DonateLog in
← Park Avenue Whitchurch Storm Overflow

Spill evidence · River Hub

Park Avenue Whitchurch Storm Overflow

Combined sewer overflow · DCWW1772 · feeds WHITCHURCH STW
Wet weather

The discharge

Spill day
Friday, 20 February 2026
Started
20 Feb 2026, 16:01
Ended
20 Feb 2026, 16:30
Duration
28 minutes 51 seconds
Receiving water
—
Parish or community
—

Rainfall evidence

Daily rainfall at the matched gauge (Five Fords Raingauge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
20/02/2026 (spill day)7.6 mmrain
19/02/20264.4 mmrain
18/02/20263.2 mmrain
17/02/20260 mmdry
16/02/20260.4 mmrain

River flow that day: 16.647 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 18.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not a bathing-water overflow
Shellfish water
Not a shellfish-water overflow
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA and NRW gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Dŵr Cymru Welsh Water live storm overflow feed, read hourly by River Hub (outlet DCWW1772). Rainfall: EA Hydrology or NRW telemetry gauge H067546191. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Lower Dee and estuary Data.