow
DCWW102506a · 267a684bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CONNAHS QUAY WEPRE PS
Due 2029-30Bridge Street Connahs Quay Storm Overflow
DCWW101391a · e99c27dfW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CROOKED HORN SEWAGE PUMPING STATION NO. 3, BRYNFORD, CLWYD
Due 2029-30Brynford Crooked Horn Overflow
DCWW101582a · 3ec2bf2bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO Adjacent A548 Road Bridge
Due 2029-30A548 Road Bridge Storm Overflow
DCWW101582a · 047f2d74W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Pen-Y-Maes Road
Due 2029-30Nant Y Coed Pen Y Maes Overflow
DCWW101582a · 158cafd4W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
DISCHARGE A 14 FFORDD DDYFRDWY
Due 2029-30Fford Ddyfrdwy Maes Pennant A Storm Overflow
DCWW101582a · 4f10bed2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
DISCHARGE B 14 FFORDD DDYFRDWY Mostyn, Flintshire
Due 2029-30Fford Ddyfrdwy Maes Pennant B Storm Overflow
DCWW101439a · 3e3991b8W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
DOBSHILL PUMPING STATION
Due 2029-30Dobshill Storm Overflow
DCWW102520a · d14d86bfW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
DOBSHILL SPS
Due 2029-30Dobshill Storm Overflow
DCWW101582a · 64ad54f7W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Eyton Grove SPS Erbistock, Eyton, Wrexham
Due 2029-30Eyton Grove Storm Overflow
DCWW101413a · ee05715aW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
EYTON SEWAGE PUMPING STATION
Due 2029-30Eyton Grove Storm Overflow
DCWW101582a · 20223714W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Factory Road CSO, Sandycroft
Due 2029-30Factory Road Sandycroft Storm Overflow
DCWW101359a · 2ed8dadeW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FFYNNON WEST PUMPING STATION
Due 2029-30Fairfield Avenue Ffynnongroew Overflow
DCWW102620a · b0e0086eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
FFYNNONGROEW TAN LAN BACH PS
Due 2029-30Ffynnongroew Tan Lan Bach Storm Overflow
DCWW102615a · db1affb7W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
FFYNNONGROEW WEST PS
Due 2029-30Fairfield Avenue Ffynnongroew Overflow
DCWW101419a · 35c3c936W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FFYNNONGROYW TAN LAN BACH PS
Due 2029-30Ffynnongroew Tan Lan Bach Storm Overflow
DCWW101279a · 3099dee1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FLINT BARDYN PUMPING STATION
Due 2029-30Castle Road Flint Overflow
DCWW101436a · 1923cf97W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FLINT DEE COTTAGES PS
Due 2029-30Dee Cottages Storm Overflow
DCWW102846a · 797d1ce9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
FLINT DEE COTTAGES PS
Due 2029-30Dee Cottages Storm Overflow
DCWW101355a · 66233b1aW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Flint Mountain Sewage Pumping Station
Due 2029-30Flint Mountain Storm Overflow
DCWW101269a · 63199212W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
FLINT, THE MEADOWS PUMPING STATION
Due 2029-30The Meadows Flint Overflow
DCWW102519a · ce1f851fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Fun Ship , Llanerchymor CSO
Due 2029-30Llanerch-Y-Mor A548 Storm Overflow
DCWW102507a · 87fb1962W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Garden City Queensferry
Due 2029-30Welsh Road Roundabout Storm Overflow
DCWW102837a · 6b938378W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
GREENFIELD B5121/A548 JNCT NRA NR ABBEY
Due 2029-30A548 Road Bridge Storm Overflow
DCWW101582a · 65d2f4c5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
GREENFIELD IND EST NO 1 HOLYWELL
Due 2029-30Near Bagillt Road Greenfield Storm Overflow
DCWW101582a · 9ab6f3b3W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
GWESPYR OLD STW - SSO
Due 2029-30Gwespyr Storm Overflow
DCWW101582a · 66b60b2bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HAWARDEN CROSS TREE LANE - SSO
Due 2029-30Cross Tree Lane Hawarden Storm Overflow
DCWW101396a · e218140fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HIGHER KINNERTON PUMPING STATION/CSO
Due 2029-30Higher Kinnerton Storm Overflow
DCWW102516a · 71571f7eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HOLT NORTH OF NEAR RIVER DEE
Due 2029-30Holt Storm Overflow
DCWW101433a · 2bd5e76dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HOLT PS
Due 2029-30Holt Storm Overflow
DCWW101733b · 8602fbc8W_HR_AMM_T_IMP1Improvement
Ammonia reduction to meet numeric permit limit Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
HOLT STW
Due 2029-30HOLT
DCWW101582a · 93d58b9fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HOLT STW
Due 2029-30Holt WwTW Storm Overflow
DCWW102829a · 0424a741W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HOLT STW
Due 2029-30Holt WwTW Storm Overflow
DCWW101733a · b1b31f10W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
HOLT STW
Due 2029-30HOLT
DCWW101385a · 880f07a5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HOLT STW
Due 2029-30Holt WwTW Overflow
DCWW101582a · 7b6463cbW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HOLYWELL CAR PARK STRAND WALK/RING RD
Due 2029-30Pen Y Maes Road Holywell Storm Overflow
DCWW101582a · 5abbe4a3W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HOLYWELL STRAND WALK NR STRAND
Due 2029-30Greenfield Road Holywell Storm Overflow
DCWW101319a · 97b864abW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Llanasa WwTW,
Due 2029-30Llanasa WwTW Storm Overflow
DCWW101488a · 338a2032W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LOWER DYSERTH PUMPING STATION
Due 2029-30Village Road Northop Hall Storm Overflow
08DC100157 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Malpas STW
Due 2029-30Bradley Brook
DCWW101582a · ab765384W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MANCOT LANE CSO
Due 2029-30Mancot Lane Mancot Storm Overflow
DCWW101437a · cc9be14aW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MARSH FARM PUMPING STATION, COAST RD, MOSTYN, FLINTSHIRE
Due 2029-30Mostyn Coastal Road Storm Overflow
DCWW101582a · f997db03W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MERLLYN LANE BAGILLT
Due 2029-30Merllyn Lane Bagillt Storm Overflow
DCWW101378a · e736d305W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MOSTYN ARMS SEWAGE PUMPING STATION, MOSTYN
Due 2029-30Mostyn Coast Road Overflow
DCWW101379a · 9ba1024eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MOSTYN DOCKS CAR PARK SEWAGE PUMPING STATION
Due 2029-30Mostyn Docks Overflow
DCWW101582a · 7adb2697W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Northop Hall CSO
Due 2029-30Wared Drive Northhop Hall Storm Overflow
DCWW102518a · 725e964eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NORTHOP HALL OFF ST MARYS DRIVE
Due 2029-30Village Road Northop Hall Storm Overflow
DCWW101362a · 072d7e91W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
NORTHOP HALL PUMPING STATION
Due 2029-30Village Road Northop Hall Storm Overflow
DCWW101489a · cb472ad4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Northop Hall SPS
Due 2029-30Village Road Northop Hall Storm Overflow
DCWW101366a · 1424c01cW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
NORTHOP SEWAGE PUMPING STATION
Due 2029-30Northop WwTW Settled Storm Overflow
DCWW101363a · 7ec1b7b8W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Oakenholt SPS, Flint, CH6 5SE
Due 2029-30Oakenholt Main Storm Overflow
DCWW100678a · 103cae2cW_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
OVERTON (NR WREXHAM)
Due 2029-30Maelor Way Overton WwTW Storm Overflow
DCWW102512a · 0506f7f1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
OVERTON (NR WREXHAM) STW
Due 2029-30Maelor Way Overton WwTW Storm Overflow
DCWW101740b · c12352c5W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
OVERTON WWTW
Due 2029-30OVERTON (Nr Wrexham)
DCWW101740a · 04052bd3W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
OVERTON WWTW
Due 2029-30OVERTON (Nr Wrexham)
DCWW101337a · 8aaa0122W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
OVERTON WwTW PUMPING STATION
Due 2029-30Maelor Way Overton WwTW Storm Overflow
DCWW102834a · 436e85acW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PEN Y FFORDD ADJ PEN Y FFORDD DAIRYFARM
Due 2029-30Picton Road Pen Y Ffordd Storm Overflow
DCWW101582a · 46e4a3e7W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PEN Y MAES PUMPING STATION
Due 2029-30Nant Y Coed Pen Y Maes Overflow
DCWW101458a · a4dccfe0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Pen y Maes Pumping station CSO & EO
Due 2029-30Nant Y Coed Pen Y Maes Overflow
DCWW102511a · f9074d32W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PENLEY (E OF CHIRK) PS
Due 2029-30Penley Hospital Storm Overflow
DCWW101411a · cb20d425W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Penley Pumping Station CSO, Penley Hospital, Penley LL13 0LH
Due 2029-30Penley Hospital Storm Overflow
DCWW101856b · dc6f77a9W_HR_AMM_T_IMP1Improvement
Operational costs relating to Ammonia permit condition Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
PENLEY STW
Due 2029-30Water body only
DCWW102501a · a75bacf4W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PENTRE HALKYN LLYGAIN-Y-WERN SPS CSO
Due 2029-30Pentre Halkyn Overflow
DCWW102497a · e2c9e557W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Pentre Halkyn No.1 SPS CSO
Due 2029-30Pentre Halkyn Overflow
DCWW101356a · c73648c1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PENTRE HALKYN PUMPING STATION
Due 2029-30Pentre Halkyn Overflow
DCWW101368a · 87e91df4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PENTRE HALKYN PUMPING STATION NEAR LYGAN-Y-WERN
Due 2029-30Llygain-Y-Wern Pentre Halkyn Storm Overflow
DCWW101457a · 38a1619bW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Penyfford Terminal Pumping Station
Due 2029-30Penyffordd WwTW Storm Overflow
DCWW102550a · e2db3564W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Penyffordd Transfer CSO
Due 2029-30Penyffordd WwTW Storm Overflow
DCWW102833a · ff88d311W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Phoenix Street Sandycroft
Due 2029-30Phoenix Street Sandycroft Storm Overflow
DCWW101364a · 32d06dafW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PUMPING STATION AT TAI-TREVOR, LLANNERCHYMOR
Due 2029-30Greenfield Knitmesh Overflow
DCWW101326a · 45015a39W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
QUEENSFERRY PENTRE SPS
Due 2029-30Queensferry WwTW Storm Overflow
DCWW101301a · 50b55326W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
QUEENSFERRY SEWAGE TREATMENT WORKS
Due 2029-30Queensferry WwTW Storm Overflow
DCWW102619a · bb261b2eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
QUEENSFERRY STW
Due 2029-30Queensferry WwTW Storm Overflow
DCWW101399a · 4958ef34W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
RECTORY COURT SPS, CHURCH ST, HOLT
Due 2029-30Water body only
DCWW102482a · e13550f9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ROSSETT LEVEL CROSSING
Due 2029-30Rossett Level Crossing Storm Overflow
DCWW101582a · dbc25ddfW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Saltney Bridge Street CSO
Due 2029-30Bridge Street Saltney Storm Overflow
DCWW101582a · 751f782cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Sandy Lane SPS Storm Overflow
Due 2029-30Saltney Sandy Lane Storm Overflow
DCWW101329a · 51b9ac8cW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Sandy Lane SPS Storm Overflow, Celyn Crescent, Saltney, Chester, CH4 8UL
Due 2029-30Saltney Sandy Lane Storm Overflow
DCWW101388a · 94d2a9d4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
SEALAND PUMPING STATION IN SANDY LANE
Due 2029-30Welsh Road Roundabout Storm Overflow
DCWW101386a · 48387974W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
SHOTTON - PUMPING STN. CHESTER ROAD WEST.
Due 2029-30Spring Street Connahs Quay Overflow
DCWW101387a · 76028fbdW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
SHOTTON PUMPING STATION IN JUBILEE STREET
Due 2029-30Shotton Ash Grove Storm Overflow
DCWW101361a · fc2d298dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
STATION ROAD TALACRE PUMPING STATION
Due 2029-30Morfa Camp Overflow
DCWW101582a · c5b47811W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
SWN Y DWR CSO Coed Mor, Llanasa, Glan-yr-afon,
Due 2029-30Glanyrafon Terrace Storm Overflow
DCWW102616a · dac56345W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TALACRE (NR PRESTATYN) MORFA CAMP PS
Due 2029-30Morfa Camp Overflow
DCWW102843a · 3991a84eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TALACRE (NR PRESTATYN) STATION ROAD
Due 2029-30Talacre Road Storm Overflow
DCWW101420a · 43e0d040W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
TALACRE STATION ROAD PS
Due 2029-30Talacre Road Storm Overflow
08DC100158 · aWFD_IMPgImprovement
WWTW improvement under WFD - Permit values
Tilston STW
Due 2029-30TILSTON

176 of 176 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.